Home / Browse projects / Pune, Maharashtra / NYATI EVARA I

Completed No litigation declared Residential / Group Housing project

NYATI EVARA I

By NYATI BUILDERS PRIVATE LIMITED

RG-MH-09455 · RERA P52100000455 · Last updated on MahaRERA portal: 24 Dec 2019

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2019Possession promisedregistration recorded completed
35 of 55Construction stages doneacross 5 buildings; furthest along: External plumbing and external plaster, 95%
2Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

NYATI EVARA I is a Residential / Group Housing project by NYATI BUILDERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100000455 on 18 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2019. 2 complaints are on record with the regulator.

At a glance

Project

  • NameNYATI EVARA I
  • TypeResidential / Group Housing
  • Location
    • UNDRI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000455
  • ReraGenie IDRG-MH-09455

Builder

  • NameNYATI BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45202MH1996PTC102620
  • GSTIN27AAACN6418N1Z4
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorsNITIN DWARKADAS NYATI, NITIN DWARKADAS NYATI
  • Other registrations20 more →
  • Completed9 of 21
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects18 →

Key dates

this monthRegisteredJul 2017PromisedJun 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jul 2017
  • Promised completion30 Jun 2019
  • Revised completionNone
  • Buildings5 building records
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA140000
A2NA140000
B1NA140000
B2NA140000
B3NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 24 Dec 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

35 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

A189%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
A289%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B189%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B289%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B390%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities19

As on 24 Dec 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes80%
Street LightingYes25%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes90%
Covered ParkingsYes80%
Gas Bank and NetworkingYes90%
Multipurpose courtYes90%
Swimming PoolYes90%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered70
BuildingClosed/CoveredTotal
A11616
A21616
B11414
B21212
B31212

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,988 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
AVALON GROUP PRIVATE LIMITEDPune (M Corp.)Pune

Approvals and building plan

Permissible FSI17048.67
Proposed, not sanctioned17,049 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBOAT CLUB ROAD, PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShirish Dasnurkar & Associates
ArchitectSanjeev Mukund Mehta
EngineerJW Consultant LLP
PartnerRole in project
NYATI BUILDERS PRIVATE LIMITED-

Litigation declared2

CaseCourtStatus
980/2015Civil Judge Senior Division Puneframing of issues and steps
519/2019Civil Judge Senior Division PuneUNREADY

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12503535Avalon Group Private Limited through Mr. Arjun IndulkarMr Sachin Suresh Rathod (Allottee)04/10/2025
CC12503536Avalon Group Private Limited through Mr. Arjun IndulkarMr Atul Dutta (Allottee)04/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Dec 2019

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Proforma of Allotment letterFile: EVARA I REVISED UNIT AGMT OWNERS PRE REVISED.pdf24 Dec 2019
Proforma of Allotment letterFile: EVARA I REVISED UNIT AGREE DEVELOPERS PRE REVISED.pdf24 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part 1 A1 A2 B1 B2 B3.pdf10 Dec 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Nyati Evara I Society Registration certificate.PDF9 Aug 2019
Certificates of Architect (Form 4)File: Form-4 Architect Certificate-Evara-I.pdf29 Jan 2019
Certificates of Architect (Form 4)File: Form 4 - Architect Certificate Nyati Evara -I.pdf29 Jan 2019
Proforma of Allotment letterFile: EVARA I REVISED UNIT AGREE DEVELOPERS PRE(071218).pdf10 Dec 2018
Certificates of CA (Form 5)File: Nyati Evara I.pdf6 Dec 2018
Proforma of Allotment letterFile: NYATI EVARA I -REVISED UNIT AGREEMENT 170818.pdf20 Aug 2018
Layout approvalFile: SANCTION LAYOUT.pdf4 Aug 2018
Copy of Layout Approval (in case of layout)File: SANCTION LAYOUT.pdf4 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf4 Aug 2018
Layout approvalFile: New Layout compressed.pdf1 Nov 2017
Copy of Layout Approval (in case of layout)File: New Layout compressed.pdf1 Nov 2017
Proforma of Allotment letterFile: NYATI EVARA I - REVISED ALLOTMENT LETTER AND UNIT AGREEMENT.pdf13 Sep 2017
Layout approvalFile: Nyati Evara-hatch on sanction layout.pdf17 Jul 2017
Layout approvalFile: Nyati Evara-hatch on submission layout.pdf17 Jul 2017
Building plan approvalFile: Nyati Evara-hatch on sanction layout.pdf17 Jul 2017
Copy of Layout Approval (in case of layout)File: Nyati Evara-hatch on sanction layout.pdf17 Jul 2017
Copy of Layout Approval (in case of layout)File: Nyati Evara-hatch on submission layout.pdf17 Jul 2017
Building Plan Approval (IOD)File: Nyati Evara-hatch on sanction layout.pdf17 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nyati Evara-I-Arch Certificate.pdf17 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Evara - Engg Cert.pdf17 Jul 2017
Proforma of Allotment letterFile: NYATI EVARA I - DRAFT ALLOTMENT LETTER UNIT AGREEMENT - UPLOADED.pdf17 Jul 2017
PAN CardFile: NBPL - PAN.pdf16 Jul 2017
Copy of the legal title reportFile: Title Certificate Nyati Evara.pdf16 Jul 2017
Details of encumbrancesFile: Evara-PLAINT in SCS 980 of 2015 and WS of Defendant No 14.pdf16 Jul 2017
Declaration in FORM BFile: FORM `B` NBPL - Evara - I.pdf16 Jul 2017
Certificates of CA (Form 3)File: Form-3 Evara.pdf16 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: N Evara PMRDA Revised Commencement Cert.pdf15 Jul 2017

Promoter's earlier projects18

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

14 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Nyati Enchante IIIVadgaonsheri Pune50CompletedMar 2021Mar 2021
Nyati Enchante IIVadgaonsheri Pune65CompletedMar 2021Mar 2021
Nyati Evara IIUndri Pune96CompletedSep 2020Sep 2020
Nyati Enchante IVadgaonsheri Pune50CompletedSep 2020Sep 2020
Nyati Evara IUndri Pune240CompletedJun 2019Jun 2019
Nyati Meadows - B8, B9vadgaonsheri Pune76CompletedJul 2017Apr 2017
Nyati EvitaLohegaon Pune240CompletedJul 2017Oct 2016
Nyati EurekaKharadi Pune38CompletedJul 2017Apr 2017
Nyati EmporiusBaner Pune98CompletedJul 2017Mar 2017
Nyati WindchimesUndri Pune200CompletedMar 2017Jun 2016
Nyati Equatorial-IIBavdhan Bk Pune312CompletedMar 2017Late, Apr 2017
Nyati Unitree ICTS No 1995 1996B Pune nagar Road Yerwada Pune142CompletedDec 2016Oct 2015
Nyati EpitomeMohammedwadi Pune112CompletedDec 2016Oct 2016
Nyati EbonyUndri Pune188CompletedMar 2016Dec 2015
Nyati Equatorial-IBavdhan bk pune264CompletedDec 2015Late, Jul 2016
Nyati Ethos-IIUndri Pune152CompletedSep 2015Mar 2015
Nyati Ethos-IUndri Pune165CompletedDec 2014Late, Aug 2015
Nyati EsplanadeBavdhan Bk Pune253CompletedJan 2013Late, Jan 2014

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NYATI EVARA I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UNDRI13,700+ in Pune

2 kmNYATI EVARA ICompleted 4Lapsed / revoked 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: NYATI BUILDERS PRIVATE LIMITED

NYATI BUILDERS PRIVATE LIMITED has 21 registrations on MahaRERA, including NYATI EVARA I and NYATI UNITREE II. Its filings disclose 18 earlier MahaRERA projects: declares 14 of 18 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NYATI EVARA I is delayed beyond 30 Jun 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI EVARA I?

The registered promoter entity is NYATI BUILDERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202MH1996PTC102620 and GSTIN 27AAACN6418N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI EVARA I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NYATI EVARA I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NYATI EVARA I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NYATI EVARA I?

The professionals named in the filing: Architect: Shirish Dasnurkar & Associates; Architect: Sanjeev Mukund Mehta; Engineer: JW Consultant LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NYATI EVARA I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI EVARA I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI EVARA I to a free account