Home / Browse projects / Mumbai Suburban, Maharashtra / ONE MERAKI - Wing A & Wing B

Completed Litigation declared Residential / Group Housing project

ONE MERAKI - Wing A & Wing B

By Meraki Habitats LLP

RG-MH-26837 · RERA P51800011606 · Last updated on MahaRERA portal: 22 Apr 2024

Source: official MahaRERA filing

Red flags

  • Litigation declared, 7 cases
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 95%
0Complaints at MahaRERAon this registration
Jump to the 130 documents Report an error

ONE MERAKI - Wing A & Wing B is a Residential / Group Housing project by Meraki Habitats LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011606 on 31 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2025. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameONE MERAKI - Wing A & Wing B
  • TypeResidential / Group Housing
  • Location
    • CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011606
  • ReraGenie IDRG-MH-26837

Builder

  • NameMeraki Habitats LLP
  • Entity typePartnership
  • PartnersNEHA SAMIR SAVLA, KASTURI VASANJI MAMANIA
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed130 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ONE MERAKI WING A AND WING BNA2424000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 95%.

ONE MERAKI WING A AND WING B: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed233

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots233
Closed/Covered233

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,466 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
NIRMAL CHHADWAKurlaMumbai Suburban
LEENA NIRMAL CHHADWAKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI11700.0
Proposed, not sanctioned2,300 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANCHORAGE BLDG CENTRAL AVENUE ROAD CHEMBUR MUMBAI 400071

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Meraki Habitats LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800011924Dec 2023 → Dec 2025

Reason as filed by the promoterExtension to the project bearing Registration No. P51800011606. We, hereby apply for extension u/s 7(3) of the registered project bearing vide no P51800011606 As prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of 51% of the allottees is enclosed herewith.

Litigation declared7

CaseCourtStatus
512/955/2008SMALL CAUSES COURTSUIT IS DISMISSED
2086/2150/2008SMALL CAUSES COURTSUIT IS DISPOSED
1065/1800/2008SMALL CAUSES COURTSUIT DISPOSED OFF AS PER CONSENT TERMS
2085/2149/2008SMALL CAUSES COURTSUIT IS DISPOSED
510/953/2008SMALL CAUSES COURTSUIT IS DISMISSED
193/248/2009SMALL CAUSES COURTSUIT IS DISMISSED
519/963/2008SMALL CAUSES COURTSUIT DISPOSED OFF AS PER CONSENT TERMS

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Apr 2024

Documents filed130

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3 30062023 One Meraki AB.pdf25 Nov 2023
Certificates of CA (Form 3)File: Form 3 30092023 One Meraki A B.pdf25 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: T-1 AB -Diclosure of Sold_Booked Inventory - 231123.pdf25 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SEPT 2022_compressed.pdf20 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 DEC 2022_compressed.pdf20 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MARCH 2023_compressed.pdf20 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 JUNE 2023_compressed.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A MARCH 2023_compressed.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SEPT 2022_compressed.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A JUNE 2023_compressed.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A DEC 2022_compressed.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 21-22 promoter sign.pdf22 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 30062022.pdf30 Nov 2022
Certificates of CA (Form 3)File: Form 3 _compressed.pdf30 Nov 2022
Details of encumbrancesFile: Details of Encumbrances - SBI.pdf20 Sep 2022
Certificates of CA (Form 3)File: RERA - One Meraki - form 3 - 1.pdf24 Jun 2022
Certificates of CA (Form 3)File: RERA - One Meraki - form 3 - 2.pdf24 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA - One Meraki - form 2 - March 2022.pdf23 Jun 2022
Certificates of CA (Form 3)File: RERA - One Meraki Form 3 1.pdf23 Jun 2022
Certificates of CA (Form 3)File: RERA - One Meraki - form 3 2.pdf23 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-7.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-8.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-9.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-10.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-11.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-12.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-13.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-14.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-15.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-16.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-17.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-18.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-19.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-20.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-21.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-22.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-23.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-24.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-25.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-26_compressed.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-1.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-2.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-3.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-4.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-5.pdf21 Jun 2022
Layout approvalFile: One Meraki Sanction Plans-6.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-1.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-2.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-3.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-4.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-5.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-6.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-7.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-8.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-9.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-10.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-11.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-12.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-13.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-14.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-15.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-16.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-17.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-18.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-19.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-20.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-21.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-22.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-23.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-24.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-25.pdf21 Jun 2022
Copy of Layout Approval (in case of layout)File: One Meraki Sanction Plans-26_compressed.pdf21 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf26 May 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold - gardens - 30042022_compressed.pdf24 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - March 2020.pdf26 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - March 2021.pdf26 Mar 2022
Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory - Dec-21.pdf26 Mar 2022
Certificates of CA (Form 3)File: Form 3 - Dec 21.pdf26 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 - 17-18.pdf24 Mar 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
SABARI SANGAM WING AP51800001271Chembur, Mumbai SuburbanJul 2017CompletedDec 2018Jul 2018

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ONE MERAKI - Wing A & Wing B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

2 kmONE MERAKI - Wing A & WiCompleted 99Lapsed / revoked 62Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 260 registered projects within 2 km.

Builder: Meraki Habitats LLP

Meraki Habitats LLP has 5 registrations on MahaRERA, including MERAKI ARENA and SABARI SANGAM WING A. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ONE MERAKI - Wing A & Wing B is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ONE MERAKI - Wing A & Wing B?

The registered promoter entity is Meraki Habitats LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ONE MERAKI - Wing A & Wing B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ONE MERAKI - Wing A & Wing B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in ONE MERAKI - Wing A & Wing B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ONE MERAKI - Wing A & Wing B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ONE MERAKI - Wing A & Wing B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.