Home / Browse projects / Pune, Maharashtra / NYATI ELAN CENTRAL I

Completed No litigation declared Residential / Group Housing project

NYATI ELAN CENTRAL I

By PSQUARE BUILDERS LLP

RG-MH-17357 · RERA P52100029005 · Last updated on MahaRERA portal: 19 Apr 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 6 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2024Possession promisedregistration recorded completed
19 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

NYATI ELAN CENTRAL I is a Residential / Group Housing project by PSQUARE BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100029005 on 23 Apr 2021. The registration is recorded completed; possession was promised by 30 Apr 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNYATI ELAN CENTRAL I
  • TypeResidential / Group Housing
  • Location
    • NEAR JASPM COLLEGE
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029005
  • ReraGenie IDRG-MH-17357

Builder

  • NamePSQUARE BUILDERS LLP
  • Entity typePartnership
  • PartnerNITIN DWARKADAS NYATI
  • Other registrations9 more →
  • Completed8 of 10
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredApr 2021PromisedApr 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Apr 2021
  • Promised completion30 Apr 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A3NA140000
B6NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes88%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes85%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes85%
Main Gate Security CabinYes50%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28
BuildingClosed/CoveredTotal
A31616
B61212

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,344 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
M/S RADHESHWARINAGAR PROMOTERS AND DEVELOPERSPune (CB)Pune

Approvals and building plan

Permissible FSI6729.91
Proposed, not sanctioned6,730 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHARADI PUNE 14

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
PSQUARE BUILDERS LLP-

Litigation declared1

CaseCourtStatus
1360/2018Civil Judge Senior Division PuneUNREADY

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501549Abhishek SahuPSQUARE BUILDERS LLP11/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Apr 2024

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nyati Elan Central I Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Elan Central I - Form 5.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.PDF17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf18 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate .pdf15 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P-Square Form 3 -Elan Central I_11zon.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nyati Elan Central I.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NYATI ELAN CENTRAL I.pdf28 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Central I.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NYATI ELAN CENTRAL I March 2023.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf4 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 NYATI ELAN CENTRAL I.pdf30 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2A Engineer Certificate.pdf30 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf25 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf21 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf21 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Nyati Elan Central I.pdf30 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf25 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf25 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf25 Apr 2022
Layout approvalFile: Layout.pdf14 Jan 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf14 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf14 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf6 Jan 2022
Proforma of Allotment letterFile: ELAN CENTRAL I UNIT AGR 14122021 REVISED CLEAN 050122.pdf5 Jan 2022
Proforma of Allotment letterFile: ELAN CENTRAL I UNIT AGR REVISED 030621 FINAL 14122021.pdf15 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf11 Oct 2021
OtherFile: Declaration.pdf15 Apr 2021
Copy of the legal title reportFile: Title Certificate.pdf14 Apr 2021
Details of encumbrancesFile: Encumberance.pdf14 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Certificate.pdf9 Apr 2021
Copy of the legal title reportFile: Title Certificate New Format.pdf24 Mar 2021
Details of encumbrancesFile: Encumbrance Details Central I.pdf24 Mar 2021
Proforma of Allotment letterFile: ELAN CENTRAL I UNIT AGR FINAL 11032021.pdf11 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf10 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf10 Mar 2021
PAN CardFile: P-SQUARE BUILDERS LLP - PAN.pdf9 Mar 2021
Details of encumbrancesFile: Plaint and WS.pdf9 Mar 2021
Declaration in FORM BFile: Form B Central I.pdf9 Mar 2021
Layout approvalFile: 3 Layout.pdf6 Mar 2021
Layout approvalFile: 4 Layout.pdf6 Mar 2021
Layout approvalFile: Phasewise Marking Central I.pdf6 Mar 2021
Building plan approvalFile: A3 8th Floor Terrace Floor.pdf6 Mar 2021
Building plan approvalFile: A3 Elavation Saction.pdf6 Mar 2021
Building plan approvalFile: A3 P 12 Floor Plan.pdf6 Mar 2021
Building plan approvalFile: B6 8 th Floor Terrace Floor.pdf6 Mar 2021
Building plan approvalFile: B6 Elevation Section.pdf6 Mar 2021
Building plan approvalFile: B6 P 12 Floor.pdf6 Mar 2021
Copy of Layout Approval (in case of layout)File: 3 Layout.pdf6 Mar 2021
Copy of Layout Approval (in case of layout)File: 4 Layout.pdf6 Mar 2021
Copy of Layout Approval (in case of layout)File: Phasewise Marking Central I.pdf6 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: A3 8th Floor Terrace Floor.pdf6 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: A3 Elavation Saction.pdf6 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: A3 P 12 Floor Plan.pdf6 Mar 2021

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Nyati Elan South East IWagholi pune144CompletedSep 2021Sep 2020
Nyati Elan West IIWagholi Pune96CompletedSep 2019Sep 2019
Nyati Elan CommercialWagholi Pune84CompletedJan 2019Jan 2019
Nyati Elan West IWagholi Pune240CompletedJun 2018Feb 2018
Nyati Elan- South-Eastwagholi Pune288CompletedJun 2017Oct 2016
Nyati Elan- NorthWagholi Pune311CompletedJun 2017Oct 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NYATI ELAN CENTRAL I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

2 kmNYATI ELAN CENTRAL ICompleted 115Lapsed / revoked 117Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: PSQUARE BUILDERS LLP

PSQUARE BUILDERS LLP has 10 registrations on MahaRERA, including NYATI ELAN WEST I and NYATI ELAN COMMERCIAL. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NYATI ELAN CENTRAL I is delayed beyond 30 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI ELAN CENTRAL I?

The registered promoter entity is PSQUARE BUILDERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI ELAN CENTRAL I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NYATI ELAN CENTRAL I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NYATI ELAN CENTRAL I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in NYATI ELAN CENTRAL I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI ELAN CENTRAL I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI ELAN CENTRAL I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.