Mamurdi MHADA North
By Godrej Skyline Developers Limited
RG-MH-15371 · RERA P52100024142 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 8 complaints at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mamurdi MHADA North is a Residential / Group Housing project by Godrej Skyline Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100024142 on 21 Jan 2020. Possession is promised by 30 Mar 2027. The completion date has moved by 36 months from the original filing. 203 of the 205 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 8 complaints are on record with the regulator.
At a glance
Project
- NameMamurdi MHADA North
- TypeResidential / Group Housing
- Location
- SERVICE ROAD TO PUNE MUMBAI EXPRESSWAY
- MAMURDI VILLAGE
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100024142
- ReraGenie IDRG-MH-15371
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Jan 2020
- Promised completion30 Mar 2027
- Revised completionRevised to 30 Mar 2027 (originally 30 Mar 2024)
- Buildings1 building record
- Documents filed152 files
Current status
Figures as on 24 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER 1 | NA | 19 | 17 | 205 | 0 | 205 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 92%.
TOWER 1: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 86% |
| Sanitary Fittings within the flats / premises | 81% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 92% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 53% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 70% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 85% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed103
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | STUDIO THIRTY ARCHITECT AND PLANNERS |
| Engineer | BRICKLANE |
| Chartered Accountant | MD DESHPANDE AND CO |
| Chartered Accountant | B S R & Co. LLP |
| Partner | Role in project |
|---|---|
| Godrej Skyline Developers Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterExtension be granted for the project Mamurdi MHADA North from 1st April 2024 to 30th March 2025 for the reasons mentioned in the project.
Reason as filed by the promoterWe are applying for the project extension under Section 7(3) and as per Order No. 40 for the reasons more particularly described in the uploaded application and declaration.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 593/2023 | Joint CJSD AND Additional CJM Pune | PENDING |
| 758/2023 | Joint CJSD AND Additional CJM Pune | PENDING |
Complaints filed with MahaRERA8
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000177886 | Mandar Mukund Gawade | Godrej Skyline Developers Private Limited | 04/12/2022 |
| CC005000000290008 | Prabhakar Pandurang More | Godrej Skyline Developers Pvt. Ltd. | 09/01/2024 |
| CC12503502 | Jeevan Shinde | Godrej Skyline Developers Limited | 01/10/2025 |
| CC12601931 | aravind Lalaso Gayakwad | Godrej Skyline Developers Limited | 01/04/2026 |
| CC12601930 | Shripati Ramchandra Kadam | Godrej Skyline Developers Limited | 01/04/2026 |
| CC12601927 | Umesh Abhimanyu kadam | Godrej Skyline Developers Limited | 01/04/2026 |
| CC12601929 | Kiran Gangadhar Lokare | Godrej Skyline Developers Limited | 01/04/2026 |
| CC12601928 | Deepali sudhakar Bade | Godrej Skyline Developers Limited | 01/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Dec 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Mar 2027
Documents filed152
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 152 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect Certificate NEWS Q4FY26.pdf | 24 Apr 2026 |
| Form 2File: Eng_certificate_MHADA North.pdf | 24 Apr 2026 |
| Form 3File: Godrej Mamurdi North March 2026.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Godrej Mamurdi North March 2026.pdf | 24 Apr 2026 |
| Form 1File: Architect Certificate NEWS Q3FY26.pdf | 24 Jan 2026 |
| Form 2File: Engineer Certificate EWS N Q3FY26.pdf | 24 Jan 2026 |
| Form 3File: Godrej Mamurdi North December 2025 Signed.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Mamurdi Mhada North (2).pdf | 24 Jan 2026 |
| Form 1File: Sep 25 Architect Certificate N EWS.pdf | 20 Oct 2025 |
| Form 2File: Engineers Certificare Mhada Mamurdi.pdf | 20 Oct 2025 |
| Form 3File: CA Cert Godrej Mamurdi North September 2025.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Mamurdi Mhada North (1).pdf | 20 Oct 2025 |
| Form 5 (FY 2024-2025)File: MHADA Form 5_compressed.pdf | 26 Sep 2025 |
| Form 1File: Architect Certificate MHADA North.pdf | 20 Jul 2025 |
| Form 2File: Annexure B Mamurdi Mhada North.pdf | 20 Jul 2025 |
| Form 3File: CA Certificate Godrej Mamurdi MHADA North June2025.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Mamurdi Mhada North (1).pdf | 20 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MAHADA.pdf | 1 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate N EWS.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Mamurdi MHADA North CA Cert.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B mamurdi Madha North.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Mamurdi Mhada North.pdf | 20 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate EWS North.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate of Percentatge of completion of work Mhada North.pdf | 8 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate of CA Mhada North.pdf | 8 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate on cost incurred on project Mhada North.pdf | 8 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Inv Disclosure Mhada N Compressed.pdf | 8 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer Certificate of quality assurance Mhada North.pdf | 8 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Audit Report of Satutory Mhada North Compressed.pdf | 8 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate N EWS.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mhada North.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MHADA North.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Mamurdi Mhada North.pdf | 20 Jan 2025 |
| CERSAI detailsFile: CERSAI Latest.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MHADA North Form 3.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mhada.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MHADA North.PDF | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mhada.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Mamurdi Mhada North.pdf | 15 Oct 2024 |
| CERSAI detailsFile: CERSAI.pdf | 15 Oct 2024 |
| PAN CardFile: Pan Card New.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MHADA Form5_compressed.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mamurdi MHADA North.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mamurdi MHADA.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Mamurdi Mhada North.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_ Godrej Mamurdi North_June_24 (Signed).pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Mamurdi Mhada North March,2024.pdf | 16 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Certificate Mhada North March,2024.pdf | 16 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: April 24_Disclosure of Sold-Mamurdi Mhada North signed.pdf | 16 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_ Godrej Mamurdi North_Mar_24 ( Signed ).pdf | 16 Apr 2024 |
| Layout approvalFile: GSDPL North Layout_compressed.pdf | 1 Apr 2024 |
| Building plan approvalFile: EWS Typical Floor_compressed.pdf | 1 Apr 2024 |
| Building plan approvalFile: EWS 7th 11th Floor_compressed.pdf | 1 Apr 2024 |
| Building plan approvalFile: EWS Section_compressed.pdf | 1 Apr 2024 |
| Building plan approvalFile: GSDPL North Layout_compressed.pdf | 1 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: GSDPL North Layout_compressed.pdf | 1 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: EWS Typical Floor_compressed.pdf | 1 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: EWS 7th 11th Floor_compressed.pdf | 1 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: EWS Section_compressed.pdf | 1 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: GSDPL North Layout_compressed.pdf | 1 Apr 2024 |
| Declaration about Commencement CertificateFile: 3630_001.pdf | 1 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Ranjan.pdf | 26 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Subhasish V4 Signed and Stamped.pdf | 26 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank account.pdf | 23 Mar 2024 |
| Declaration in FORM BFile: Form B_compressed (1).pdf | 19 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Mhada North_compressed.pdf | 19 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) (1).pdf | 18 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mhada North - Architect's Certificate.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mhada North - Enggineer's Certificate.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Mamurdi MHADA North_Dec 23.pdf | 12 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mamurdi MHADA North _Dec23 Signed.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mamurdi Mhada North - Architects Certificate.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mamurdi Mhada North Engg Certificate.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Mamurdi MHADA North Sept23.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_RERA_Mamurdi_Sept_Signed.PDF | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Skyline - Mamurdi MHADA North (1).pdf | 28 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Mhada North.pdf | 20 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Mhada North.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Mamurdi MHADA North_Jul-23.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_ Godrej Mamurdi North_June-23-Signed.pdf | 20 Jul 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Godrej Park GreensP52100019639 | Mamurdi, Pune | 1,210 | Feb 2019 | Ongoing | Mar 2028Registered original: Mar 2024 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 152 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mamurdi MHADA North on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAMURDI VILLAGE13,700+ in Pune
Filed coordinates, straight-line distance. 92 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: Godrej Skyline Developers Limited
Godrej Skyline Developers Limited has 8 registrations on MahaRERA, including Godrej Park Greens and Godrej Nurture. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Mamurdi MHADA North is delayed beyond 30 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mamurdi MHADA North?
The registered promoter entity is Godrej Skyline Developers Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mamurdi MHADA North?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Mamurdi MHADA North?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Mamurdi MHADA North?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mamurdi MHADA North?
The professionals named in the filing: Architect: STUDIO THIRTY ARCHITECT AND PLANNERS; Engineer: BRICKLANE; Chartered Accountant: MD DESHPANDE AND CO; Chartered Accountant: B S R & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mamurdi MHADA North?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback