Home / Browse projects / Mumbai Suburban, Maharashtra / MERAKI ARENA
MERAKI ARENA
RG-MH-11936 · RERA P51800007144 · Last updated on MahaRERA portal: 26 Dec 2022
Source: official MahaRERA filing
Red flags
- Completion date moved by 25 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MERAKI ARENA is a Commercial project by Meraki Habitats LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007144 on 17 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2022. The completion date has moved by 25 months from the original filing.
At a glance
Project
- NameMERAKI ARENA
- TypeCommercial
- Location
- CHEMBUR
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800007144
- ReraGenie IDRG-MH-11936
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Aug 2017
- Promised completion31 Dec 2022
- Revised completionRevised to 31 Dec 2022 (originally 30 Nov 2020)
- Buildings1 building record
- Documents filed56 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MERAKI ARENA | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
MERAKI ARENA: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed154
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| NIRMAL CHHADWA | Kurla | Mumbai Suburban |
| LEENA NIRMAL CHHADWA | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AMIT PAWAR |
| Partner | Role in project |
|---|---|
| Meraki Habitats LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have Real Estate project registered with MahaRERA authority with name “: SABARI PARK” vide Certificate No. P51800007144 dated 17/08/2017. Due date for the completion of the project as estimated at the time of the registration is 30/05/2020. Thereafter due to Notification/Order No 13 and 14 dated 2nd April 2020 and 18th May 2020 respectively issued by MahaRERA an extension of six months received and date of completion became 30th November 2020. We have annexed latest Form 1 that is Form from Architect showing current status of the project as well as Form 3 that is Chartered Accountant’s form
Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no P51800007144 As prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of 51% of the allottees is enclosed herewith.
Litigation declared7
| Case | Court | Status |
|---|---|---|
| 512/955/2008 | SMALL CAUSES COURT | SUIT IS DISMISSED |
| 2086/2150/2008 | SMALL CAUSES COURT | SUIT IS DISPOSED |
| 1065/1800/2008 | SMALL CAUSES COURT | SUIT DISPOSED OFF AS PER CONSENT TERMS |
| 2085/2149/2008 | SMALL CAUSES COURT | SUIT IS DISPOSED |
| 510/953/2008 | SMALL CAUSES COURT | SUIT IS DISMISSED |
| 193/248/2009 | SMALL CAUSES COURT | SUIT IS DISMISSED |
| 519/963/2008 | SMALL CAUSES COURT | SUIT DISPOSED OFF AS PER CONSENT TERMS |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Mar 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Dec 2022
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - upto 2nd floor.pdf | 26 Dec 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - upto 11th floor.pdf | 26 Dec 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2355227_OC_signed.pdf | 26 Dec 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Meraki Arena.pdf | 26 Dec 2022 |
| Certificates of CA (Form 3)File: RERA - Meraki Arena - form 3 - 1.pdf | 24 Jun 2022 |
| Certificates of CA (Form 3)File: RERA - Meraki Arena - form 3 - 2.pdf | 24 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - FY 2019 2020.pdf | 31 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - FY 2020 2021.pdf | 31 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory - Dec-21_compressed.pdf | 31 Mar 2022 |
| Certificates of CA (Form 3)File: Form 3 Dec 21.pdf | 31 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 - 17-18_compressed.pdf | 31 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - 18-19_compressed.pdf | 31 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 19-20_compressed.pdf | 31 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 20-21_compressed.pdf | 31 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: FurtherCC Park.pdf | 18 Feb 2022 |
| Declaration about Commencement CertificateFile: Declaration for Commencement Certificate - park.pdf | 18 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - SHABRI PARK.pdf | 12 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - PArk.pdf | 12 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 12 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Rera Certificate 31 12 2019.pdf | 25 Dec 2020 |
| Certificates of CA (Form 3)File: Form 3 -31122019.pdf | 25 Dec 2020 |
| Details of encumbrancesFile: RERA Self Declaration - Sabari park.pdf | 6 Dec 2018 |
| Certificates of CA (Form 3)File: Form 3 Sabari Park.pdf | 2 Apr 2018 |
| Building plan approvalFile: sabari park new amended letter.pdf | 31 Mar 2018 |
| Building Plan Approval (IOD)File: sabari park new amended letter.pdf | 31 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Sabari Park CC.pdf | 31 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sabari Park.pdf | 31 Mar 2018 |
| Certificates of CA (Form 3)File: Sabari Pak Sold unsold list.pdf | 31 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sabari Park.pdf | 2 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sabari Park.pdf | 2 Feb 2018 |
| Certificates of CA (Form 3)File: Form 3 Sabari Park.pdf | 2 Feb 2018 |
| Certificates of CA (Form 3)File: sold unsold sabari Park.pdf | 2 Feb 2018 |
| Layout approvalFile: LOM LETTER.PDF | 31 Jul 2017 |
| Layout approvalFile: layout plan.pdf | 31 Jul 2017 |
| Layout approvalFile: LOM PLAN 1.PDF | 31 Jul 2017 |
| Building plan approvalFile: iod copy.pdf | 31 Jul 2017 |
| Layout approvalFile: Amended plan 5 to 8.PDF | 31 Jul 2017 |
| Layout approvalFile: Amended letter.pdf | 31 Jul 2017 |
| Layout approvalFile: Amended plan 1 TO 4.PDF | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LOM LETTER.PDF | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LOM PLAN 1.PDF | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: layout plan.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Amended letter.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Amended plan 1 TO 4.PDF | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Amended plan 5 to 8.PDF | 31 Jul 2017 |
| Building Plan Approval (IOD)File: iod copy.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: park form b.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: Allotmnent and Agreement for Sale.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: Title Report.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Encumbrance Certificate.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: FORM 3 PARK.PDF | 29 Jul 2017 |
| Certificates of CA (Form 3)File: sold unsold list.pdf | 29 Jul 2017 |
| PAN CardFile: SSD pancard.pdf | 28 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 park.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Park.pdf | 28 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SABARI SANGAM WING AP51800001271 | Chembur, Mumbai Suburban | Jul 2017 | Completed | Dec 2018 | Jul 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep MERAKI ARENA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHEMBUR6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 383 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Meraki Habitats LLP
Meraki Habitats LLP has 5 registrations on MahaRERA, including MERAKI ARENA and SABARI SANGAM WING A. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if MERAKI ARENA is delayed beyond 31 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MERAKI ARENA?
The registered promoter entity is Meraki Habitats LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MERAKI ARENA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MERAKI ARENA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MERAKI ARENA?
The professionals named in the filing: Architect: AMIT PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MERAKI ARENA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback