MADHUBAN
By Godrej Skyline Developers Limited
RG-MH-16890 · RERA P52100045236 · Last updated on MahaRERA portal: 19 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
- Rs 250.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MADHUBAN is a Residential / Group Housing project by Godrej Skyline Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100045236 on 10 May 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 12 months from the original filing. 142 of the 324 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameMADHUBAN
- TypeResidential / Group Housing
- Location
- SERVICE ROAD TO PUNE MUMBAI EXPRESSWAY
- VILLAGE MAMURDI
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045236
- ReraGenie IDRG-MH-16890
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 May 2022
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 30 Sep 2025)
- Buildings1 building record
- Documents filed95 files
Current status
Figures as on 19 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| EWS Tower | NA | 22 | 21 | 324 | 0 | 324 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 87%.
EWS Tower: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 87% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 69% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 61% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 19 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 30% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 10% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 10% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed162
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| EWS Tower | NA | Rs 75 | Rs 50 |
| - | NA | Rs 2 | Rs 1 |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Architecture Collective |
| Engineer | Facilities And Building Solutions Pvt. Ltd. (FABS) |
| Engineer | ANIL POWAR |
| Chartered Accountant | M D Deshpande & Co. |
| Chartered Accountant | B S R & Co. LLP |
| Partner | Role in project |
|---|---|
| Godrej Skyline Developers Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn light of the reasons mentioned in our application, requesting you to grant us extension for a period of 1 years from 30th September 2025 to 30th September 2026
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503884 | Sandesh Dilip Dharmadhikari | Godrej Skyline Developers Limited | 05/11/2025 |
| CC12503934 | Datta Bhagwan Wadekar | Godrej Skyline Developers Limited | 09/11/2025 |
| CC12601018 | Durgesh Phoolchand Jaiswal | Godrej Skyline Developers Limited | 25/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Arch Certificate Madhuban Q1FY27.pdf | 19 Jul 2026 |
| Withdrawal Update Form 2File: Engg Certificate Madhuban Q1FY27.pdf | 19 Jul 2026 |
| Withdrawal Update Form 3File: MDD_RERA Certificate Madhuban_June_26_Signed.pdf | 19 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate S EWS Q4FY26.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: Eng_Certificate_Madhuban.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: MDD_RERA Certificate Madhuban_March_26_Signed.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate SEWS Q3FY26.pdf | 24 Jan 2026 |
| Withdrawal Update Form 2File: Engineers Certificate Madhuban Q3FY26.pdf | 24 Jan 2026 |
| Withdrawal Update Form 3File: RERA Certificate Madhuban December25 Signed.pdf | 24 Jan 2026 |
| Withdrawal Update Form 1File: Sep 25 Architect Certificate S EWS.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Engineers Certificare Madhuban.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: CA Cert RERA Certificate Madhuban September25.pdf | 20 Oct 2025 |
| Form 5 (FY 2024-2025)File: Madhuban Form 5 Anne 1_compressed (1).pdf | 26 Sep 2025 |
| Withdrawal Update Form 1File: Architect Certificate Madhuban.pdf | 20 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 Madhban.pdf | 20 Sep 2025 |
| Withdrawal Update Form 3File: CA Certificate Madhuban.pdf | 20 Sep 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: madhuban.pdf | 1 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate S EWS.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Madhuban CA Cert.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B MADHUBAN.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Madhuban.pdf | 20 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Madhuban.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate S EWS.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Madhuban.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Madhuban.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Madhuban.pdf | 20 Jan 2025 |
| CERSAI detailsFile: CERSAI Latest.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Madhuban Form 3.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Madhuban.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Madhuban.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Madhuban.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Madhuban.pdf | 15 Oct 2024 |
| CERSAI detailsFile: CERSAI.pdf | 15 Oct 2024 |
| PAN CardFile: Pan Card New.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Madhuban Form 5_compressed.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: MDD MADHUBAN.pdf | 8 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Madhuban.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Madhuban.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Madhuban.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_ Godrej Mamurdi North_June_24 (Signed).pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Madhuban.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality certificate_compressed.pdf | 16 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_RERA Certificate Madhuban_Mar_24 ( Signed).pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Madhuban March,2024.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Madhuban March,2024.pdf | 15 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: April 24_Disclosure of Sold-Madhuban signed.pdf | 12 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: April 24_Disclosure of Sold-Madhuban signed.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Madhuban - Architect's Certificate.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Madhuban - Enggineer's Certificate.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Madhuban__Dec 23.pdf | 12 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_RERA Certificate Madhuban_Dec-23_Signed.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Madhuban - Architect Certificate.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Madhuban Engg Certificate.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Madhuban Sept23.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_RERA_Madhuban_Signed_Sept_Revised.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Skyline - Madhuban.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Madhuban.pdf | 20 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FABS_GPL_MADHUBAN_ ENGINEER'S CERTIFICATE (Form-2).pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Madhuban__Jul-23.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_RERA Certificate Madhuban_ Signed.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_RERA Certificate Madhuban- OMD.PDF | 19 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Madhuban.pdf | 15 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Madhuban.pdf | 15 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assuarance Certificate Madhuban.pdf | 15 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Madhuban - disclosure of sold inventory.pdf | 15 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Madhuban.pdf | 20 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Madhuban.pdf | 19 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Madhuban.pdf | 19 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-MADHUBAN_Dec'22.pdf | 19 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf | 17 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: S-EWS_Sept22.pdf | 17 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Madhuban.pdf | 16 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate madhuban.pdf | 16 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Madhuban.pdf | 15 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Madhuban.pdf | 15 Jul 2022 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 15 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 15 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 15 Jul 2022 |
| Details of encumbrancesFile: CERSAI Report.pdf | 29 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 27 Apr 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| FOREST GROVE AT GODREJ PARK GREENSP52100023129 | MAMURDI VILLAGE, Pune | 1,139 | Dec 2019 | Ongoing | Sep 2027Registered original: Mar 2025 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MADHUBAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VILLAGE MAMURDI13,700+ in Pune
Filed coordinates, straight-line distance. 151 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: Godrej Skyline Developers Limited
Godrej Skyline Developers Limited has 8 registrations on MahaRERA, including Godrej Park Greens and Godrej Nurture. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if MADHUBAN is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MADHUBAN?
The registered promoter entity is Godrej Skyline Developers Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MADHUBAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MADHUBAN?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MADHUBAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MADHUBAN?
The professionals named in the filing: Architect: Architecture Collective; Engineer: Facilities And Building Solutions Pvt. Ltd. (FABS); Engineer: ANIL POWAR; Chartered Accountant: M D Deshpande & Co.; Chartered Accountant: B S R & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MADHUBAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback