Home / Browse projects / MONTESOUTH-6
MONTESOUTH-6
By SWAYAM REALTORS & TRADERS LLP
RG-MH-10156 · RERA P51800002818 · Last updated on MahaRERA portal: 18 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 16 months
- 2 extensions taken
- Rs 375.00 crore secured on the land, in favour of IndusInd Bank
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MONTESOUTH-6 is a Residential / Group Housing project by SWAYAM REALTORS & TRADERS LLP in 400011, registered with MahaRERA as P51800002818 on 4 Aug 2017. Possession is promised by 31 Oct 2026. The completion date has moved by 16 months from the original filing. 41 of the 53 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameMONTESOUTH-6
- TypeResidential / Group Housing
- Location
- BABURAO GANPATH MARG
- 400011
- Pincode400011
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800002818
- ReraGenie IDRG-MH-10156
Builder
- NameSWAYAM REALTORS & TRADERS LLP
- Entity typePartnership
- GSTIN27ACEFS2816A1ZI
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnerSUNIL BALAKRISHNA SHARMA
- Other registrations8 more →
- Completed2 of 9
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Aug 2017
- Promised completion31 Oct 2026
- Revised completionRevised to 31 Oct 2026 (originally 30 Jun 2025)
- Buildings1 building record
- Documents filed400 files
Current status
Figures as on 18 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No.1 Wing B | NA | 9 | 9 | 53 | 0 | 53 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 96%.
Building No.1 Wing B: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 96% |
| Sanitary Fittings within the flats / premises | 15% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 87% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
Progress on shared amenities15
As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 40% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 25% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed97
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building No.1 Wing B | NA | Rs 73.61 cr | Rs 58.75 cr |
| - | NA | Rs 9.56 cr | Rs 6.04 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Santoshkumar Premchandra Dubey |
| Engineer | Urvesh Virendra Mehta |
| Chartered Accountant | B R Nagda & Co. Chartered Accountants |
| Chartered Accountant | Samip Kiritkumar Shah |
| Chartered Accountant | Kaushal Chaulawala |
| Chartered Accountant | Ankit Shah |
| Chartered Accountant | Dinesh Ganpat Pai |
| Partner | Role in project |
|---|---|
| SWAYAM REALTORS & TRADERS LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDEAR SIR Delay in approval by the BMC authority. Considering the above causes completion of Project by 30th June 2025, would be difficult to achieve the date disclosed at the time registration of project. In view of that, we request your kind authority to kindly give us an extension till 30th June 2026.
Reason as filed by the promoterIn connection with our application filed under Form ‘E’ for the extension of registration of the project “MONTESOUTH-6” for a period of 6 Months ending on 31/12/2026, we hereby submit this Explanatory Note detailing the unavoidable reasons, force majeure scenarios, and reasonable grounds that led to the delay in the development works
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600534 | Deepak Kumar Ambalal Poonamiya | SWAYAM REALTORS & TRADERS LLP | 31/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jun 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2026
Documents filed400
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 400 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Q1_AC_Form-1_Pilatus-3_2026.pdf | 18 Aug 2026 |
| Withdrawal Update Form 2File: FORM2-Montesouth6 (Pilatus 3)-June2026.pdf | 18 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Ca Cert pil 3 Jun 2026 Revised sign.pdf | 18 Aug 2026 |
| Withdrawal Update Form 1File: Q4_AC_Form-1_Pilatus-3_2026.pdf | 17 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Eng Cert Pil -3 Mar 2026 pdf 1.pdf | 17 Jun 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 Pil 3 Mar 2026 sign.pdf | 17 Jun 2026 |
| Layout approvalFile: layout plan pilatus.pdf | 4 Jun 2026 |
| Declaration and undertaking (Annexure A)File: Annexure-A.pdf | 11 May 2026 |
| Building plan approvalFile: Amended Plan Approval Letter dt 262025.pdf | 5 May 2026 |
| Building plan approvalFile: 2-4.pdf | 5 May 2026 |
| Building plan approvalFile: 5-7.pdf | 5 May 2026 |
| Building plan approvalFile: 8-11.pdf | 5 May 2026 |
| Building plan approvalFile: 12-14.pdf | 5 May 2026 |
| Building plan approvalFile: 15.pdf | 5 May 2026 |
| Building plan approvalFile: 16.pdf | 5 May 2026 |
| Building plan approvalFile: 17_1.pdf | 5 May 2026 |
| Building plan approvalFile: 18.pdf | 5 May 2026 |
| Building plan approvalFile: 18.pdf | 5 May 2026 |
| Building plan approvalFile: 19_1.pdf | 5 May 2026 |
| Building plan approvalFile: 20_1.pdf | 5 May 2026 |
| Building plan approvalFile: 21_1.pdf | 5 May 2026 |
| Building plan approvalFile: 22_1.pdf | 5 May 2026 |
| Building plan approvalFile: 23_1.pdf | 5 May 2026 |
| Building plan approvalFile: 24_1.pdf | 5 May 2026 |
| Building plan approvalFile: 25.pdf | 5 May 2026 |
| Building plan approvalFile: 26.pdf | 5 May 2026 |
| Building plan approvalFile: 27.pdf | 5 May 2026 |
| Building plan approvalFile: 28.pdf | 5 May 2026 |
| Building plan approvalFile: 29.pdf | 5 May 2026 |
| Building plan approvalFile: 30.pdf | 5 May 2026 |
| Building plan approvalFile: 31_1.pdf | 5 May 2026 |
| Building plan approvalFile: 32.pdf | 5 May 2026 |
| Building plan approvalFile: 33_1.pdf | 5 May 2026 |
| Building plan approvalFile: 34_1.pdf | 5 May 2026 |
| Building plan approvalFile: 35_1.pdf | 5 May 2026 |
| Building plan approvalFile: 36.pdf | 5 May 2026 |
| Building plan approvalFile: 37.pdf | 5 May 2026 |
| Building plan approvalFile: 38.pdf | 5 May 2026 |
| Building plan approvalFile: 39.pdf | 5 May 2026 |
| Layout approvalFile: 01_Layout.pdf | 27 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Montesouth 6 Mar 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Q2_AC_Form-1_Pilatus-3_2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 1File: Q3_AC_Form-1_Pilatus-3_2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engg Certificate Pilatus-3- Sep 2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Eng Cert Pilatus-3- Dec 2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 3File: 202509 RERA Certificate Montesouth Tower B Pilatus 3 Form 3.pdf | 4 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Cert Pil 3 Dec 2025.pdf | 4 Apr 2026 |
| Form 5 (FY 2024-2025)File: Pilatus 3 form 5.pdf | 26 Feb 2026 |
| Form 5 (FY 2017-2018)File: Form 5 Pil 3 2017-18.pdf | 25 Feb 2026 |
| Form 5 (FY 2021-2022)File: Form 5 Pil 3 2021-22.pdf | 25 Feb 2026 |
| Form 5 (FY 2022-2023)File: Form 5 Pil 3 2022-23.pdf | 25 Feb 2026 |
| Form 5 (FY 2023-2024)File: Form 5 Pil 3 2023-24.pdf | 25 Feb 2026 |
| Form 5 (FY 2018-2019)File: Form 5 Pil 3 2018-19.pdf | 25 Feb 2026 |
| Form 5 (FY 2019-2020)File: Form 5 Pil 3 2019-20.pdf | 25 Feb 2026 |
| Form 5 (FY 2020-2021)File: Form 5 Pil 3 2020-21.pdf | 25 Feb 2026 |
| Form 2A (FY 2017-2018)File: Form 2A Pilatus 3 Mar 2018.pdf | 2 Feb 2026 |
| Form 2A (FY 2019-2020)File: Form 2A Pilatus 3 Mar 2020.pdf | 2 Feb 2026 |
| Form 2A (FY 2020-2021)File: Form 2A Pilatus 3 Mar 2021.pdf | 2 Feb 2026 |
| Form 2A (FY 2021-2022)File: Form 2A Pil-3 Mar 2022.pdf | 2 Feb 2026 |
| Form 2A (FY 2022-2023)File: Form 2A Pilatus-3 Mar 2023.pdf | 2 Feb 2026 |
| Form 2A (FY 2023-2024)File: FORM-2A PILATUS 3_ MAR-2024.pdf | 2 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A Pil 3 Mar 2025.pdf | 2 Feb 2026 |
| Form 2A (FY 2018-2019)File: Form 2A Pilatus 3 Mar 2019.pdf | 2 Feb 2026 |
| Withdrawal Update Form 1File: Q3_AC_Form-1_Pilatus-3_2024.pdf | 11 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Engineeru0027s Certificate Pilatus-3 Dec 2024.pdf | 11 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Ca Cert Pil 3 June24.pdf | 11 Dec 2025 |
| Form 1File: 20200331 Form 1 Pilatus 3.pdf | 21 Nov 2025 |
| Form 2File: 20200331 Form 2 Pilatus 3.pdf | 21 Nov 2025 |
| Form 3File: 20200331 Form 3 Pilatus 3.pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory 20200331 Pilatus 3.pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory 20191231 Pilatus 3.pdf | 21 Nov 2025 |
| Form 3File: 20191231 Form 3 Pilatus 3.pdf | 21 Nov 2025 |
| Form 2File: 20191231 Form 2 Pilatus 3.pdf | 21 Nov 2025 |
| Form 1File: 20191231 Form 1 Pilatus 3.pdf | 21 Nov 2025 |
| Form 1File: 20190630 Form 1 Pilatus 3.pdf | 21 Nov 2025 |
| Form 2File: 20190630 Form 2 Pilatus 3.pdf | 21 Nov 2025 |
| Form 3File: 20190630 Form 3 Pilatus 3.pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory 20190630 Pilatus 3.pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory 20190331 Pilatus 3.pdf | 21 Nov 2025 |
| Form 3File: 20190331 Form 3 Pilatus 3.pdf | 21 Nov 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 400 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MONTESOUTH-6 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near this project
Filed coordinates, straight-line distance. 43 registered projects within 2 km.
NATHANI HEIGHTS SALE
Nathani Parekh Constructions Private Limit
North Tower - Tower 3
Glider Buildcon Realtors
MONTESOUTH ZERMATT-1
SWAYAM REALTORS & TRADERS LLP
South Tower
Glider Buildcon Realtors
MINERVA
Lokhandwala Kataria Construction Private L
Lodha Bellevue
Lodha Developers Limited
Builder: SWAYAM REALTORS & TRADERS LLP
SWAYAM REALTORS & TRADERS LLP has 9 registrations on MahaRERA, including MONTESOUTH-1 and MONTESOUTH-2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if MONTESOUTH-6 is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MONTESOUTH-6?
The registered promoter entity is SWAYAM REALTORS & TRADERS LLP, a partnership as per the filing. Its GSTIN 27ACEFS2816A1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MONTESOUTH-6?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MONTESOUTH-6?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MONTESOUTH-6?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MONTESOUTH-6?
The professionals named in the filing: Architect: Santoshkumar Premchandra Dubey; Engineer: Urvesh Virendra Mehta; Chartered Accountant: B R Nagda & Co. Chartered Accountants; Chartered Accountant: Samip Kiritkumar Shah; Chartered Accountant: Kaushal Chaulawala; Chartered Accountant: Ankit Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MONTESOUTH-6?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback