Home / Browse projects / Palghar, Maharashtra / NIRMAL HEIGHTS BLDG NO.02

Registered No litigation declared Residential / Group Housing project

NIRMAL HEIGHTS BLDG NO.02

By S.R.A. DEVELOPERS

RG-MH-43846 · RERA P99000033567 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
18 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
6 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

NIRMAL HEIGHTS BLDG NO.02 is a Residential / Group Housing project by S.R.A. DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000033567 on 22 Feb 2022. Possession is promised by 31 Mar 2027. 72 of the 78 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameNIRMAL HEIGHTS BLDG NO.02
  • TypeResidential / Group Housing
  • Location
    • Near Nirmal Market
    • Nallasopara West
    • Nagale
    • Vasai
    • Palghar
    • 401304
  • Pincode401304
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000033567
  • ReraGenie IDRG-MH-43846

Builder

  • NameS.R.A. DEVELOPERS
  • Entity typePartnership
  • PartnersSYLVESTER SIMON DBRITTO, ROCKY PASCOL ALMEIDA

Key dates

this monthRegisteredFeb 2022PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2022
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed67 files

Current status

92%72 of 78 units booked
98.7%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WiNGNA6639039
B WingNA6639039

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

A WiNG82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Wing82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Closed/Covered19
Open Space78
BuildingClosed/CoveredOpen SpaceTotal
A WiNG93948
B Wing103949

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jul 2025

Approvals and building plan

Sanctioning authorityVasai-Virar City Municipal Corporation
Permissible FSI3475.16
Proposed, not sanctioned3,475 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1st Floor Gonsalo Garcia School Building nallasopara west
Estimated costRs 9.97 cr
Cost incurredRs 9.84 cr
Work done98.7%
BuildingWingEstimatedIncurred
A WiNGNARs 4.49 crRs 4.49 cr
B WingNARs 4.49 crRs 4.49 cr
-NARs 99.69 lakhRs 86.73 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh S Kekre
EngineerSufiyan Shaikh
Chartered AccountantDharmendra Lunawat
Chartered AccountantMishra Mayekar & Co.
PartnerRole in project
S.R.A. DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Sra developer form 01.pdf21 Apr 2026
Withdrawal Update Form 1File: SRA DEVELOPERS FORM 1.pdf21 Apr 2026
Withdrawal Update Form 2File: SRA developer form 02.pdf21 Apr 2026
Withdrawal Update Form 2File: SRA DEVELOPERS FORM 2.pdf21 Apr 2026
Withdrawal Update Form 3File: SRA Developer form 3 -DEC 2025.pdf21 Apr 2026
Withdrawal Update Form 3File: FORM-3 SRA_OK.pdf21 Apr 2026
Withdrawal Update Form 1File: SRA FORM 1 WITH SIGNATURE.pdf18 Oct 2025
Withdrawal Update Form 2File: engineer.pdf18 Oct 2025
Withdrawal Update Form 3File: FORM 3 WITH SIGNATURE_compressed.pdf18 Oct 2025
Form 1File: Architech Certificate_compressed.pdf14 Jul 2025
Form 2File: Engineer Certificate form 2.pdf14 Jul 2025
Form 3File: Certificate scan Form 3.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Data.pdf14 Jul 2025
Form 1File: June Declaration.pdf14 Jul 2025
Form 2File: June Declaration.pdf14 Jul 2025
Form 3File: June Declaration.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Data.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Data.pdf14 Jul 2025
Form 1File: september declaration.pdf14 Jul 2025
Form 2File: september declaration.pdf14 Jul 2025
Form 3File: september declaration.pdf14 Jul 2025
Form 1File: sra form 1 sept-23.pdf14 Jul 2025
Form 2File: FORM 2.pdf14 Jul 2025
Form 3File: SCAN FORM 3 July 23 to Sep 23.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q2 sold and Unsold data Till Sep 23 (July23 to Sep 23).pdf14 Jul 2025
Form 1File: form 1.pdf14 Jul 2025
Form 2File: form 2.pdf14 Jul 2025
Form 3File: Q4 Scan Form 3.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf14 Jul 2025
Form 1File: FORM 1.pdf14 Jul 2025
Form 2File: FORM 2.pdf14 Jul 2025
Form 3File: Scan Form 3 SRA Q1.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold & unsold.pdf14 Jul 2025
Form 1File: Form 1 SRA Developers.pdf14 Jul 2025
Form 2File: Form 2 SRA Q3.pdf14 Jul 2025
Form 3File: Scan final form 3 Q3 SRA.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold list.pdf14 Jul 2025
Form 1File: Form 1.pdf14 Jul 2025
Form 2File: Form 2.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf14 Jul 2025
Form 3File: Both Signed Form 3.pdf14 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 with signature.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 Form 3 SRA.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 with signature1.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SRA Developers.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 SRA.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SRA Q3.pdf13 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SRA FORM 5 FY 2022-23 signed.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan form 3 New.pdf4 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Scan Form 5 FY 2021 22.pdf1 Feb 2023
Copy of the legal title reportFile: Search Report.pdf14 Feb 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf14 Feb 2022
Declaration about Commencement CertificateFile: FORMAT D sign (Commencement Certificate).pdf2 Feb 2022
CERSAI detailsFile: cersai.pdf2 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate_compressed.pdf1 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer.pdf1 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf1 Feb 2022
Layout approvalFile: Layout Plan.pdf31 Jan 2022
Building plan approvalFile: Building Plan.pdf31 Jan 2022
PAN CardFile: SRA Developers Pan Card.pdf31 Jan 2022
Details of encumbrancesFile: Encumbrances.pdf31 Jan 2022
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf31 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf31 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: SRA CC_.pdf31 Jan 2022
Declaration in FORM BFile: Form -B Affidavit certificate.pdf31 Jan 2022
Proforma of Allotment letterFile: Performa Agreement for sale.pdf31 Jan 2022
OtherFile: SRA Partnership Deed.pdf31 Jan 2022

How this compares with Palghar

92%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIRMAL HEIGHTS BLDG NO.02 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nallasopara West3,200+ in Palghar

Builder: S.R.A. DEVELOPERS

S.R.A. DEVELOPERS has 1 registration on MahaRERA, including NIRMAL HEIGHTS BLDG NO.02. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if NIRMAL HEIGHTS BLDG NO.02 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRMAL HEIGHTS BLDG NO.02?

The registered promoter entity is S.R.A. DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRMAL HEIGHTS BLDG NO.02?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRMAL HEIGHTS BLDG NO.02?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRMAL HEIGHTS BLDG NO.02?

The professionals named in the filing: Architect: Umesh S Kekre; Engineer: Sufiyan Shaikh; Chartered Accountant: Dharmendra Lunawat; Chartered Accountant: Mishra Mayekar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRMAL HEIGHTS BLDG NO.02?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRMAL HEIGHTS BLDG NO.02. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRMAL HEIGHTS BLDG NO.02 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.