Home / Browse projects / Mumbai Suburban, Maharashtra / One Meraki Wing C and Wing D
One Meraki Wing C and Wing D
RG-MH-58179 · RERA P51800050796 · Last updated on MahaRERA portal: 16 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
One Meraki Wing C and Wing D is a Residential / Group Housing project by Meraki Habitats LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050796 on 3 May 2023. Possession is promised by 31 Dec 2026. 47 of the 139 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete.
At a glance
Project
- NameOne Meraki Wing C and Wing D
- TypeResidential / Group Housing
- Location
- V N Purav marg
- Borla
- Chembur
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- RERA no.P51800050796
- ReraGenie IDRG-MH-58179
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 May 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed119 files
Current status
Figures as on 16 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing C | NA | 24 | 24 | 69 | 0 | 69 |
| Wing D | NA | 23 | 23 | 70 | 0 | 70 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 98%.
Wing C89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 98% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Wing D80%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 95% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 96% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed381
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing C | NA | Rs 97.03 cr | Rs 58.27 cr |
| Wing D | NA | Rs 97.03 cr | Rs 58.27 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aakar Architect and Consultants |
| Engineer | Ashish Rajput |
| Chartered Accountant | CA Neerav Y Shah |
| Partner | Role in project |
|---|---|
| Meraki Habitats LLP | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 193/248/2009 | Small Causes Court | SUIT IS DISMISSED |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed119
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: Form 3 Meraki C and D Wing_compressed.pdf | 16 May 2026 |
| Withdrawal Update Form 1File: form 1 c n d_organized.pdf | 26 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 C and D wing.pdf | 26 Mar 2026 |
| Withdrawal Update Form 3File: Form 3CA Certificate One Merarki C and D 31122025 (1).pdf | 26 Mar 2026 |
| Withdrawal Update Form 1File: Wing C and D Form 01.pdf | 29 Dec 2025 |
| Withdrawal Update Form 2File: Wing C and D Form 02.pdf | 29 Dec 2025 |
| Withdrawal Update Form 3File: form 3 c d sep 25_compressed.pdf | 29 Dec 2025 |
| Withdrawal Update Form 1File: rera june c n d 25 Form 1.pdf | 6 Nov 2025 |
| Withdrawal Update Form 1File: rera june c n d 25 Form 1.pdf | 6 Nov 2025 |
| Withdrawal Update Form 1File: rera june c n d 25 Form 1.pdf | 6 Nov 2025 |
| Withdrawal Update Form 1File: rera june c n d 25 Form 1.pdf | 6 Nov 2025 |
| Withdrawal Update Form 2File: rera form 2 and 2a C and D.pdf | 6 Nov 2025 |
| Withdrawal Update Form 2File: rera form 2 and 2a C and D.pdf | 6 Nov 2025 |
| Withdrawal Update Form 2File: rera form 2 and 2a C and D.pdf | 6 Nov 2025 |
| Withdrawal Update Form 2File: rera form 2 and 2a C and D-1-3.pdf | 6 Nov 2025 |
| Withdrawal Update Form 3File: form 3 Meraki C u0026 D Wing 30-06-25.pdf | 6 Nov 2025 |
| Withdrawal Update Form 3File: form 3 Meraki C u0026 D Wing 30-06-25.pdf | 6 Nov 2025 |
| Withdrawal Update Form 3File: form 3 Meraki C u0026 D Wing 30-06-25.pdf | 6 Nov 2025 |
| Withdrawal Update Form 3File: form 3 Meraki C u0026 D Wing 30-06-25.pdf | 6 Nov 2025 |
| Form 3File: form 3 scan copy.pdf | 27 Oct 2025 |
| Form 1File: Wing C & D 31032024 form 1.pdf | 27 Oct 2025 |
| Form 2File: Form 2.pdf | 27 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: c mar 24.pdf | 27 Oct 2025 |
| Form 1File: Wing C & D 30062024 form1.pdf | 27 Oct 2025 |
| Form 2File: FORM2 WING C& D SEP.pdf | 27 Oct 2025 |
| Form 3File: one meraki C and D (30-09-2024) (1).pdf | 27 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: c june 24.pdf | 27 Oct 2025 |
| Form 1File: Wing C & D 30092024 form 1.pdf | 27 Oct 2025 |
| Form 2File: FORM2 WING C& D SEP.pdf | 27 Oct 2025 |
| Form 3File: one meraki C and D (30-09-2024).pdf | 27 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: c sep 24_merged.pdf | 27 Oct 2025 |
| Form 1File: Wing C & D 31122024 Form 1.pdf | 27 Oct 2025 |
| Form 2File: rera form 2-1-3.pdf | 27 Oct 2025 |
| Form 3File: From 3 Dec 24.pdf | 27 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: c dec 24_merged.pdf | 27 Oct 2025 |
| Form 1File: Wing C & D 31032025 form 1.pdf | 27 Oct 2025 |
| Form 2File: form 2a c n d.pdf | 27 Oct 2025 |
| Form 3File: Form 3 Meraki C & D Wing.pdf | 27 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: D WING_merged.pdf | 27 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rera form 3 wind c d_compressed.pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: rera form 2.pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 28 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From 2A.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 scan copy.pdf | 28 May 2024 |
| Declaration about Commencement CertificateFile: Declaration - D wing.pdf | 14 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - One Meraki.pdf | 13 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31122023.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate - One Meraki - C D -30062023.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate - One Meraki - C D -30092023.pdf | 25 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2371031_COD_signed.pdf | 22 Apr 2023 |
| Other - TechnicalFile: Declaration about revised promoter name.pdf | 22 Apr 2023 |
| CERSAI detailsFile: Declaration for CERSAI.pdf | 24 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3.pdf | 24 Feb 2023 |
| Copy of the legal title reportFile: Title Report - 16022023-1-25_compressed.pdf | 16 Feb 2023 |
| Copy of the legal title reportFile: Title Report - 16022023-26-51_compressed.pdf | 16 Feb 2023 |
| Layout approvalFile: 1.pdf | 30 Jan 2023 |
| Layout approvalFile: 5.pdf | 30 Jan 2023 |
| Layout approvalFile: 6.pdf | 30 Jan 2023 |
| Layout approvalFile: 7.pdf | 30 Jan 2023 |
| Layout approvalFile: 8.pdf | 30 Jan 2023 |
| Layout approvalFile: 9.pdf | 30 Jan 2023 |
| Layout approvalFile: 10.pdf | 30 Jan 2023 |
| Layout approvalFile: 11.pdf | 30 Jan 2023 |
| Layout approvalFile: 18.pdf | 30 Jan 2023 |
| Layout approvalFile: 19.pdf | 30 Jan 2023 |
| Layout approvalFile: 20.pdf | 30 Jan 2023 |
| Layout approvalFile: 21.pdf | 30 Jan 2023 |
| Layout approvalFile: 23.pdf | 30 Jan 2023 |
| Layout approvalFile: 24.pdf | 30 Jan 2023 |
| Layout approvalFile: 25.pdf | 30 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Decalaration of finance - 24012023.pdf | 30 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Decalaration of Legal - 24012023.pdf | 30 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Decalaration of finance - 24012023.pdf | 30 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Decalaration of Legal - 24012023.pdf | 30 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 30 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: 5.pdf | 30 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: 6.pdf | 30 Jan 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SABARI SANGAM WING AP51800001271 | Chembur, Mumbai Suburban | Jul 2017 | Completed | Dec 2018 | Jul 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 119 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep One Meraki Wing C and Wing D on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borla6,700+ in Mumbai Suburban
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Meraki Habitats LLP
Meraki Habitats LLP has 5 registrations on MahaRERA, including MERAKI ARENA and SABARI SANGAM WING A. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if One Meraki Wing C and Wing D is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of One Meraki Wing C and Wing D?
The registered promoter entity is Meraki Habitats LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in One Meraki Wing C and Wing D?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for One Meraki Wing C and Wing D?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at One Meraki Wing C and Wing D?
The professionals named in the filing: Architect: Aakar Architect and Consultants; Engineer: Ashish Rajput; Chartered Accountant: CA Neerav Y Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in One Meraki Wing C and Wing D?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback