Home / Browse projects / Thane, Maharashtra / OSTWAL DARSHAN

Completed No litigation declared Residential / Group Housing project

OSTWAL DARSHAN

By SHREE OSTWAL BUILDERS LTD

RG-MH-12271 · RERA P51700004905 · Last updated on MahaRERA portal: 14 Jan 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 5 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

OSTWAL DARSHAN is a Residential / Group Housing project by SHREE OSTWAL BUILDERS LTD in Thane, Maharashtra, registered with MahaRERA as P51700004905 on 9 Aug 2017. The registration is recorded completed; possession was promised by 29 Dec 2024. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameOSTWAL DARSHAN
  • TypeResidential / Group Housing
  • Location
    • JESAL PARK
    • BHAYANDER EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700004905
  • ReraGenie IDRG-MH-12271

Builder

  • NameSHREE OSTWAL BUILDERS LTD
  • Entity typeCompany
  • CINU45200MH1989PLC050872
  • GSTIN27AAFCS2523N1Z4
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorUMRAOSINGH PRITHVIRAJ OSTWAL
  • Other registrations19 more →
  • Completed7 of 20
  • Past their filed date1
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion29 Dec 2024
  • Revised completionRevised to 29 Dec 2024 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed65 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OSTWAL DARSHANNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

OSTWAL DARSHAN: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes67%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes25%
Open ParkingYes50%

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered70
Open Space20

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,044 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8958.45
Proposed, not sanctioned5,228 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIRA BHAYANDER ROAD, MIRA ROAD EAST, THANE -401107

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJS CONSULTANT
EngineerDWIJEN BHATT
EngineerBHAVESH TODANKAR
EngineerSHUBHAM MUKESH OSTWAL
PartnerRole in project
SHREE OSTWAL BUILDERS LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018500Dec 2023 → Dec 2024

Reason as filed by the promoterDUE TO REVISED CC WORK TO BE COMPLETED AND APPLICATION OF FULL OC TO BE DONE

Litigation declared4

CaseCourtStatus
RCS 69/2014THANEPENDING
MCA 91/2014THANEPENDING
451/2013THANEPENDING
120/2022Civil Court ThanePending for Hearing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000209786Narayansingh RathoreShree Ostwal Builders Ltd.23/01/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Jul 2024

