Registration lapsed Litigation declared Residential / Group Housing project

MAHESHWARAM MAJESTIC

By MAHESHWARAM ASSOCIATES

RG-MH-22745 · RERA P52100032195 · Last updated on MahaRERA portal: 8 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
2 of 11Construction stages donefurthest along: Basement (if any), 95%
63 of 126Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

MAHESHWARAM MAJESTIC is a Residential / Group Housing project by MAHESHWARAM ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100032195 on 14 Dec 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 63 of the 126 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMAHESHWARAM MAJESTIC
  • TypeResidential / Group Housing
  • Location
    • SHIV CHATRAPATI CHOWK
    • SHINDE WASTI
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100032195
  • ReraGenie IDRG-MH-22745

Builder

  • NameMAHESHWARAM ASSOCIATES
  • Entity typePartnership
  • PartnersSHIVAJI VITTHAL BHONDAVE, PRAVIN SHIVAJI BHONDAVE
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

4 months past promisethis monthRegisteredDec 2021First promiseDec 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Dec 2021
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed78 files

Current status

50%63 of 126 units booked
53.3%Work done, per cost certificate

Figures as on 8 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PHASE INA18181260126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.

PHASE I: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)0%
Plinth95%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered45
Open Space18

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Aug 2025
LandownerVillageDistrict
TRUPTI SAMEER DAREKARLonavala (M Cl)Pune
POOJA KUNAL KUMBHARMumbai CityMumbai City
SHRUTI SAMEER WADEKARPimpri Chinchawad (M Corp.)Pune
SHITAL SAMEER PASHANKARPune (M Corp.)Pune
KALPANA RAJENDRA BHIGWANKARPimpri Chinchawad (M Corp.)Pune
SHRIKANT RAJENDRA BHIGWANKARPimpri Chinchawad (M Corp.)Pune
SHASHANKA SHRIKANT BHIGWANKARPimpri Chinchawad (M Corp.)Pune
ANIL RAMCHANDRA BHIGWANKARPimpri Chinchawad (M Corp.)Pune
KANCHAN ANIL BHIGWANKARPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPCMC PUNE
Permissible FSI12000.0
Proposed, not sanctioned7,473 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAVET PUNE 412101
Estimated costRs 31.90 cr
Cost incurredRs 17.01 cr
Work done53.33%
BuildingWingEstimatedIncurred
PHASE INARs 30.45 crRs 15.81 cr
-NARs 1.45 crRs 1.21 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR VISHAL N BAFNA
EngineerMR SUHAS TAKARE
EngineerShashikant Shetty
Chartered AccountantVAISHALI R GOLE
Chartered AccountantSUN SNG AND ASSOCIATES
PartnerRole in project
MAHESHWARAM ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05112518241Dec 2025 → Jun 2026

Reason as filed by the promoterWe have completed 100% of the construction work. Only project-related paperwork such as NOCs, OC, etc., is pending. The said paperwork will be completed before 30th June 2026.

Litigation declared2

CaseCourtStatus
1111/2023/2023CIVIL COURT PUNEClosed
1149/2024/2024CIVIL COURT PUNEOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000290061DAULAT BHONDVEMaheshwaram Associates09/01/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: Form No 5 23-24.pdf8 Jan 2026
Form 5 (FY 2024-2025)File: Form No 5 24-25.pdf8 Jan 2026
Withdrawal Update Form 1File: MAJESTIC Form no 1 25-26 Q2_ Final.pdf5 Nov 2025
Withdrawal Update Form 2File: Majestic ENG 25-26 q2 Form2 Final.pdf5 Nov 2025
Withdrawal Update Form 3File: Form 3 CA Certificate Q2 25-26 MAJESTIC final.pdf5 Nov 2025
Withdrawal Update Form 1File: Majestic Form No 1 24-25 Q1.pdf25 Oct 2025
Withdrawal Update Form 2File: Majestic ENG 25-26 q1 Form2.pdf25 Oct 2025
Withdrawal Update Form 3File: Majestic Form 3 CA Certificate 25-26 Q1.pdf25 Oct 2025
Form 1File: Form no 1_compressed.pdf9 Jul 2025
Form 2File: Form no 2 Magestic Q3.pdf9 Jul 2025
Form 3File: Form No 3 Q3_page-0001.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Magestic Q3.pdf9 Jul 2025
Form 1File: Form no 1_compressed.pdf9 Jul 2025
Form 2File: Form no 2 2024-25 Q4 magestic.pdf9 Jul 2025
Form 3File: form no 3 Q4_page-0001.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Magestic sold unsold inventory q4.pdf9 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH MAJESTIC 23-24 Q4_compressed.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH MAJESTIC 24-25 Q1_compressed.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH MAJESTIC 24-25 Q2_compressed.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q3_compressed (1).pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert 23-24 Q4_compressed.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert 24-25 Q1_compressed.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert 24-25 Q2_compressed.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert 23-24 Q4_compressed.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert 24-25 Q1_compressed.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CA Cert 24-25 Q2_compressed.pdf24 Dec 2024
Layout approvalFile: 1 SANCTION PLAN_compressed.pdf12 Aug 2024
Building plan approvalFile: 2 ELEVATION_compressed.pdf12 Aug 2024
Building plan approvalFile: PARKING TYPICAL FLR PLAN.pdf12 Aug 2024
Building plan approvalFile: 8TH 13TH FLR REFUSE PLAN.pdf12 Aug 2024
Copy of Layout Approval (in case of layout)File: 1 SANCTION PLAN_compressed.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 ELEVATION_compressed.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: PARKING TYPICAL FLR PLAN.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 8TH 13TH FLR REFUSE PLAN.pdf12 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter_compressed.pdf12 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Maheshwaram Majestic Form 5 Final.pdf30 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE-Q4.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE-Q1.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE-Q2.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE Q3.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Q4.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Q1.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Q2.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Q3.pdf8 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 1_page-0001.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q2.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q3_compressed (1).pdf8 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FINAL REPORT MAHESHWARAM MAGISTIC.pdf9 Mar 2023
Copy of the legal title reportFile: MAHESHWRAM MAJESTIC FORM A.pdf3 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: commencement.pdf30 Nov 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT.pdf30 Nov 2021
Declaration in FORM BFile: BUILDER FORM NO B.pdf30 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf30 Nov 2021
CERSAI detailsFile: CERSAI.pdf30 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf30 Nov 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf30 Nov 2021
Proforma of Allotment letterFile: Maheshwaram Majestic - Ravet Rera draft.pdf30 Nov 2021
OtherFile: DEATH CERTIFICATE .pdf30 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work.pdf24 Nov 2021
Layout approvalFile: Layout Plan copy 3.PDF21 Nov 2021
Building plan approvalFile: NA.pdf21 Nov 2021
Building plan approvalFile: Plan copy 1.PDF21 Nov 2021
Building plan approvalFile: Plan copy 2.PDF21 Nov 2021
Building plan approvalFile: Plan copy 4.PDF21 Nov 2021
Building plan approvalFile: Plan Copy 5.PDF21 Nov 2021
PAN CardFile: FIRM PAN.pdf21 Nov 2021
Copy of the legal title reportFile: Surch tital report 13 1 3.pdf21 Nov 2021
Copy of the legal title reportFile: Surch tital report 139 2 2 5 AND 139 2 2 2 6 1.pdf21 Nov 2021
Details of encumbrancesFile: Encumbrances Letter.pdf21 Nov 2021
Copy of Layout Approval (in case of layout)File: Layout Plan copy 3.PDF21 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: NA.pdf21 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan copy 1.PDF21 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan copy 2.PDF21 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan copy 4.PDF21 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan Copy 5.PDF21 Nov 2021
OtherFile: Index 2_compressed.pdf21 Nov 2021

How this compares with Pune

50%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHESHWARAM MAJESTIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHINDE WASTI13,700+ in Pune

Builder: MAHESHWARAM ASSOCIATES

MAHESHWARAM ASSOCIATES has 3 registrations on MahaRERA, including MAHESHWARAM SPRINT and MAHESHWARAM MAJESTIC. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that MAHESHWARAM MAJESTIC shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MAHESHWARAM MAJESTIC is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHESHWARAM MAJESTIC?

The registered promoter entity is MAHESHWARAM ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHESHWARAM MAJESTIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAHESHWARAM MAJESTIC?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MAHESHWARAM MAJESTIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHESHWARAM MAJESTIC?

The professionals named in the filing: Architect: MR VISHAL N BAFNA; Engineer: MR SUHAS TAKARE; Engineer: Shashikant Shetty; Chartered Accountant: VAISHALI R GOLE; Chartered Accountant: SUN SNG AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHESHWARAM MAJESTIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHESHWARAM MAJESTIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHESHWARAM MAJESTIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.