Home / Browse projects / Pune, Maharashtra / MANSHA PHASE-II

Registered No litigation declared Residential / Group Housing project

MANSHA PHASE-II

By M/S MANGAL SHANTI DEVELOPEMENT

RG-MH-15318 · RERA P52100028315 · Last updated on MahaRERA portal: 27 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 24 months from the original
6 of 11Construction stages donefurthest along: Staircases, 98%
11 of 78Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

MANSHA PHASE-II is a Residential / Group Housing project by M/S MANGAL SHANTI DEVELOPEMENT in Pune, Maharashtra, registered with MahaRERA as P52100028315 on 18 Feb 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 24 months from the original filing. 67 of the 78 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMANSHA PHASE-II
  • TypeResidential / Group Housing
  • Location
    • Opp Wagheshwar Temple
    • Near Shankar Parvati Karyalay
    • PMC
    • Wagholi Pune
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100028315
  • ReraGenie IDRG-MH-15318

Builder

  • NameM/S MANGAL SHANTI DEVELOPEMENT
  • Entity typePartnership
  • PartnersUTTAMCHAND MOHANLAL BATHIYA, ASHOK SOHANLAL GUNDECHA, SAURABH LALIT GUNDECHA, SIDDHANT HIRACHAND GUNDECHA, MAHAVIR MOHANLAL BATHIYA, ROSHAN RAJENDRA BATHIYA
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2021First promiseJun 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Feb 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed109 files

Current status

86%67 of 78 units booked
100.0%Work done, per cost certificate

Figures as on 27 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C-BUILDING MANSHANA151570878

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.

C-BUILDING MANSHA: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes60%
Street LightingYes80%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered70

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area890 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 May 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority
Permissible FSI5552.67
Proposed, not sanctioned2,753 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSadashiv Peth , Tilak Road Pune
Estimated costRs 20.75 cr
Cost incurredRs 20.75 cr
Work done100.0%
BuildingWingEstimatedIncurred
C-BUILDING MANSHANARs 17.37 crRs 17.37 cr
-NARs 3.38 crRs 3.38 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMrJay Aeram
EngineerCHETA BATHIYA
Chartered AccountantYOGESH PODDAR
Chartered AccountantA N J K & CO LLP
PartnerRole in project
M/S MANGAL SHANTI DEVELOPEMENT-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024792Jun 2025 → Jun 2026

Reason as filed by the promoterWe apply for extension of the following project MANSHA PHASE-II registered with the regulatory authority vide project registration certificate bearing no. P52100028315 which expired on 30/06/2025. We request you to grant extension of RERA Registration for a further period of 12 months i.e. upto 30/06/2026.

