ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / OPULIS B

Registered No litigation declared Residential / Group Housing project

OPULIS B

By LODHA DEVELOPERS LIMITED

RG-MH-23723 · RERA P51700079035 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Nov 2030Possession promisedmoved 6 months from the original
3 of 11Construction stages donefurthest along: Podiums (if any), 0%
70 of 151Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

OPULIS B is a Residential / Group Housing project by LODHA DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700079035 on 31 Jan 2025. Possession is promised by 30 Nov 2030. The completion date has moved by 6 months from the original filing. 81 of the 151 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameOPULIS B
  • TypeResidential / Group Housing
  • Location
    • Kole
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • RERA no.P51700079035
  • ReraGenie IDRG-MH-23723

Builder

  • NameLODHA DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • MdAbhishek Mangalprabhat Lodha
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredJan 2025First promiseMay 2030Revised toNov 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2025
  • Promised completion30 Nov 2030
  • Revised completionRevised to 30 Nov 2030 (originally 31 May 2030)
  • Buildings1 building record
  • Documents filed69 files

Current status

54%81 of 151 units booked
20.0%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sector P Cluster 16 Point 01 Wing BNA38381510151

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Sector P Cluster 16 Point 01 Wing B: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed540

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots540
Closed/Covered270
Open Space270

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,314 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Oct 2025
LandownerVillageDistrict
The Premier Automobile Company LimitedKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityDirectorate of Town Planning & Valuation, Thane
Permissible FSI23708.4
Proposed, not sanctioned23,708 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINDUSIND HOUSE, 425, DADASAHEB BHADKAMKAR MARG MUMBAI - 400 004
Estimated costRs 126.00 cr
Cost incurredRs 25.15 cr
Work done19.96%
BuildingWingEstimatedIncurred
Sector P Cluster 16 Point 01 Wing BNARs 81.90 crRs 16.35 cr
-NARs 44.10 crRs 8.80 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associate
ArchitectPradeep Kamble
EngineerMEHUL KAIVANT SHAH
EngineerDadaso Gavali
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A & Associates
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700028205May 2030 → Nov 2030

Reason as filed by the promoterDue to management decisions and planning, there was a delay in launching the project even after obtaining the RERA number, which resulted in a late start of construction work. As of Now, at the time of extension request no allotees in this project.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602614Gopal Pukhraj GalothLODHA DEVELOPERS LIMITED04/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2030

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - OPULIS B - P51700079035.pdf23 Jun 2026
Withdrawal Update Form 1File: Form1 - OPULIS B - P51700079035.pdf20 Apr 2026
Withdrawal Update Form 2File: Opulis B Mar 2026 - Form 02 Signed.pdf20 Apr 2026
Withdrawal Update Form 3File: Opulis B Mar 2026 - Form 03 Signed.pdf20 Apr 2026
Withdrawal Update Form 1File: Form-1 Opulis B- Dec-25.pdf27 Jan 2026
Withdrawal Update Form 2File: Opulis B Form 02 Signed Dec 25.pdf27 Jan 2026
Withdrawal Update Form 3File: Opulis B Form 03 Signed Dec 25.pdf27 Jan 2026
Layout approvalFile: O - 08 Layout for Opulis B.pdf25 Nov 2025
Building plan approvalFile: O - 101.pdf25 Nov 2025
Building plan approvalFile: O - 102.pdf25 Nov 2025
Building plan approvalFile: O - 103.pdf25 Nov 2025
Building plan approvalFile: O - 104.pdf25 Nov 2025
Withdrawal Update Form 1File: OPULIS B.pdf13 Nov 2025
Withdrawal Update Form 2File: Form 02 - Opulis B - Sep 25 signed.pdf13 Nov 2025
Withdrawal Update Form 3File: Opulis B- Form-3.pdf13 Nov 2025
Form 5 (FY 2024-2025)File: Opulis B.pdf22 Oct 2025
Form 2A (FY 2024-2025)File: Premier ASPI B to OPULIS B - P51700079035 - Form 2A.pdf25 Jul 2025
Form 1File: Form-1 Premier -Opulis B P51700079035.pdf18 Jul 2025
Form 2File: Form 2 - Opulis B - June-25.pdf18 Jul 2025
Form 3File: Form 3 - Opulis B - June-25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold June 2025.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: Updated CC.pdf18 Jul 2025
OthersFile: Layout ASPI - Cluster 16 01 Wing B.pdf18 Jul 2025
Form 1File: Declaration -Form 1 (Olpuis B).pdf10 Jun 2025
Form 2File: Signed Form 2 Opulis B March 2025.pdf10 Jun 2025
Form 3File: Signed Form 3 Opulis B March 2025.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Signed Sold-Unsold_Opulis B March 2025.pdf10 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration.pdf10 Jun 2025
Declaration in FORM BFile: Form B.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Opulis B Form 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1094_001.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf16 Apr 2025
Copy of the legal title reportFile: Rera Legal Title Report_Kole_25-11-2024 Final.pdf25 Jan 2025
Other - LegalFile: Legal Declaration - ASPI B.pdf25 Jan 2025
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale Final .pdf25 Jan 2025
Details of encumbrances concerned to FinanceFile: Finance Encum -ASPI B.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Final B.pdf23 Jan 2025
Other - LegalFile: 1 Other - Legal (1).pdf23 Jan 2025
Other - LegalFile: Kole-845.pdf23 Jan 2025
Other - LegalFile: 2 Other - Legal (1).pdf23 Jan 2025
CERSAI detailsFile: CERSAI_Search_Report_200336582616_For_Asset_Based_Search_23_01_2025_09_24_36_619.pdf23 Jan 2025
Details of encumbrances concerned to LegalFile: Finance Encum -ASPI B.pdf23 Jan 2025
Other - FinanceFile: Finance Declaration -ASPI B.pdf23 Jan 2025
Building plan approvalFile: Sheet no 103 - converted.pdf20 Jan 2025
Building plan approvalFile: Sheet no 102 - converted_rotated.pdf20 Jan 2025
Building plan approvalFile: Sheet no101 - converted_rotated.pdf20 Jan 2025
Layout approvalFile: 20125 ASPI Sector 16 01 wing B.pdf20 Jan 2025
PAN CardFile: 1 PAN Card (8).pdf20 Jan 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf20 Jan 2025
Copy of Layout Approval (in case of layout)File: 20125 ASPI Sector 16 01 wing B.pdf20 Jan 2025
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf20 Jan 2025
Declaration in FORM BFile: Form B ASPI B - MDL.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -ASPI -B.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- ASPI- B.pdf20 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Palava 2_Amended CC_compressed Final.pdf20 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet no101 - converted_rotated.pdf20 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet no 102 - converted_rotated.pdf20 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheet no 103 - converted.pdf20 Jan 2025
Declaration about Commencement CertificateFile: CC Declaration.pdf20 Jan 2025
CERSAI detailsFile: Cersai Decla.pdf20 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf20 Jan 2025
Deviation Report with respect to Allotment letterFile: Allotment Devation - B.pdf20 Jan 2025
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf20 Jan 2025
Other - TechnicalFile: Order 50.pdf20 Jan 2025
Deviation Report with respect to model copy of AgreementFile: AFS Devaition B.pdf20 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (11).pdf20 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank Declaration.pdf20 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Secure Unsecure by promoter.pdf20 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
LODHA PARKP51900001339.2,210Jul 2017CompletedDec 2023Registered original: Dec 2021Feb 2022

How this compares with Thane

54%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 6 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OPULIS B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kole7,600+ in Thane

Builder: LODHA DEVELOPERS LIMITED

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if OPULIS B is delayed beyond 30 Nov 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OPULIS B?

The registered promoter entity is LODHA DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OPULIS B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against OPULIS B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for OPULIS B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OPULIS B?

The professionals named in the filing: Architect: Vilas Desai & Associate; Architect: Pradeep Kamble; Engineer: MEHUL KAIVANT SHAH; Engineer: Dadaso Gavali; Chartered Accountant: Chirag Sarvaiya & Co; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OPULIS B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OPULIS B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OPULIS B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.