ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / NISARG RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

NISARG RESIDENCY

By PANCHRATNA DEVELOPERS

RG-MH-64210 · RERA P99000013350 · Last updated on MahaRERA portal: 28 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
34 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 90%
1Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

NISARG RESIDENCY is a Residential / Group Housing project by PANCHRATNA DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000013350 on 26 Sep 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNISARG RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Chandrapada
    • Chaandrapada
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000013350
  • ReraGenie IDRG-MH-64210

Builder

  • NamePANCHRATNA DEVELOPERS
  • Entity typePartnership
  • PartnersARUNA DHANESHWAR BHOIR, SHARAN RAVINDRA KANTIRAO, SANDEEP PRABHAKAR KALE, SMITA SHEKHAR BHOIR, MANISHA NARENDRA BHOIR, MANGSH NARAYAN CHAVAN, SNEHA UMESH NAIK
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

10 months past promisethis monthRegisteredSep 2017First promiseDec 2023Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 Sep 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2023)
  • Buildings5 building records
  • Documents filed61 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NISARG RESIDENCY - WING ANA60000
NISARG RESIDENCY - WING BNA60000
NISARG RESIDENCY - WING CNA60000
NISARG RESIDNCY- WING DNA60000
NISARG RESIDENCY - WING ENA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 28 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

34 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 90%.

NISARG RESIDENCY - WING A87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
NISARG RESIDENCY - WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NISARG RESIDENCY - WING C87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
NISARG RESIDNCY- WING D87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
NISARG RESIDENCY - WING E87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 28 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes60%
Street LightingYes60%
Community BuildingsYes60%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes60%
Energy managemcntYes60%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5
BuildingClosed/CoveredTotal
NISARG RESIDENCY - WING A11
NISARG RESIDENCY - WING B11
NISARG RESIDENCY - WING C11
NISARG RESIDNCY- WING D11
NISARG RESIDENCY - WING E11

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
PRAKASH VIMALCHAND DHOKAAndheriMumbai Suburban
PRAKASH DHOKAAndheriMumbai Suburban
STAR BUIULDERS AND DEVELOPERSVasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI4382.21
Proposed, not sanctioned3,937 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA/12 RASHMI STARCITY PHASE I NAIGAON EAST 401208

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY NARANG
PartnerRole in project
PANCHRATNA DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000018393Dec 2023 → Dec 2024

Reason as filed by the promoterDear Sir, With reference to cited subject, I the undersigned Partner of the Project: NISARG RESIDENCY would like to inform you that our Maharera Project due date about to expire, Due to covid 19 Pandemic and market slow down we could not complete the entire project within the stipulated timeline. Thus, our honour, in the larger interest of the Project kindly extends the Project further till 29-12-2024. We hope that a balanced approach keeping in view the object and intent of the enactment and the rights and liabilities of promoter and allottees in larger public interest is to be adopted. Thank

EXT99000025631Dec 2023 → Dec 2025

Reason as filed by the promoterDear Sir, Due to the ongoing financial challenges arising from the post-COVID situation, securing customers has become increasingly difficult. The project has been completed, with only 5 units remaining unsold. In light of these circumstances, we kindly request an extension of the deadline until 31st March 2025 to allow us additional time to secure buyers for the remaining units. We would be grateful for your understanding and support in granting this extension. Also find attached detailed reason for seeking extension along with architect's completion letter and OC for B wing Thank you for you

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000195816Aran Roman DcunhaSharan Ravindra Kantirao30/01/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Apr 2023

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 QE MAR2025 SIGNED.pdf28 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 QE MAR 2025 SIGNED.pdf28 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD AS ON 31 03 25.pdf28 May 2025
Other - FinanceFile: STATUS OF WORK SIGNED.pdf28 May 2025
Other - FinanceFile: REASON FOR SEEKING EXTENSION SIGNED.pdf28 May 2025
Other - TechnicalFile: REASON FOR SEEKING EXTENSION SIGNED.pdf28 May 2025
Other - TechnicalFile: STATUS OF WORK SIGNED.pdf28 May 2025
Other - TechnicalFile: FORM 2A FY 24 25 SIGNED.pdf28 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY 24 25 SIGNED.pdf28 May 2025
Certificates of CA (Form 3)File: FORM 3 -PANCHRATNA DEV-SIGNED - converted.pdf14 Apr 2025
Declaration in FORM BFile: AFFIDAVIT FORM B-REVISED.pdf19 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 QE DEC 2024 SIGNED.pdf19 Mar 2025
Certificates of CA (Form 3)File: SELF DECLARATION FOR FORM 3 .pdf19 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 QE DEC 2024 SIGNED.pdf19 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD AS ON 31 12 2024 UPDATED.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY 23 23 SIGNED.pdf19 Mar 2025
Certificates of CA (Form 3)File: form 3.pdf25 Jan 2025
Other - FinanceFile: REASON FOR SEEKING EXTENSION SIGNED.pdf25 Jan 2025
Other - FinanceFile: STATUS OF WORK SIGNED.pdf25 Jan 2025
Other - FinanceFile: ARCHITECT COMPLETION LETTER WING WISE DATED 16 01 25.pdf25 Jan 2025
Other - FinanceFile: OC b wing - converted.pdf25 Jan 2025
Other - FinanceFile: OC b wing - converted.pdf25 Jan 2025
Declaration in FORM BFile: AFFIDAVIT FORM B-REVISED.pdf14 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A.pdf14 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-2024.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: 1 SOLD UNSOLD FULL LIST DEC 23 HL.pdf11 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_2019-20.pdf10 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_2020-21.pdf10 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_2021-22.pdf10 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_2022-23.pdf10 Feb 2024
Declaration in FORM BFile: FORM B REVISED - converted.pdf9 Feb 2024
Declaration about Commencement CertificateFile: CC DECLARATION.pdf3 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHTECT CERT-PD.pdf3 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 1 ENG CERTIFICATE.pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A (2019-20).pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A (2020-21).pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A (2021-22).pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A (2022-23).pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD INVENTORY.pdf3 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2023 SIGNED.pdf3 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Nisarg.pdf14 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 130223 OPT.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 140223 OPT.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021 PD.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2022 PD_opt.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 PD 2020.pdf13 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 AY 2019-20.pdf12 Apr 2021
Certificates of CA (Form 5)File: FORM 5 SIGNED.pdf14 Oct 2018
Building plan approvalFile: VVCMC.pdf16 Aug 2017
Details of encumbrancesFile: Form B.pdf16 Aug 2017
Building Plan Approval (IOD)File: VVCMC.pdf16 Aug 2017
Layout approvalFile: Layout.pdf14 Aug 2017
PAN CardFile: panchratna Developers (1).pdf14 Aug 2017
Copy of the legal title reportFile: Title Report 2.pdf14 Aug 2017
Copy of Layout Approval (in case of layout)File: Layout.pdf14 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: VVCMC.pdf14 Aug 2017
Declaration in FORM BFile: Form B.pdf14 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITEHCT CERTIFICATE.pdf14 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf14 Aug 2017
Certificates of CA (Form 3)File: ca.pdf14 Aug 2017
Proforma of Allotment letterFile: Allotment Letter.pdf14 Aug 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 24 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NISARG RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chaandrapada3,200+ in Palghar

2 kmNISARG RESIDENCYCompleted 36Lapsed / revoked 18Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: PANCHRATNA DEVELOPERS

PANCHRATNA DEVELOPERS has 5 registrations on MahaRERA, including 1CITYPRIDE and NISARG RESIDENCY. Its filings disclose 7 earlier MahaRERA projects: declares 0 of 5 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that NISARG RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NISARG RESIDENCY is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NISARG RESIDENCY?

The registered promoter entity is PANCHRATNA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NISARG RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NISARG RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NISARG RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NISARG RESIDENCY?

The professionals named in the filing: Architect: SANJAY NARANG. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NISARG RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NISARG RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NISARG RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.