Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NISARG RESIDENCY is a Residential / Group Housing project by PANCHRATNA DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000013350 on 26 Sep 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameNISARG RESIDENCY
- TypeResidential / Group Housing
- Location
- Chandrapada
- Chaandrapada
- Vasai
- Palghar
- 401208
- Pincode401208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000013350
- ReraGenie IDRG-MH-64210
Builder
- NamePANCHRATNA DEVELOPERS
- Entity typePartnership
- PartnersARUNA DHANESHWAR BHOIR, SHARAN RAVINDRA KANTIRAO, SANDEEP PRABHAKAR KALE, SMITA SHEKHAR BHOIR, MANISHA NARENDRA BHOIR, MANGSH NARAYAN CHAVAN, SNEHA UMESH NAIK
- Other registrations4 more →
- Completed1 of 5
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects7 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Sep 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2023)
- Buildings5 building records
- Documents filed61 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NISARG RESIDENCY - WING A | NA | 6 | 0 | 0 | 0 | 0 |
| NISARG RESIDENCY - WING B | NA | 6 | 0 | 0 | 0 | 0 |
| NISARG RESIDENCY - WING C | NA | 6 | 0 | 0 | 0 | 0 |
| NISARG RESIDNCY- WING D | NA | 6 | 0 | 0 | 0 | 0 |
| NISARG RESIDENCY - WING E | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 28 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
34 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 90%.
NISARG RESIDENCY - WING A87%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
NISARG RESIDENCY - WING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
NISARG RESIDENCY - WING C87%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
NISARG RESIDNCY- WING D87%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
NISARG RESIDENCY - WING E87%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 28 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 60% |
| Community Buildings | Yes | 60% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 60% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | Yes | 60% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed5
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| NISARG RESIDENCY - WING A | 1 | 1 |
| NISARG RESIDENCY - WING B | 1 | 1 |
| NISARG RESIDENCY - WING C | 1 | 1 |
| NISARG RESIDNCY- WING D | 1 | 1 |
| NISARG RESIDENCY - WING E | 1 | 1 |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PRAKASH VIMALCHAND DHOKA | Andheri | Mumbai Suburban |
| PRAKASH DHOKA | Andheri | Mumbai Suburban |
| STAR BUIULDERS AND DEVELOPERS | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY NARANG |
| Partner | Role in project |
|---|---|
| PANCHRATNA DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir, With reference to cited subject, I the undersigned Partner of the Project: NISARG RESIDENCY would like to inform you that our Maharera Project due date about to expire, Due to covid 19 Pandemic and market slow down we could not complete the entire project within the stipulated timeline. Thus, our honour, in the larger interest of the Project kindly extends the Project further till 29-12-2024. We hope that a balanced approach keeping in view the object and intent of the enactment and the rights and liabilities of promoter and allottees in larger public interest is to be adopted. Thank
Reason as filed by the promoterDear Sir, Due to the ongoing financial challenges arising from the post-COVID situation, securing customers has become increasingly difficult. The project has been completed, with only 5 units remaining unsold. In light of these circumstances, we kindly request an extension of the deadline until 31st March 2025 to allow us additional time to secure buyers for the remaining units. We would be grateful for your understanding and support in granting this extension. Also find attached detailed reason for seeking extension along with architect's completion letter and OC for B wing Thank you for you
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000195816 | Aran Roman Dcunha | Sharan Ravindra Kantirao | 30/01/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Apr 2023
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 QE MAR2025 SIGNED.pdf | 28 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 QE MAR 2025 SIGNED.pdf | 28 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD AS ON 31 03 25.pdf | 28 May 2025 |
| Other - FinanceFile: STATUS OF WORK SIGNED.pdf | 28 May 2025 |
| Other - FinanceFile: REASON FOR SEEKING EXTENSION SIGNED.pdf | 28 May 2025 |
| Other - TechnicalFile: REASON FOR SEEKING EXTENSION SIGNED.pdf | 28 May 2025 |
| Other - TechnicalFile: STATUS OF WORK SIGNED.pdf | 28 May 2025 |
| Other - TechnicalFile: FORM 2A FY 24 25 SIGNED.pdf | 28 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY 24 25 SIGNED.pdf | 28 May 2025 |
| Certificates of CA (Form 3)File: FORM 3 -PANCHRATNA DEV-SIGNED - converted.pdf | 14 Apr 2025 |
| Declaration in FORM BFile: AFFIDAVIT FORM B-REVISED.pdf | 19 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 QE DEC 2024 SIGNED.pdf | 19 Mar 2025 |
| Certificates of CA (Form 3)File: SELF DECLARATION FOR FORM 3 .pdf | 19 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 QE DEC 2024 SIGNED.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD AS ON 31 12 2024 UPDATED.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY 23 23 SIGNED.pdf | 19 Mar 2025 |
| Certificates of CA (Form 3)File: form 3.pdf | 25 Jan 2025 |
| Other - FinanceFile: REASON FOR SEEKING EXTENSION SIGNED.pdf | 25 Jan 2025 |
| Other - FinanceFile: STATUS OF WORK SIGNED.pdf | 25 Jan 2025 |
| Other - FinanceFile: ARCHITECT COMPLETION LETTER WING WISE DATED 16 01 25.pdf | 25 Jan 2025 |
| Other - FinanceFile: OC b wing - converted.pdf | 25 Jan 2025 |
| Other - FinanceFile: OC b wing - converted.pdf | 25 Jan 2025 |
| Declaration in FORM BFile: AFFIDAVIT FORM B-REVISED.pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A.pdf | 14 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-2024.pdf | 14 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 1 SOLD UNSOLD FULL LIST DEC 23 HL.pdf | 11 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_2019-20.pdf | 10 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_2020-21.pdf | 10 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_2021-22.pdf | 10 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_2022-23.pdf | 10 Feb 2024 |
| Declaration in FORM BFile: FORM B REVISED - converted.pdf | 9 Feb 2024 |
| Declaration about Commencement CertificateFile: CC DECLARATION.pdf | 3 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHTECT CERT-PD.pdf | 3 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 1 ENG CERTIFICATE.pdf | 3 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A (2019-20).pdf | 3 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A (2020-21).pdf | 3 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A (2021-22).pdf | 3 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A (2022-23).pdf | 3 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD INVENTORY.pdf | 3 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2023 SIGNED.pdf | 3 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Nisarg.pdf | 14 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 130223 OPT.pdf | 16 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 140223 OPT.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021 PD.pdf | 13 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2022 PD_opt.pdf | 13 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 PD 2020.pdf | 13 Apr 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 AY 2019-20.pdf | 12 Apr 2021 |
| Certificates of CA (Form 5)File: FORM 5 SIGNED.pdf | 14 Oct 2018 |
| Building plan approvalFile: VVCMC.pdf | 16 Aug 2017 |
| Details of encumbrancesFile: Form B.pdf | 16 Aug 2017 |
| Building Plan Approval (IOD)File: VVCMC.pdf | 16 Aug 2017 |
| Layout approvalFile: Layout.pdf | 14 Aug 2017 |
| PAN CardFile: panchratna Developers (1).pdf | 14 Aug 2017 |
| Copy of the legal title reportFile: Title Report 2.pdf | 14 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 14 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: VVCMC.pdf | 14 Aug 2017 |
| Declaration in FORM BFile: Form B.pdf | 14 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITEHCT CERTIFICATE.pdf | 14 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf | 14 Aug 2017 |
| Certificates of CA (Form 3)File: ca.pdf | 14 Aug 2017 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 14 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep NISARG RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chaandrapada3,200+ in Palghar
Filed coordinates, straight-line distance. 70 registered projects within 2 km.
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: PANCHRATNA DEVELOPERS
PANCHRATNA DEVELOPERS has 5 registrations on MahaRERA, including 1CITYPRIDE and NISARG RESIDENCY. Its filings disclose 7 earlier MahaRERA projects: declares 0 of 5 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that NISARG RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if NISARG RESIDENCY is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NISARG RESIDENCY?
The registered promoter entity is PANCHRATNA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NISARG RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NISARG RESIDENCY?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NISARG RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NISARG RESIDENCY?
The professionals named in the filing: Architect: SANJAY NARANG. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NISARG RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback