Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 138 documents Report an error

MONTESOUTH PILATUS 4 is a Residential / Group Housing project by SWAYAM REALTORS & TRADERS LLP in BYCULLA, 400011, registered with MahaRERA as P51900049688 on 22 Feb 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameMONTESOUTH PILATUS 4
  • TypeResidential / Group Housing
  • Location
    • BABURAO JAGTAP MARG
    • BYCULLA
    • 400011
  • Pincode400011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900049688
  • ReraGenie IDRG-MH-41862

Builder

  • NameSWAYAM REALTORS & TRADERS LLP
  • Entity typePartnership
  • GSTIN27ACEFS2816A1ZI
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerSUNIL BALAKRISHNA SHARMA
  • Other registrations8 more →
  • Completed2 of 9
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed138 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MONTESOUTH PILATUSNA1010000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

MONTESOUTH PILATUS: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes75%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,476 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6000.0
Proposed, not sanctioned3,000 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMULUND DEVIDAYAL ROAD MUMBAI 400080

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSantoshkumar Premchandra Dubey
EngineerUrvesh Virendra Mehta
Chartered AccountantDinesh Ganpat Pai
Chartered AccountantB R Nagda & Co. Chartered Accountants
Chartered AccountantKaushal Chaulawala
PartnerRole in project
SWAYAM REALTORS & TRADERS LLP-

Litigation declared2

CaseCourtStatus
2669/2008BOMBAY HIGH COURTPENDING
1980/2019BOMBAY HIGH COURTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed138

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Q3_AC_Form-1_Pilatus-4_2025.pdf5 Jun 2026
Form 2File: Form 2 Eng Cert Pil 4 Dec 2025.pdf5 Jun 2026
Form 3File: Form 3 CA Cert Pil 4 Dec 2025.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold Pil 4 Dec 2025.pdf5 Jun 2026
Form 1File: Q4_AC_Form-1_Pilatus-4_2026.pdf4 Jun 2026
Form 2File: Form 2 Eng Cert Pilatus 4 Mar 2026.pdf4 Jun 2026
Form 3File: Form 3 CA Cert PIL 4 Mar 2026.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold Mar 2026.pdf4 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A Montesouth Pil 4 Mar 2026.pdf21 Apr 2026
Form 1File: Q4_AC_Form-1_Pilatus-4_2023-1.pdf18 Dec 2025
Form 2File: Pilatus 4 RERA Eng Cert till 26-04-2023.pdf18 Dec 2025
Form 3File: Form 3 CACert Pil 4 Mar 2023.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: DSUI Pil 4 Mar 2023.pdf18 Dec 2025
Form 1File: Q1_AC_Form-1_Pilatus-4_2023.pdf18 Dec 2025
Form 2File: Pilatus-4 RERA Eng certificate till 3-08-2023.pdf18 Dec 2025
Form 3File: Form 3 Ca Cert PILATUS 4 JUN23.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: DSUI PILATUS 4 JUN23-3.pdf18 Dec 2025
Form 1File: Q2_AC_Form-1_Pilatus-4_2023.pdf18 Dec 2025
Form 2File: Form 2 Engg Cert Pilatus 4 - September 2023.pdf18 Dec 2025
Form 3File: Form 3 CA Cert Pil 4 Sep 2023.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: DSUI Pil 4 Sep 2023-3.pdf18 Dec 2025
Form 1File: Q3_AC_Form-1_Pilatus-4_2023.pdf18 Dec 2025
Form 2File: Form 2 Engg Cert Pilatus 4 - December 2023.pdf18 Dec 2025
Form 3File: Form 3 CA Cert Pil 4 Dec 2023.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: DSUI Pil 4 Dec 2023-3.pdf18 Dec 2025
Form 1File: Q4_AC_Form-1_Pilatus-4_2024.pdf18 Dec 2025
Form 2File: Form 2 Engg Cert Pilatus 4 - March 2024.pdf18 Dec 2025
Form 3File: Form 3 CA Certificate Pil-4 Mar 24 Revised.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: DSUI Pil-4 Mar 24.pdf18 Dec 2025
Form 1File: Q1_AC_Form-1_Pilatus-4_2024.pdf18 Dec 2025
Form 2File: Form 2 Engg Cert Monte South-Pilatus 4 - June 2024.pdf18 Dec 2025
Form 3File: Form 3 Ca Cert Pil 4 June 24.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: DSUI Pil 4 June 24-3.pdf18 Dec 2025
Form 1File: Q2_AC_Form-1_Pilatus-4_2024.pdf18 Dec 2025
Form 2File: Form 2 Engg Cert Pilatus 4 - Sep 2024.pdf18 Dec 2025
Form 3File: Form 3 Ca Certi PIL-4 Sep 2024.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: DSUI PIL-4 Sep 2024.pdf18 Dec 2025
Form 1File: Q3_AC_Form-1_Pilatus-4_2024.pdf18 Dec 2025
Form 2File: Engg Cert Monte South Pilauts-4 Dec 2024.pdf18 Dec 2025
Form 3File: Form 3 CA Cert pilatus-4 Dec 2024.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: DSUI pilatus-4 Dec 2024.pdf18 Dec 2025
Form 1File: Q4_AC_Form-1_Pilatus-4_2025.pdf18 Dec 2025
Form 2File: Form 2 Engg Cert Pil 4 Mar 2025.pdf18 Dec 2025
Form 3File: 202503 RERA Certificate Montesouth Tower B Pilatus 4 - Form 3.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: DSUI Pilatus 4 - Form 3.pdf18 Dec 2025
Form 1File: signedQ1_AC_Form-1_Pilatus-4_2025.pdf18 Dec 2025
Form 2File: Form 2 Engg Cert -Pilatus-4- Jun 2025.pdf18 Dec 2025
Form 3File: 202506 RERA Certificate Montesouth Tower B Pilatus 4 - Form 3.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold book Inventory Jun 2025.pdf18 Dec 2025
Form 1File: Q2_AC_Form-1_Pilatus-4_2025.pdf11 Dec 2025
Form 2File: Form 2_Engineer's Certificate_Monte South-TB-Pilatus-4- Sep 2025.pdf11 Dec 2025
Form 3File: 202509 RERA Certificate Montesouth Tower B Pilatus 4 Form 3.pdf11 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclousre Montesouth Pilatus 4.pdf11 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Pilatus 4 2024-25 (2).pdf11 Dec 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Monte South Pilauts-4 Dec 2024.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate Pilatus 4 - Dec 24.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert pilatus-4 Dec 2024.pdf19 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engg Cert Pilatus 4 SEP 2024.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3_AC_Form-1_Pilatus-4_2024.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3_AC_Form-1_Pilatus-4_2024.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3_AC_Form-1_Pilatus-4_2024.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certi PIL-4 Sep 2024.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certi PIL-4 Sep 2024.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certi PIL-4 Sep 2024.pdf9 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Pil-4.pdf17 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Pil-4.pdf17 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Pil-4.pdf17 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Pil-4 2023-24.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Pil-4 2023-24.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Pil-4 2023-24.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2_AC_Form-1_Pilatus-4_2024.pdf14 Oct 2024
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200260161955_For_Registration_Of_Security_Interest_13_02_202314 Oct 2024
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200260164379_For_Registration_Of_Security_Interest_13_02_202314 Oct 2024
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200260165736_For_Registration_Of_Security_Interest_13_02_202314 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2_AC_Form-1_Pilatus-4_2024.pdf14 Oct 2024
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200260161955_For_Registration_Of_Security_Interest_13_02_202314 Oct 2024
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200260164379_For_Registration_Of_Security_Interest_13_02_202314 Oct 2024
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200260165736_For_Registration_Of_Security_Interest_13_02_202314 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2_AC_Form-1_Pilatus-4_2024.pdf14 Oct 2024
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200260161955_For_Registration_Of_Security_Interest_13_02_202314 Oct 2024

Keep MONTESOUTH PILATUS 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BYCULLA

Builder: SWAYAM REALTORS & TRADERS LLP

SWAYAM REALTORS & TRADERS LLP has 9 registrations on MahaRERA, including MONTESOUTH-1 and MONTESOUTH-2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if MONTESOUTH PILATUS 4 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MONTESOUTH PILATUS 4?

The registered promoter entity is SWAYAM REALTORS & TRADERS LLP, a partnership as per the filing. Its GSTIN 27ACEFS2816A1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MONTESOUTH PILATUS 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MONTESOUTH PILATUS 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MONTESOUTH PILATUS 4?

The professionals named in the filing: Architect: Santoshkumar Premchandra Dubey; Engineer: Urvesh Virendra Mehta; Chartered Accountant: Dinesh Ganpat Pai; Chartered Accountant: B R Nagda & Co. Chartered Accountants; Chartered Accountant: Kaushal Chaulawala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MONTESOUTH PILATUS 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MONTESOUTH PILATUS 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MONTESOUTH PILATUS 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.