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 _OSTWAL DARSHAN_OC.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_OSTWAL DARSHAN.pdf20 Oct 2024
OtherFile: Ostwal Darshan Self Certification 30092024.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Ostwal Darshan 30092024.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Darshan Quality Assurance Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Darshan Sold Unsold Ostwal 30062024.pdf20 Jul 2024
OtherFile: Darshan Self Declaration as on 30062024.pdf20 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 26 06 2024.pdf17 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC PLAN 26 06 2024.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance_Darshan_March-2024.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold_ Darshan.pdf16 Apr 2024
OtherFile: Self Declaration_ Darshan.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_OSTWAL DARSHAN.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: 1 - DARSHAN - Discloser Sold Unsold Inventory.pdf15 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENG CERT DARSHAN.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: DARSHAN.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM2A Ostwal Darshan.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY Ostwal darshan.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: DARSHAN - 2A QUALITY.pdf14 Apr 2023
Disclosure of sold/ booked inventoryFile: DARSHAN - SOLD UNSOLD.pdf14 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Ostwal darshan.pdf27 Jan 2023
Disclosure of sold/ booked inventoryFile: DARSHAN.pdf20 Jan 2023
Details of encumbrancesFile: ENCRUMBRANCE OSTWAL DARSHAN.pdf2 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION DARSHAN.pdf2 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OSTWAL DARSHAN ARCHITECT CERTIFICATE.pdf29 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OSTWAL DARSHAN ENGG CERTIFICATE.pdf29 Jul 2022
Certificates of CA (Form 3)File: OSTWAL DARSHAN CA CERTIFICATE_11zon.pdf29 Jul 2022
Layout approvalFile: LAYOUT.pdf27 Dec 2021
Building plan approvalFile: 1.pdf27 Dec 2021
Building plan approvalFile: 4.pdf27 Dec 2021
Building plan approvalFile: 5.pdf27 Dec 2021
Building plan approvalFile: 6.pdf27 Dec 2021
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf27 Dec 2021
Building Plan Approval (IOD)File: 1.pdf27 Dec 2021
Building Plan Approval (IOD)File: 4.pdf27 Dec 2021
Building Plan Approval (IOD)File: 5.pdf27 Dec 2021
Building Plan Approval (IOD)File: 6.pdf27 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf27 Dec 2021
Declaration about Commencement CertificateFile: 2.pdf27 Dec 2021
Copy of the legal title reportFile: Ostwal Darshan Title.pdf3 Dec 2021
Copy of the legal title reportFile: Title Certificate.pdf29 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ostwal Darshan Form 2A.pdf9 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Ostwal Darshan Form 2A.pdf9 Aug 2021
Certificates of CA (Form 5)File: darshan 1.pdf15 Oct 2018
OtherFile: oc of darshan FINAL.pdf6 Oct 2018
Certificates of CA (Form 3)File: CCI22018_0004.pdf22 Aug 2018
OtherFile: DARSHAN.pdf9 Jun 2018
OtherFile: DARSHAN.pdf9 Jun 2018
Certificates of CA (Form 3)File: sep.pdf23 May 2018
Certificates of CA (Form 3)File: dec.pdf23 May 2018
Certificates of CA (Form 3)File: march.pdf23 May 2018
Details of encumbrancesFile: E-Certificate DARSHAN.pdf28 Jul 2017
Declaration in FORM BFile: FORM B DARSHAN.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 DARSHAN.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 DARSHAN.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA CERTFICATE DARSHAN.pdf28 Jul 2017
Proforma of Allotment letterFile: AGREEMENT Darshan-Rera.pdf28 Jul 2017
Copy of the legal title reportFile: Darshan TITLE CERTIFICATE.pdf23 Jul 2017
Layout approvalFile: APPROVED PLAN.pdf21 Jul 2017
Building plan approvalFile: NA NOC.pdf21 Jul 2017
PAN CardFile: SOBL New Pan Card.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: APPROVED PLAN.pdf21 Jul 2017
Building Plan Approval (IOD)File: NA NOC.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf21 Jul 2017
OtherFile: PLAN UPLOAD.pdf21 Jul 2017

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
OSTWAL WOODSP99000019832OPP. UNION PARK, Palghar-Mar 2019CompletedDec 2024Jun 2023
OSTWAL GARDENKANAKIA ROAD MIRA ROAD EAST69-CompletedDec 2015Jun 2015
OSTWAL OASISMIRA ROAD EAST33-CompletedApr 2015Jan 2015
OSTWAL PRIDE IKANAKIA ROAD MIRA ROAD EAST63-CompletedMar 2015Mar 2015
OSTWAL HEIGHT BLDG 1 TO 4KANAKIA ROAD MIRA ROAD EAST195-CompletedDec 2013Dec 2013

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OSTWAL DARSHAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDER EAST7,600+ in Thane

2 kmOSTWAL DARSHANCompleted 14Lapsed / revoked 17Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 72 registered projects within 2 km.

Builder: SHREE OSTWAL BUILDERS LTD

SHREE OSTWAL BUILDERS LTD has 20 registrations on MahaRERA, including OSTWAL DARSHAN and OSTWAL POINT. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if OSTWAL DARSHAN is delayed beyond 29 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OSTWAL DARSHAN?

The registered promoter entity is SHREE OSTWAL BUILDERS LTD, a company as per the filing. Its CIN U45200MH1989PLC050872 and GSTIN 27AAFCS2523N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OSTWAL DARSHAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against OSTWAL DARSHAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for OSTWAL DARSHAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OSTWAL DARSHAN?

The professionals named in the filing: Architect: TEJS CONSULTANT; Engineer: DWIJEN BHATT; Engineer: BHAVESH TODANKAR; Engineer: SHUBHAM MUKESH OSTWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OSTWAL DARSHAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OSTWAL DARSHAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OSTWAL DARSHAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.