Home / Browse projects / Pune, Maharashtra / NYATI ELAN SOUTH II
NYATI ELAN SOUTH II
RG-MH-79599 · RERA P52100045336 · Last updated on MahaRERA portal: 24 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 7 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NYATI ELAN SOUTH II is a Residential / Group Housing project by PSQUARE BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100045336 on 12 May 2022. Possession was promised by 31 Dec 2024 and is now 22 months past that date.
At a glance
Project
- NameNYATI ELAN SOUTH II
- TypeResidential / Group Housing
- Location
- NEAR JSPM COLLEGE
- WAGHOLI
- Haveli
- Pune
- 412207
- Pincode412207
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045336
- ReraGenie IDRG-MH-79599
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on12 May 2022
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings4 building records
- Documents filed79 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| G1 | NA | 13 | 0 | 0 | 0 | 0 |
| G2 | NA | 13 | 0 | 0 | 0 | 0 |
| G3 | NA | 13 | 0 | 0 | 0 | 0 |
| G4 | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 24 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
36 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
G182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
G282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
G382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
G482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 85% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 85% |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | Yes | 75% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 85% |
| Solid Waste Management And Disposal | Yes | 85% |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 70% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 75% |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| G1 | 15 | 15 |
| G2 | 1 | 1 |
| G3 | 1 | 1 |
| G4 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vikas Achalkar |
| Engineer | JW Consultants LLP |
| Engineer | Vishwanath Dhande |
| Chartered Accountant | Milani & Gattani Co. |
| Partner | Role in project |
|---|---|
| PSQUARE BUILDERS LLP | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1360/2018 | Civil Judge Senior Division Pune | UNREADY |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Feb 2025
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 24 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 19 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 10 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 8 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nyati Elan South II Form 3.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 8 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 2 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 3 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: L AND F ENCUMBRANCES SOUTH II.pdf | 19 Dec 2024 |
| Details of encumbrancesFile: L AND F ENCUMBRANCES SOUTH II.pdf | 19 Dec 2024 |
| Declaration in FORM BFile: FORM B SOUTH II.pdf | 19 Dec 2024 |
| Details of encumbrances concerned to LegalFile: L AND F ENCUMBRANCES SOUTH II.pdf | 19 Dec 2024 |
| Proforma of Agreement for saleFile: SOUTH II UNIT AGREEMENT.pdf | 19 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSER PNN SOUTH II.pdf | 19 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 19 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Elan South II - Form 5.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.PDF | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 12 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 12 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 12 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 18 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 6 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - P-Square Elan South II.pdf | 6 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 3 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nyati Elan South II.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE ELAN SOUTH II.pdf | 28 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elan South II.pdf | 27 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: South II.pdf | 29 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE ELAN SOUTH II March 2023.pdf | 17 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf | 4 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE ELAN SOUTH II Dec 2022.pdf | 30 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE N ELAN SOUTH II 2022.pdf | 30 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 25 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 21 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 25 Jul 2022 |
| Proforma of Allotment letterFile: ELAN SOUTH II Unit Agreement 27052022.pdf | 2 Jun 2022 |
| Details of encumbrancesFile: Details of Encumbrances.pdf | 3 May 2022 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 3 May 2022 |
| Declaration in FORM BFile: Form B Psquare.pdf | 3 May 2022 |
| CERSAI detailsFile: CERSAI details Undertaking.pdf | 3 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 2 May 2022 |
| Proforma of Allotment letterFile: ELAN SOUTH II UNIT AGR 02052022.pdf | 2 May 2022 |
| PAN CardFile: P-SQUARE BUILDERS LLP - PAN.pdf | 30 Apr 2022 |
| Copy of the legal title reportFile: Revised Title Certificate 24032021.pdf | 30 Apr 2022 |
| Layout approvalFile: Sanction Layout Phase Marking.pdf | 29 Apr 2022 |
| Building plan approvalFile: G1 G3 Ele Section.pdf | 29 Apr 2022 |
| Building plan approvalFile: G1 G3 Odd Even Floor.pdf | 29 Apr 2022 |
| Building plan approvalFile: G1 G3 Refuge Floor.pdf | 29 Apr 2022 |
| Building plan approvalFile: G2 G4 Ele Section.pdf | 29 Apr 2022 |
| Building plan approvalFile: G2 G4 Odd Even Floor.pdf | 29 Apr 2022 |
| Building plan approvalFile: G2 G4 Refuge Floor.pdf | 29 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: Sanction Layout Phase Marking.pdf | 29 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: G1 G3 Ele Section.pdf | 29 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: G1 G3 Odd Even Floor.pdf | 29 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: G1 G3 Refuge Floor.pdf | 29 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: G2 G4 Ele Section.pdf | 29 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: G2 G4 Odd Even Floor.pdf | 29 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: G2 G4 Refuge Floor.pdf | 29 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 29 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 29 Apr 2022 |
| CERSAI detailsFile: CERSAI Search Report South II.pdf | 29 Apr 2022 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| NYATI ELAN CENTRAL IP52100029005 | WAGHOLI, Pune | - | Apr 2021 | Certificate Signed | Apr 2024 | Mar 2024 |
| Nyati Elan South East I | Wagholi pune | 144 | - | Completed | Sep 2021 | Sep 2020 |
| Nyati Elan West II | Wagholi Pune | 96 | - | Completed | Sep 2019 | Sep 2019 |
| Nyati Elan Commercial | Wagholi Pune | 84 | - | Completed | Jan 2019 | Jan 2019 |
| Nyati Elan West I | Wagholi Pune | 240 | - | Completed | Jun 2018 | Feb 2018 |
| Nyati Elan- South-East | wagholi Pune | 288 | - | Completed | Jun 2017 | Oct 2016 |
| Nyati Elan- North | Wagholi Pune | 311 | - | Completed | Jun 2017 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep NYATI ELAN SOUTH II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WAGHOLI13,700+ in Pune
Filed coordinates, straight-line distance. 97 registered projects within 2 km.
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: PSQUARE BUILDERS LLP
PSQUARE BUILDERS LLP has 10 registrations on MahaRERA, including NYATI ELAN WEST I and NYATI ELAN COMMERCIAL. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that NYATI ELAN SOUTH II shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if NYATI ELAN SOUTH II is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NYATI ELAN SOUTH II?
The registered promoter entity is PSQUARE BUILDERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NYATI ELAN SOUTH II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NYATI ELAN SOUTH II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NYATI ELAN SOUTH II?
The professionals named in the filing: Architect: Vikas Achalkar; Engineer: JW Consultants LLP; Engineer: Vishwanath Dhande; Chartered Accountant: Milani & Gattani Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NYATI ELAN SOUTH II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback