ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / MAHESHWARAM VRINDA PHASE-1

Registered No litigation declared Others project

MAHESHWARAM VRINDA PHASE-1

By MAHESHWARAM ASSOCIATES

RG-MH-23623 · RERA P52100078935 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
1 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 75%
137 of 143Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

MAHESHWARAM VRINDA PHASE-1 is a Others project by MAHESHWARAM ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100078935 on 21 Jan 2025. Possession is promised by 31 Dec 2030. 6 of the 143 units on this registration are recorded sold or booked, and 1 of 22 construction stages are filed complete.

At a glance

Project

  • NameMAHESHWARAM VRINDA PHASE-1
  • TypeOthers
  • Location
    • NEAR ISKCON TEMPLE
    • RAVET
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100078935
  • ReraGenie IDRG-MH-23623

Builder

  • NameMAHESHWARAM ASSOCIATES
  • Entity typePartnership
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Jan 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed87 files

Current status

4%6 of 143 units booked
4.3%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B-WINGNA51808
A-WINGNA191611718135

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 75%.

B-WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A-WING24%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor0%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed108

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots108
Closed/Covered58
Open Space50
BuildingClosed/CoveredOpen SpaceTotal
B-WING482270
A-WING102838

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,900 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jan 2026
LandownerVillageDistrict
JANABAI BALU BHONDAVERavetPune
SAKHARAM VITHAL BHONDAVERavetPune
PRIYA CHANDRAKANT BHONDAVERavetPune
UJWALA PANKAJ GAWARERavetPune
CHANDRAKANT SAKHARAM BHONDAVERavetPune
SHREYA HRSHIKESH BHONDAVERavetPune
HRSHIKESH SAKHARAM BHONDAVERavetPune
BAYADABAI SAKHARAM BHONDAVERavetPune
PRAVIN SHIVAJI BHONDVERavetPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI37759.33
Proposed, not sanctioned13,465 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO-1, SECTOR NO-27-A, PIMPRI CHINCHWAD NEW TOWN DEVELOPMENT AUTHORITY, NIGDI, PUNE -411044
Estimated costRs 103.33 cr
Cost incurredRs 4.50 cr
Work done4.35%
BuildingWingEstimatedIncurred
A-WINGNARs 48.72 crRs 2.86 cr
B-WINGNARs 47.95 crRs 1.64 cr
-NARs 6.67 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHEKHAR NAHAR NAHAR
EngineerPRAYAG SANTOSH SATHE SANTOSH SATHE
EngineerSHASHIKANT SHETTY
Chartered AccountantVAISHALI R GOLE ROHIDAS GOLE
Chartered AccountantSUN SVG & ASSOCIATES
PartnerRole in project
MAHESHWARAM ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: CC.pdf11 May 2026
Building plan approvalFile: imgw-304090125_compressed.pdf11 May 2026
Building plan approvalFile: imgw-304090209_compressed.pdf11 May 2026
Building plan approvalFile: imgw-304090248_compressed.pdf11 May 2026
Building plan approval or NA orderFile: imgw-304090341_compressed.pdf11 May 2026
Building plan approvalFile: imgw-304090432_compressed.pdf11 May 2026
Building plan approvalFile: imgw-304090517_compressed.pdf11 May 2026
Building plan approvalFile: imgw-304090623_compressed.pdf11 May 2026
Building plan approvalFile: imgw-304090722_compressed.pdf11 May 2026
Building plan approvalFile: imgw-304090815_compressed.pdf11 May 2026
Building plan approvalFile: imgw-304090854_compressed.pdf11 May 2026
Withdrawal Update Form 1File: FORM NO 1 25-26 Q4.pdf11 May 2026
Withdrawal Update Form 2File: FORM NO 2 25-26 Q4.pdf11 May 2026
Withdrawal Update Form 3File: FORM NO 3 25-26 Q4_compressed.pdf11 May 2026
Commencement certificateFile: 20260304011602.pdf25 Mar 2026
Layout approvalFile: imgw-304090125_compressed.pdf25 Mar 2026
Building plan approvalFile: imgw-304090209_compressed.pdf25 Mar 2026
Building plan approvalFile: imgw-304090248_compressed.pdf25 Mar 2026
Building plan approvalFile: imgw-304090341_compressed.pdf25 Mar 2026
Building plan approvalFile: imgw-304090248.pdf25 Mar 2026
Building plan approvalFile: imgw-304090209.pdf25 Mar 2026
Building plan approvalFile: imgw-304090432_compressed.pdf25 Mar 2026
Building plan approvalFile: imgw-304090517_compressed.pdf25 Mar 2026
Building plan approvalFile: imgw-304090623_compressed.pdf25 Mar 2026
Building plan approvalFile: imgw-304090722_compressed.pdf25 Mar 2026
Building plan approvalFile: imgw-304090722_compressed.pdf25 Mar 2026
Building plan approvalFile: imgw-304090815_compressed.pdf25 Mar 2026
Building plan approvalFile: imgw-304090854_compressed.pdf25 Mar 2026
Withdrawal Update Form 1File: Form no 1 Architech.pdf25 Mar 2026
Withdrawal Update Form 2File: Form No 2 Engineer.pdf25 Mar 2026
Withdrawal Update Form 3File: Form No 3 Ca.pdf25 Mar 2026
Withdrawal Update Form 1File: form 1 vrinda Arch 25-26 Q1.pdf17 Jan 2026
Withdrawal Update Form 1File: form 1 vrinda Arch 25-26 Q1.pdf17 Jan 2026
Withdrawal Update Form 1File: Form No 1 vrinda 25-26 Q2 OK.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2 Virnda ENG 25-26 Q1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2 Virnda ENG 25-26 Q1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form No 2 Virnda ENG 25-26 Q2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 Vrinda CA Certificate 25-26 Q1.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 Vrinda CA Certificate 25-26 Q1.pdf17 Jan 2026
Withdrawal Update Form 3File: Form No 3 Vrinda CA Certificate Q2.pdf17 Jan 2026
Form 1File: Form no 1_compressed.pdf7 Jul 2025
Form 2File: Form No 2_compressed.pdf7 Jul 2025
Form 3File: Form no 3.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: VRINDA SOLD UNSOLD INVENTORY.pdf7 Jul 2025
Other - TechnicalFile: Annexure A.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcthech certifiacte_page-0001.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate 3.pdf24 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMATE A_page-0001.pdf11 Dec 2024
Other - FinanceFile: LAND COST NIL_DA_merged.pdf11 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMATE B_page-0001.pdf11 Dec 2024
Other - FinanceFile: Self-declaration by land owner_New.pdf9 Dec 2024
Proforma of Allotment letterFile: Allotment letter.pdf18 Nov 2024
Other - TechnicalFile: CC SEND TO MAIL ID.pdf18 Nov 2024
Proforma of Agreement for saleFile: FINAL DRAFT AGREEMENT.pdf18 Nov 2024
Copy of the legal title reportFile: Search Report New as per Rera_compressed.pdf23 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Gmail- CC Verification for RERA Application No- REA52100164960.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_compressed (1).pdf9 Oct 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE FINANCE.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE.pdf8 Oct 2024
Declaration in FORM BFile: FORM B_BUILDERS New_compressed.pdf8 Oct 2024
Declaration about Commencement CertificateFile: DECLARATION OF CC.pdf8 Oct 2024
CERSAI detailsFile: CERSAI REPORT.pdf8 Oct 2024
Deviation Report with respect to Allotment letterFile: DEVIATION FOR ALLOTEMENT LETTER.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE FINANCE.pdf8 Oct 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION FOR DRAFT AGREEMENT.pdf8 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOURE OF SECURED OR UNSECURED LOAN.pdf8 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSER LETTER.pdf9 Jul 2024
Building plan approvalFile: PARKING FLOOR PLAN.pdf25 Jun 2024
Building plan approvalFile: B-WING 1ST FLOOR PLAN.pdf25 Jun 2024
Building plan approvalFile: BASEMENT FLOOR PLAN.pdf25 Jun 2024
Building plan approvalFile: A-WING 3RD FLOOR PLAN.pdf25 Jun 2024
Building plan approvalFile: A-WING 1ST 2ND FLOOR PLAN.pdf25 Jun 2024
Building plan approvalFile: A-WING TYPICAL FLOOR PLAN.pdf25 Jun 2024
Building plan approvalFile: A-WING ELEVATION.pdf25 Jun 2024
Layout approvalFile: LAYOUT PLAN Compresed.pdf25 Jun 2024
PAN CardFile: Frim Pan Card.pdf25 Jun 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN Compresed.pdf25 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf25 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order_compressed.pdf25 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MAHESHWARAM MAJESTICP52100032195SHINDE WASTI, Pune18Dec 2021Certificate SignedDec 2025Mar 2025

How this compares with Pune

4%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHESHWARAM VRINDA PHASE-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVET13,700+ in Pune

Builder: MAHESHWARAM ASSOCIATES

MAHESHWARAM ASSOCIATES has 3 registrations on MahaRERA, including MAHESHWARAM SPRINT and MAHESHWARAM MAJESTIC. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MAHESHWARAM VRINDA PHASE-1 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHESHWARAM VRINDA PHASE-1?

The registered promoter entity is MAHESHWARAM ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHESHWARAM VRINDA PHASE-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAHESHWARAM VRINDA PHASE-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHESHWARAM VRINDA PHASE-1?

The professionals named in the filing: Architect: SHEKHAR NAHAR NAHAR; Engineer: PRAYAG SANTOSH SATHE SANTOSH SATHE; Engineer: SHASHIKANT SHETTY; Chartered Accountant: VAISHALI R GOLE ROHIDAS GOLE; Chartered Accountant: SUN SVG & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHESHWARAM VRINDA PHASE-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHESHWARAM VRINDA PHASE-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHESHWARAM VRINDA PHASE-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.