EA17062621404Jun 2025 → Jun 2027

Reason as filed by the promoterWe hereby request an extension of the project timeline under RERA due to unforeseen delays caused by a shortage of both skilled labour and essential construction materials. Over the past few months, our project has faced significant disruptions in workforce availability, which has slowed down on-site progress of the building. Additionally, the supply chain for critical raw materials such as cement and steel has been inconsistent, leading to delays in procurement and execution of key construction activities.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602253Ankit Prakash SonarM/S MANGAL SHANTI DEVELOPEMENT17/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 Architect cert signed - June 2026-signed.pdf27 Jul 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 June 2026-signed.pdf27 Jul 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 June 2026-signed.pdf27 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf27 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf27 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - December 2025.pdf7 May 2026
Withdrawal Update Form 1File: form 1 Architect cert signed - March 2026.pdf7 May 2026
Withdrawal Update Form 2File: form 2 Engineer cert signed - Dec 2025.pdf7 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 - March 2026 - Signed.pdf7 May 2026
Withdrawal Update Form 3File: form 3 CA certificate signed - Dec 2025.pdf7 May 2026
Withdrawal Update Form 3File: CA CERTIFICATE Form3 March 2026-signed.pdf7 May 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - June 2025.pdf20 Nov 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate - September 2025.pdf20 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate - June 2025.pdf20 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate - September 2025.pdf20 Nov 2025
Withdrawal Update Form 3File: CA Certificate June 2025.pdf20 Nov 2025
Withdrawal Update Form 3File: CA Certificate September 2025.pdf20 Nov 2025
Form 5 (FY 2024-2025)File: CA Form 5 2024-25 Mansha Phase II - Sign.pdf25 Oct 2025
Form 1File: Form 1 Architect Certificate - March 2025 - Sign.pdf13 Jun 2025
Form 2File: Form 2 Engineer Certificate - March 2025 - Sign.pdf13 Jun 2025
Form 3File: CA Certificate March 2025 - Sign.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - March 2025.pdf13 Jun 2025
Self-declaration of Quarterly ProgressFile: RERA self declaration of QPR.pdf13 Jun 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate - March 2025 - Sign.pdf9 Jun 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate - March 2025 - Sign.pdf9 Jun 2025
Withdrawal Update Form 3File: CA Certificate March 2025 - Sign.pdf9 Jun 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate - March 2025 - Sign.pdf7 Jun 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate - March 2025 - Sign.pdf7 Jun 2025
Withdrawal Update Form 3File: CA Certificate March 2025 - Sign.pdf7 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate December 2024_Signed.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Architect Certificate - December 2024.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Engineer Certificate - December 2024.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - December 2024.pdf23 Jan 2025
Declaration about Commencement CertificateFile: CC Declaration.pdf31 Dec 2024
Layout approvalFile: Layout Approvaal_11zon.pdf30 Dec 2024
Building plan approvalFile: Building Plan_11zon.pdf30 Dec 2024
Copy of Layout Approval (in case of layout)File: Layout Approvaal_11zon.pdf30 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_11zon.pdf30 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_11zon.pdf30 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance certificate with Finance and Legal.pdf29 Nov 2024
Details of encumbrancesFile: Encumbrance certificate with Finance and Legal.pdf29 Nov 2024
CERSAI detailsFile: CERSAI Declaration.pdf29 Nov 2024
Details of encumbrances concerned to LegalFile: Encumbrance certificate with Finance and Legal.pdf29 Nov 2024
Other - TechnicalFile: Plinth Certificate.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5 2023-24 Mansha Phase II signed.pdf13 Nov 2024
Declaration in FORM BFile: Form B -Declaration by Promoter.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - Sept 2024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate September 2024 - Sign.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Sept 2024.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2024.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate 2023-24.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - June 2024.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 2024 Signed.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: scan architect cert.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: scan form2.pdf13 Apr 2024
Disclosure of sold/ booked inventoryFile: scan disclosure inventory.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: scan-ca certificate.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate December 2023 Signed.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf28 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf28 Oct 2023
Disclosure of sold/ booked inventoryFile: inventory disclosure.pdf28 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate scan.pdf28 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Mangal Shanti Development Corporation.pdf29 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf20 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf1 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf1 Jun 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf1 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf1 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Form 3.pdf1 Jun 2023
Other - FinanceFile: SBI Bank Accounts.pdf14 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Form 2A March 22.pdf24 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 FY 21-22.pdf24 Nov 2022
Layout approvalFile: Layout Plan marked.PDF3 Aug 2022
Copy of Layout Approval (in case of layout)File: Layout Plan marked.PDF3 Aug 2022
Layout approvalFile: Layout Plan.PDF21 Jul 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mangal MahalaxmiP52800014983Mahalaxmi Che Maal, Ratnagiri130Jan 2018OngoingDec 2025Registered original: Nov 2021Not delivered
Mangal KalashP52800032039Jogale, Ratnagiri23Dec 2021OngoingJun 2025Registered original: Jun 2023Not delivered
MANSHAMANSHA190-CompletedFeb 2016Late, Aug 2016

How this compares with Pune

86%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANSHA PHASE-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi Pune13,700+ in Pune

2 kmMANSHA PHASE-IICompleted 116Lapsed / revoked 117Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: M/S MANGAL SHANTI DEVELOPEMENT

M/S MANGAL SHANTI DEVELOPEMENT has 1 registration on MahaRERA, including MANSHA PHASE-II. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANSHA PHASE-II is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANSHA PHASE-II?

The registered promoter entity is M/S MANGAL SHANTI DEVELOPEMENT, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANSHA PHASE-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MANSHA PHASE-II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MANSHA PHASE-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANSHA PHASE-II?

The professionals named in the filing: Architect: MrJay Aeram; Engineer: CHETA BATHIYA; Chartered Accountant: YOGESH PODDAR; Chartered Accountant: A N J K & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANSHA PHASE-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANSHA PHASE-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANSHA PHASE-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.