ReraGenieLog inGet a buyer report

Home / Browse projects / MARVEL ZEPHYR BUILDING U

Completed No litigation declared Residential / Group Housing project

MARVEL ZEPHYR BUILDING U

By MARVEL LANDMARKS PVT LTD

RG-MH-21035 · RERA P52100010976 · Last updated on MahaRERA portal: 7 May 2021

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jul 2018Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 20 documents Report an error

MARVEL ZEPHYR BUILDING U is a Residential / Group Housing project by MARVEL LANDMARKS PVT LTD in 411014, registered with MahaRERA as P52100010976 on 31 Aug 2017. The registration is recorded completed; possession was promised by 31 Jul 2018. 2 complaints are on record with the regulator.

At a glance

Project

  • NameMARVEL ZEPHYR BUILDING U
  • TypeResidential / Group Housing
  • Location
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100010976
  • ReraGenie IDRG-MH-21035

Builder

  • NameMARVEL LANDMARKS PVT LTD
  • Entity typeCompany
  • Managing DirectorVISHWAJEET SUBHASH JHAVAR
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017PromisedJul 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion31 Jul 2018
  • Revised completionNone
  • Buildings1 building record
  • Documents filed20 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

U: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 May 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,021 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3180.09
Proposed, not sanctioned2,880 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOREGAON PARK

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL MALWADKAR
EngineerJ+W CONSULTANTS
PartnerRole in project
MARVEL LANDMARKS PVT LTD-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000010419Rhythm HemadeVishwajeet Jhavar15/10/2017
CC12602840Dr Dilip Vitthal SalunkeMARVEL LANDMARKS PVT LTD14/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 May 2021

Documents filed20

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Zephyr Completion Certificate Part 5 F,R,U Dated 31-07-17.pdf7 May 2021
Certificates of Architect (Form 4)File: ZEPHYR U BUILDING (FORM 4).pdf16 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate.pdf13 Apr 2018
OtherFile: Zephyr OC.pdf13 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ZEPHYR U.pdf31 Mar 2018
Declaration in FORM BFile: Affidevit New U Building.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate U Building.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate U Building.pdf31 Jul 2017
Certificates of CA (Form 3)File: C A Certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment and Unit Agreement U Building.pdf31 Jul 2017
Building plan approvalFile: ZEPHYR U BUILDING.pdf30 Jul 2017
Building plan approvalFile: U Building.pdf30 Jul 2017
Layout approvalFile: LAYOUT.pdf30 Jul 2017
PAN CardFile: MLPL PAN.pdf30 Jul 2017
Copy of the legal title reportFile: Title Report.pdf30 Jul 2017
Details of encumbrancesFile: Title Report.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf30 Jul 2017
Building Plan Approval (IOD)File: U Building.pdf30 Jul 2017
Building Plan Approval (IOD)File: ZEPHYR U BUILDING.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf30 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MARVEL ISOLA J BUILDINGP52100001843MOHAMMADWADI, Pune44Jul 2017OngoingDec 2025Registered original: Jun 2021Not delivered
MARVEL ZEPHYRSR NO 66 KHARADI PUNE315-CompletedMar 2016Feb 2016
MARVEL ISOLASR NO 16 MOHAMMADWADI PUNE204-CompletedJun 2015Mar 2015

Keep MARVEL ZEPHYR BUILDING U on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmMARVEL ZEPHYR BUILDING UCompleted 29Lapsed / revoked 12Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: MARVEL LANDMARKS PVT LTD

MARVEL LANDMARKS PVT LTD has 7 registrations on MahaRERA, including MARVEL ISOLA J BUILDING and Marvel Ganga Sangria D,E Building. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if MARVEL ZEPHYR BUILDING U is delayed beyond 31 Jul 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARVEL ZEPHYR BUILDING U?

The registered promoter entity is MARVEL LANDMARKS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARVEL ZEPHYR BUILDING U?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MARVEL ZEPHYR BUILDING U?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MARVEL ZEPHYR BUILDING U?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARVEL ZEPHYR BUILDING U?

The professionals named in the filing: Architect: RAHUL MALWADKAR; Engineer: J+W CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARVEL ZEPHYR BUILDING U?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARVEL ZEPHYR BUILDING U. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARVEL ZEPHYR BUILDING U to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.