Home / Browse projects / Nashik, Maharashtra / Aaradhya Nakshatra

Registration lapsed No litigation declared Residential / Group Housing project

Aaradhya Nakshatra

By SHREYASH BUILDCON

RG-MH-79988 · RERA P51600049644 · Last updated on MahaRERA portal: 20 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
124 of 124Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

Aaradhya Nakshatra is a Residential / Group Housing project by SHREYASH BUILDCON in Nashik, Maharashtra, registered with MahaRERA as P51600049644 on 22 Feb 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 0 of the 124 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAaradhya Nakshatra
  • TypeResidential / Group Housing
  • Location
    • Plot No 1 2 3 4 Survey No 343
    • Jalalpur
    • Nashik
    • 422005
  • Pincode422005
  • RERA no.P51600049644
  • ReraGenie IDRG-MH-79988

Builder

  • NameSHREYASH BUILDCON
  • Entity typePartnership
  • PartnersASHOK VISHWANATH TRIBHUVAN, KISHOR UTTAMRAO SALGUDE
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredFeb 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Feb 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed55 files

Current status

0%0 of 124 units booked

Figures as on 20 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aaradhya NakshatraNA779826124

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

Aaradhya Nakshatra: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 20 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes45%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes30%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed379

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots379
Open Space379

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,852 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 May 2026

Approvals and building plan

Sanctioning authorityNashik Metropolitan Region Development Authority Nashik
Permissible FSI11671.06
Proposed, not sanctioned11,671 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGangapur Road, Narsinha Nagar

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRavi Amrutkar
EngineerKishor Salgude
Chartered AccountantCA Prashant Kadam
PartnerRole in project
SHREYASH BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Jul 2024

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Revised Plan.pdf20 Feb 2025
Copy of Layout Approval (in case of layout)File: Revised Plan.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1 23).pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1 24).pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 22-23 Q4_11zon.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 23-24 Q1_11zon.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 23-24 Q2_11zon.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 23-24 Q3_11zon.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 23-24 Q4_11zon.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 22-23 Q4.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 23-24 Q4.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 23-24 Q3.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 23-24 Q2.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 23-24 Q1.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form -2A FY-2022-23.pdf20 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 - 2022-23.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A- FY-2023-24.pdf20 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 - 2023-24.pdf20 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART COMPLETION.pdf11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: ca letter.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca letter.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 Feb 2023
Other - LegalFile: Legal.pdf15 Feb 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate N.pdf10 Feb 2023
Details of encumbrances concerned to FinanceFile: Legal.pdf9 Feb 2023
Details of encumbrances concerned to LegalFile: Legal.pdf9 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200259981296_For_Asset_Based_Search_09_02_2023_15_16_13_742 111.pdf9 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200259981296_For_Asset_Based_Search_09_02_2023_15_16_13_742 111.pdf9 Feb 2023
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf8 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Final 1.pdf7 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank declaration.pdf7 Feb 2023
Declaration in FORM BFile: ashok tribhuvan form b.pdf25 Jan 2023
Declaration in FORM BFile: kishor salgude form b.pdf25 Jan 2023
Declaration in FORM BFile: rajendra abhale form b.pdf25 Jan 2023
Layout approvalFile: Layout Final.pdf8 Jan 2023
Copy of Layout Approval (in case of layout)File: Layout Final.pdf8 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Disclosure Ashok.pdf8 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Disclosure Kishor.pdf8 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Disclosure Rajendra.pdf8 Jan 2023
Building plan approvalFile: Plan 1.pdf29 Dec 2022
Building plan approvalFile: Plan 2.pdf29 Dec 2022
Building plan approvalFile: Plan 3.pdf29 Dec 2022
Building plan approvalFile: Plan 4.pdf29 Dec 2022
PAN CardFile: PAN.pdf29 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf29 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf29 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf29 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf29 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf29 Dec 2022
Proforma of Allotment letterFile: Allot ment Lettr.pdf29 Dec 2022
Proforma of Agreement for saleFile: Agreement to sale Flat.pdf29 Dec 2022
Deviation Report with respect to Allotment letterFile: deviation.pdf29 Dec 2022
Deviation Report with respect to model copy of AgreementFile: deviation.pdf29 Dec 2022

How this compares with Nashik

0%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aaradhya Nakshatra on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jalalpur4,100+ in Nashik

Builder: SHREYASH BUILDCON

SHREYASH BUILDCON has 2 registrations on MahaRERA, including Aaradhya Nakshatra and AARADHYA MARIGOLD MANOR. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that Aaradhya Nakshatra shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Aaradhya Nakshatra is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aaradhya Nakshatra?

The registered promoter entity is SHREYASH BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aaradhya Nakshatra?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aaradhya Nakshatra?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aaradhya Nakshatra?

The professionals named in the filing: Architect: Ravi Amrutkar; Engineer: Kishor Salgude; Chartered Accountant: CA Prashant Kadam. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aaradhya Nakshatra?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aaradhya Nakshatra. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aaradhya Nakshatra to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.