NYATI EXUBERANCE III

By NYATI BUILDERS PRIVATE LIMITED

RG-MH-71108 · RERA P52100034932 · Last updated on MahaRERA portal: 3 May 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
1 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 90%
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

NYATI EXUBERANCE III is a Others project by NYATI BUILDERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100034932 on 28 Apr 2022. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameNYATI EXUBERANCE III
  • TypeOthers
  • Location
    • MOHAMMADWADI
    • UNDRI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034932
  • ReraGenie IDRG-MH-71108

Builder

  • NameNYATI BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45202MH1996PTC102620
  • GSTIN27AAACN6418N1Z4
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorsNITIN DWARKADAS NYATI, NITIN DWARKADAS NYATI
  • Other registrations20 more →
  • Completed9 of 21
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects18 →

Key dates

this monthRegisteredApr 2022First promiseJun 2024Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Apr 2022
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2024)
  • Buildings2 building records
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D BLDG MHADA WITH SHOPSNA100000
COMMERCIALNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 90%.

D BLDG MHADA WITH SHOPS40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises41%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks84%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.58%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.77%
COMMERCIAL36%
ActivityProgress
Excavation90%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor0%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises31%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered1
Open Space24
BuildingClosed/CoveredOpen SpaceTotal
D BLDG MHADA WITH SHOPS11213
COMMERCIAL01212

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area831 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3738.87
Proposed, not sanctioned3,739 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch9/2 Kalpataru Gardens, Boat Club Road, Pune - 411001

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
NYATI BUILDERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019808Jun 2024 → Jun 2025

Reason as filed by the promoter.

Litigation declared1

CaseCourtStatus
1653/2013Civil Judge Senior Division PuneUNREADY

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Mar 2025

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Proforma of Allotment letterFile: Exuberance III AGREE MHADA UNITS.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nyati Exuberance III Form 3.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf3 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf3 Jan 2025
Details of encumbrances concerned to FinanceFile: Exuberance Finance Declarartion.pdf25 Nov 2024
Details of encumbrances concerned to LegalFile: Exuberance Finance Declarartion.pdf25 Nov 2024
CERSAI detailsFile: CERSAI Report Exuberance 22082024.pdf23 Nov 2024
Proforma of Agreement for saleFile: Exuberance III UNIT AGREE SHOP 12082024 CLEAN.pdf5 Nov 2024
Proforma of Agreement for saleFile: Exuberance III UNIT AGREE MHADA UNITS revised 120824 CLEAN.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Exuberance III - Form 5.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.PDF17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 CA_Certificate Nyati_Exuberance_III.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Nyati Exuberance III .pdf30 May 2024
Proforma of Agreement for saleFile: Exuberance III UNIT AGREE REVISED 290524.pdf29 May 2024
Proforma of Agreement for saleFile: Exuberance III UNIT AGREE MHADA UNITS 290524.pdf29 May 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf21 May 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf21 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: NDN - Disclosure.pdf21 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: PNN - Disclosure.pdf21 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account Details.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf18 May 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 - CA Certificate - Nyati Exuberance III_11zon.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Jan 2024
Details of encumbrancesFile: Undertaking Exuberance III.pdf14 Dec 2023
CERSAI detailsFile: CERSAI REPORT EXUBERANCE.pdf5 Dec 2023
Proforma of Agreement for saleFile: Exuberance III UNIT AGREE 080422 REVISED 07112023 CLEAN.pdf9 Nov 2023
Declaration about Commencement CertificateFile: Form D III.pdf4 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nyati Exuberance III.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf4 Apr 2023
Layout approvalFile: Sanction Layout BP.pdf31 Jan 2023
Copy of Layout Approval (in case of layout)File: Sanction Layout BP.pdf31 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf31 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf25 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf28 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf30 Jul 2022
Copy of the legal title reportFile: Title dt 13042022.pdf20 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 Apr 2022
CERSAI detailsFile: CERSAI details.pdf13 Apr 2022
Building plan approvalFile: Commercial Bldg.pdf8 Apr 2022
Building plan approvalFile: D Bldg Mhada with Shop.pdf8 Apr 2022
Building plan approvalFile: Parking Layout.pdf8 Apr 2022
Layout approvalFile: Sanction Layout BP.pdf8 Apr 2022
Layout approvalFile: Sanction Layout DP.pdf8 Apr 2022
Building plan approvalFile: Section Elevation.pdf8 Apr 2022
PAN CardFile: PAN - NBPL.pdf8 Apr 2022
Details of encumbrancesFile: Details of encumbrances.pdf8 Apr 2022
Copy of Layout Approval (in case of layout)File: Sanction Layout BP.pdf8 Apr 2022
Copy of Layout Approval (in case of layout)File: Sanction Layout DP.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Commercial Bldg.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: D Bldg Mhada with Shop.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Parking Layout.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Section Elevation.pdf8 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate BP.pdf8 Apr 2022

Promoter's earlier projects18

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

14 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Nyati Enchante IIIVadgaonsheri Pune50CompletedMar 2021Mar 2021
Nyati Enchante IIVadgaonsheri Pune65CompletedMar 2021Mar 2021
Nyati Evara IIUndri Pune96CompletedSep 2020Sep 2020
Nyati Enchante IVadgaonsheri Pune50CompletedSep 2020Sep 2020
Nyati Evara IUndri Pune240CompletedJun 2019Jun 2019
Nyati Meadows - B8, B9vadgaonsheri Pune76CompletedJul 2017Apr 2017
Nyati EvitaLohegaon Pune240CompletedJul 2017Oct 2016
Nyati EurekaKharadi Pune38CompletedJul 2017Apr 2017
Nyati EmporiusBaner Pune98CompletedJul 2017Mar 2017
Nyati WindchimesUndri Pune200CompletedMar 2017Jun 2016
Nyati Equatorial-IIBavdhan Bk Pune312CompletedMar 2017Late, Apr 2017
Nyati Unitree ICTS No 1995 1996B Pune nagar Road Yerwada Pune142CompletedDec 2016Oct 2015
Nyati EpitomeMohammedwadi Pune112CompletedDec 2016Oct 2016
Nyati EbonyUndri Pune188CompletedMar 2016Dec 2015
Nyati Equatorial-IBavdhan bk pune264CompletedDec 2015Late, Jul 2016
Nyati Ethos-IIUndri Pune152CompletedSep 2015Mar 2015
Nyati Ethos-IUndri Pune165CompletedDec 2014Late, Aug 2015
Nyati EsplanadeBavdhan Bk Pune253CompletedJan 2013Late, Jan 2014

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NYATI EXUBERANCE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOHAMMADWADI13,700+ in Pune

2 kmNYATI EXUBERANCE IIICompleted 79Lapsed / revoked 31Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 178 registered projects within 2 km.

Builder: NYATI BUILDERS PRIVATE LIMITED

NYATI BUILDERS PRIVATE LIMITED has 21 registrations on MahaRERA, including NYATI EVARA I and NYATI UNITREE II. Its filings disclose 18 earlier MahaRERA projects: declares 14 of 18 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NYATI EXUBERANCE III is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI EXUBERANCE III?

The registered promoter entity is NYATI BUILDERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202MH1996PTC102620 and GSTIN 27AAACN6418N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI EXUBERANCE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NYATI EXUBERANCE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in NYATI EXUBERANCE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI EXUBERANCE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI EXUBERANCE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.