Red flags
- 26 complaints at MahaRERA
- Completion date moved by 66 months
- 4 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARVEL ISOLA J BUILDING is a Residential / Group Housing project by MARVEL LANDMARKS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100001843 on 29 Jul 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 66 months from the original filing. 43 of the 44 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 26 complaints are on record with the regulator.
At a glance
Project
- NameMARVEL ISOLA J BUILDING
- TypeResidential / Group Housing
- Location
- HADAPSAR ROAD
- MOHAMMADWADI
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100001843
- ReraGenie IDRG-MH-09302
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Jul 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed188 files
Current status
Figures as on 7 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| J | NA | 26 | 22 | 44 | 0 | 44 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.
J: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 78% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 42% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 58% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 10% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 10% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 20% |
| Energy managemcnt | Yes | 15% |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 35% |
| Aggregate area of recreational Open Space | Yes | 75% |
| Open Parking | No | Not applicable |
Parking filed65
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MARVEL SIGMA HOMES PVT LTD | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| J | NA | Rs 19.82 cr | Rs 18.68 cr |
| - | NA | Rs 6.64 cr | Rs 4.18 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUMIT VERMA |
| Architect | RAHUL MALWADKAR |
| Engineer | Avinash Balkrushna Mate |
| Chartered Accountant | AKSHAY SUNIL KHANDALE |
| Partner | Role in project |
|---|---|
| MARVEL LANDMARKS PVT LTD | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promotera. NCLT petition by ICICI Homes Finance Company Limited against the Promoter (Land Owner) Marvel Sigma Homes Private Limited was admitted and company was under CIRP which impacted client trust wherein we are unable to get 51% consent of allottees but the project is at final i.e. Completion stage and our intention is to offer possession to the allottees. b. Funding from Financer for project was on hold due to NCLT, which resulted in no work on site in that period when Marvel Sigma Homes was under CIRP. c. Therefore for the reasons mentioned hereinabove the Promoter could not complete the remain
Reason as filed by the promoterThe project work is completed nearly around 70%, to complete the remaining construction of the said project we need extension till 31/12/2025.
Reason as filed by the promoterThe project is approximately 75% completed. Construction activities were halted due to the project being under NCLT proceedings. As the matter was sub-judice, work could not be continued. Upon receipt of the NCLT order, construction activities have now been resumed. Therefore, an extension is sought for completion of the project.
Reason as filed by the promoterThe project work is approximately 85% complete. However, to complete the remaining construction work, we require an extension of the project completion date up to 31/12/2026.
Complaints filed with MahaRERA26
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000022187 | Sanjay Sabharwal | Marvel Sigma Homes Pvt. Ltd. | 27/10/2018 |
| CC005000000022208 | Shankar Nadoni | Marvel Sigma Homes Pvt. Ltd. | 31/10/2018 |
| CC005000000022191 | Ram Krishna Chopra | Marvel Sigma Homes Pvt. Ltd. | 27/10/2018 |
| CC005000000022212 | Nirmala Parmar | Marvel Sigma Homes Pvt. Ltd. | 31/10/2018 |
| CC005000000022207 | Rustom Dadachanji | Marvel Sigma Homes Pvt. Ltd | 31/10/2018 |
| CC005000000022189 | Sameer Raikar | Marvel Landmarks Pvt. Ltd. | 27/10/2018 |
| CC005000000022210 | Nirmala Parmar | Marvel Sigma Homes Pvt. Ltd. | 31/10/2018 |
| CC005000000022213 | Ankit Ashok Laungani | Marvel Sigma Homes Pvt. Ltd. | 31/10/2018 |
| CC005000000022216 | Radhakrishna Chetlapalli | Marvel Sigma Homes Pvt. Ltd. | 01/11/2018 |
| CC005000000022209 | Tanjana Sehgal | Marvel Sigma Homes Pvt. Ltd. | 31/10/2018 |
| CC005000000022756 | Mr. Siddhartha M. Palesha | M/s. Gagan Promoters & Developers through its partner Shri. Rahul Garg | 23/03/2019 |
| CC005000000095708 | Mr Allwyn Rocky Fonseca | M/s gagan promoters & Developers, a partnership firm though its partners | 21/06/2021 |
| CC005000000095991 | GURURAJ RAMCHANDRA JOSHI | MARVEL LAND PVT.LTD. | 15/09/2021 |
| CC005000000096130 | Venkatesh Mohan | Marvel Landmarks Private Limited | 21/10/2021 |
| CC005000000106519 | Aanchal M. Moolchandani | Marvel Sigma Homes Pvt. Ltd | 20/01/2022 |
| CC005000000106598 | Mrs. Manju Anirudh Kaul | Marvel Landmarks Private Limited | 15/02/2022 |
| CC005000000117038 | Marvel Sigma Homes Private Limited | Mr. Ankit Ashok Laungani | 29/04/2022 |
| CC005000000117039 | Marvel Sigma Homes Private Limited | Mrs. Nirmala Parmar | 29/04/2022 |
| CC005000000117041 | Marvel Sigma Homes Private Limited | Mr. Jay Nihalani | 29/04/2022 |
| CC005000000117042 | Marvel Sigma Homes Private Limited | Mr. Ram Krishna Chopra | 29/04/2022 |
| CC005000000117043 | Marvel Sigma Homes Private Limited | Mr. Rustom Dadachanji | 29/04/2022 |
| CC005000000117045 | Marvel Sigma Homes Private Limited | Mrs. Tanjana Sehgal | 29/04/2022 |
| CC005000000117046 | Marvel Sigma Homes Private Limited | Mr. Sameer Raikar | 29/04/2022 |
| CC005000000117047 | Marvel Sigma Homes Private Limited | Mr. Sanjay Sabharwal | 29/04/2022 |
| CC005000000117048 | Marvel Sigma Homes Private Limited | Mr. Shankar Nadoni | 29/04/2022 |
| CC005000000117049 | Marvel Sigma Homes Private Limited | Mr. Chettapalli Radhakrishnan | 29/04/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jan 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed188
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 188 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A- 25 26.PDF | 7 Aug 2026 |
| Form 5 (FY 2025-2026)File: Isola_Form-5_FY 25-26.PDF | 7 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June 26.PDF | 15 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 June 26.PDF | 15 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 June 26.PDF | 15 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 June 26.PDF | 15 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 June 26.PDF | 15 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 June 26.PDF | 15 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3_Isola J_Jun-26.PDF | 15 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3_Isola J_Jun-26.PDF | 15 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3_Isola J_Jun-26.PDF | 15 Jul 2026 |
| Withdrawal Update Form 1File: ISOLA FORM 1 MARCH 26.PDF | 1 Jul 2026 |
| Withdrawal Update Form 2File: Isola J Form 2 March 26.PDF | 1 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3_Isola J_Mar-26.PDF | 1 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 DEC 2025.PDF | 30 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 DEC 2025.PDF | 30 Mar 2026 |
| Withdrawal Update Form 3File: Form 3_Isola J_Dec-25.PDF | 30 Mar 2026 |
| Withdrawal Update Form 1File: Form 1- June 25.PDF | 26 Dec 2025 |
| Withdrawal Update Form 1File: Form 1- Sept 25.PDF | 26 Dec 2025 |
| Withdrawal Update Form 2File: Form 2- June 25.PDF | 26 Dec 2025 |
| Withdrawal Update Form 2File: Form 2- June 25.PDF | 26 Dec 2025 |
| Withdrawal Update Form 3File: Form 3_Isola J_Jun-25.PDF | 26 Dec 2025 |
| Withdrawal Update Form 3File: Form 3_Isola J_Jun-25.PDF | 26 Dec 2025 |
| Form 2File: Form 3_Isola J_Dec-2024.PDF | 25 Jun 2025 |
| Form 3File: Inventory Sold Unsold-Dec 2024.pdf | 25 Jun 2025 |
| Disclosure of Sold and Booked Inventory | 25 Jun 2025 |
| Form 1File: Form1-Architect Certificate-March 2025.pdf | 10 Jun 2025 |
| Form 2File: Form 2-Engineer Certificate-March 2025.pdf | 10 Jun 2025 |
| Form 3File: Form 3_Isola J_Mar-2025.PDF | 10 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Sold Unsold-March 2025.pdf | 10 Jun 2025 |
| Form 1File: Form 3_Isola J_Dec-2024.PDF | 4 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Isola 23-2024.pdf | 23 Dec 2024 |
| Declaration in FORM BFile: Form B Isola Extension.pdf | 19 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 17 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3_Isola J_Sep-24 .pdf | 17 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2 Sept 24.pdf | 17 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Sold Unsold- Sept 2024.pdf | 17 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 1- 30 Sept 2024.PDF | 5 Dec 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Sep_2017.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Mar_2018.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Jun_2018.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Sep_2018.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Dec_2018.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Mar_2019.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Jun_2019.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Sep_2019.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Dec_2019.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Mar_2020.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Jun_2020.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Sep_2020.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Dec_2020.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Mar_2021.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Jun_2021.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Sep_2021.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Dec_2021.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Mar_2022.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Jun_2022.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Sep_2022.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Dec_2022.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Mar_2023.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Jun_2023.PDF | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Dec_2023_compressed.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Mar_2024_compressed.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: Isola J Build_Form 3_Sep_2023.PDF | 29 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 Sept 2017.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 Dec 2017.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 Sept 2018.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 Dec 2018.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 March 2019.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 June 2019.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 Sept 2019.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 March 2020.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30June 2020.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30June 2020.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 Sep 2020.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 Dec 2020.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 March 2021.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -30 June 2021.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- 30 sept 2021.PDF | 28 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- 30 Dec 2021.PDF | 28 Nov 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MARVEL ZEPHYR | SR NO 66 KHARADI PUNE | 315 | Completed | Mar 2016 | Feb 2016 |
| MARVEL ISOLA | SR NO 16 MOHAMMADWADI PUNE | 204 | Completed | Jun 2015 | Mar 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 188 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MARVEL ISOLA J BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOHAMMADWADI13,700+ in Pune
Filed coordinates, straight-line distance. 184 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: MARVEL LANDMARKS PVT LTD
MARVEL LANDMARKS PVT LTD has 7 registrations on MahaRERA, including MARVEL ISOLA J BUILDING and Marvel Ganga Sangria D,E Building. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MARVEL ISOLA J BUILDING is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARVEL ISOLA J BUILDING?
The registered promoter entity is MARVEL LANDMARKS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARVEL ISOLA J BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MARVEL ISOLA J BUILDING?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MARVEL ISOLA J BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARVEL ISOLA J BUILDING?
The professionals named in the filing: Architect: SUMIT VERMA; Architect: RAHUL MALWADKAR; Engineer: Avinash Balkrushna Mate; Chartered Accountant: AKSHAY SUNIL KHANDALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARVEL ISOLA J BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback