Home / Browse projects / Pune, Maharashtra / NYATI DEFENCE ENCLAVE I
NYATI DEFENCE ENCLAVE I
By NYATI BUILDERS PRIVATE LIMITED
RG-MH-97442 · RERA P52100048915 · Last updated on MahaRERA portal: 16 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NYATI DEFENCE ENCLAVE I is a Residential / Group Housing project by NYATI BUILDERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100048915 on 24 Jan 2023. Possession was promised by 31 Dec 2024 and is now 22 months past that date.
At a glance
Project
- NameNYATI DEFENCE ENCLAVE I
- TypeResidential / Group Housing
- Location
- NYATI WINDCHIMES ROAD
- NEAR NYATI WINDCHIMES
- MOHAMMADWADI
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100048915
- ReraGenie IDRG-MH-97442
Builder
- NameNYATI BUILDERS PRIVATE LIMITED
- Entity typeCompany
- CINU45202MH1996PTC102620
- GSTIN27AAACN6418N1Z4
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorsNITIN DWARKADAS NYATI, NITIN DWARKADAS NYATI
- Other registrations20 more →
- Completed9 of 21
- No longer live6 lapsed, de-registered or revoked
- Declared earlier projects18 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Jan 2023
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings2 building records
- Documents filed110 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C WING | NA | 8 | 0 | 0 | 0 | 0 |
| D WING | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 96%.
C WING73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 94% |
| Sanitary Fittings within the flats / premises | 81% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 89% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 43% |
D WING73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 93% |
| Sanitary Fittings within the flats / premises | 81% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 88% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 43% |
Progress on shared amenities15
As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 24% |
| Water Supply | Yes | 27% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 21% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 12% |
| Street Lighting | Yes | 35% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 35% |
| Energy managemcnt | Yes | 90% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 22% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed56
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| C WING | 22 | 6 | 28 |
| D WING | 22 | 6 | 28 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | KETAN JAYKAR |
| Engineer | AMOD DIXIT |
| Chartered Accountant | Milani Gattani & Co. |
| Chartered Accountant | Milani & Associates |
| Chartered Accountant | Vipin Gujrathi |
| Partner | Role in project |
|---|---|
| NYATI BUILDERS PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Jan 2025
Documents filed110
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Nyati Defence Enclave I - Form 5.pdf | 16 Jun 2026 |
| Form 5 (FY 2023-2024)File: Nyati Defence Enclave I - Form 5.pdf | 16 Jun 2026 |
| Form 1File: FORM 1.pdf | 15 Jun 2026 |
| Form 2File: FORM 2.pdf | 15 Jun 2026 |
| Form 3File: FORM 3.pdf | 15 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 15 Jun 2026 |
| Form 1File: FORM 1.pdf | 15 Jun 2026 |
| Form 2File: FORM 2.pdf | 15 Jun 2026 |
| Form 3File: FORM 3.pdf | 15 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 15 Jun 2026 |
| Form 1File: FORM 1.pdf | 15 Jun 2026 |
| Form 2File: FORM 2.pdf | 15 Jun 2026 |
| Form 3File: FORM 3.pdf | 15 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 15 Jun 2026 |
| Form 1File: FORM 1.pdf | 15 Jun 2026 |
| Form 2File: FORM 2.pdf | 15 Jun 2026 |
| Form 3File: FORM 3.pdf | 15 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 15 Jun 2026 |
| Form 1File: FORM 1.pdf | 15 Jun 2026 |
| Form 2File: FORM 2.pdf | 15 Jun 2026 |
| Form 3File: FORM 3.pdf | 15 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 15 Jun 2026 |
| Form 1File: FORM 1.pdf | 15 Jun 2026 |
| Form 2File: FORM 2.pdf | 15 Jun 2026 |
| Form 3File: FORM 3.pdf | 15 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 15 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 15 Jun 2026 |
| Form 2A (FY 2023-2024)File: Form 2A.pdf | 15 Jun 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 11 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 8 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 2 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 2 Apr 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 16 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Completion Nyati Defence Enclave I Wing C Wing D.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 3 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 3 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: L AND F ENCUMBRANCES NDE I.pdf | 19 Dec 2024 |
| Declaration in FORM BFile: FORM B NDE I.pdf | 19 Dec 2024 |
| Details of encumbrances concerned to LegalFile: L AND F ENCUMBRANCES NDE I.pdf | 19 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSER PNN NDE I.pdf | 19 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Defence Enclave I - Form 5.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Defence Enclave I - Form 5.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 9 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A .pdf | 18 May 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 11 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 6 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 6 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - NBPL Defence Enclave I.pdf | 6 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 16 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1.pdf | 28 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1.pdf | 28 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 FORM 2.pdf | 28 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2.pdf | 28 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 28 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: 9 INVENTORY.pdf | 28 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: 10 INVENTORY.pdf | 28 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: 10 INVENTORY.pdf | 28 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 FORM 3.pdf | 28 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 FORM 3.pdf | 28 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 8 FORM 5.pdf | 28 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Defence Enclave I Architect Certificate.pdf | 22 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nyati Defence Enclave I Engineer Certificate.pdf | 22 Sep 2023 |
Promoter's earlier projects18
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Nyati Enchante III | Vadgaonsheri Pune | 50 | Completed | Mar 2021 | Mar 2021 |
| Nyati Enchante II | Vadgaonsheri Pune | 65 | Completed | Mar 2021 | Mar 2021 |
| Nyati Evara II | Undri Pune | 96 | Completed | Sep 2020 | Sep 2020 |
| Nyati Enchante I | Vadgaonsheri Pune | 50 | Completed | Sep 2020 | Sep 2020 |
| Nyati Evara I | Undri Pune | 240 | Completed | Jun 2019 | Jun 2019 |
| Nyati Meadows - B8, B9 | vadgaonsheri Pune | 76 | Completed | Jul 2017 | Apr 2017 |
| Nyati Evita | Lohegaon Pune | 240 | Completed | Jul 2017 | Oct 2016 |
| Nyati Eureka | Kharadi Pune | 38 | Completed | Jul 2017 | Apr 2017 |
| Nyati Emporius | Baner Pune | 98 | Completed | Jul 2017 | Mar 2017 |
| Nyati Windchimes | Undri Pune | 200 | Completed | Mar 2017 | Jun 2016 |
| Nyati Equatorial-II | Bavdhan Bk Pune | 312 | Completed | Mar 2017 | Late, Apr 2017 |
| Nyati Unitree I | CTS No 1995 1996B Pune nagar Road Yerwada Pune | 142 | Completed | Dec 2016 | Oct 2015 |
| Nyati Epitome | Mohammedwadi Pune | 112 | Completed | Dec 2016 | Oct 2016 |
| Nyati Ebony | Undri Pune | 188 | Completed | Mar 2016 | Dec 2015 |
| Nyati Equatorial-I | Bavdhan bk pune | 264 | Completed | Dec 2015 | Late, Jul 2016 |
| Nyati Ethos-II | Undri Pune | 152 | Completed | Sep 2015 | Mar 2015 |
| Nyati Ethos-I | Undri Pune | 165 | Completed | Dec 2014 | Late, Aug 2015 |
| Nyati Esplanade | Bavdhan Bk Pune | 253 | Completed | Jan 2013 | Late, Jan 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 20 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 110 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NYATI DEFENCE ENCLAVE I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR NYATI WINDCHIMES13,700+ in Pune
Filed coordinates, straight-line distance. 179 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: NYATI BUILDERS PRIVATE LIMITED
NYATI BUILDERS PRIVATE LIMITED has 21 registrations on MahaRERA, including NYATI EVARA I and NYATI UNITREE II. Its filings disclose 18 earlier MahaRERA projects: declares 14 of 18 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that NYATI DEFENCE ENCLAVE I shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if NYATI DEFENCE ENCLAVE I is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NYATI DEFENCE ENCLAVE I?
The registered promoter entity is NYATI BUILDERS PRIVATE LIMITED, a company as per the filing. Its CIN U45202MH1996PTC102620 and GSTIN 27AAACN6418N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NYATI DEFENCE ENCLAVE I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NYATI DEFENCE ENCLAVE I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NYATI DEFENCE ENCLAVE I?
The professionals named in the filing: Engineer: KETAN JAYKAR; Engineer: AMOD DIXIT; Chartered Accountant: Milani Gattani & Co.; Chartered Accountant: Milani & Associates; Chartered Accountant: Vipin Gujrathi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NYATI DEFENCE ENCLAVE I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback