ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Lodha Villa Royale Palava

Completed Litigation declared Plotted project

Lodha Villa Royale Palava

By LODHA DEVELOPERS LIMITED

RG-MH-89431 · RERA P51700047245 · Last updated on MahaRERA portal: 16 Oct 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
41 of 179Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Lodha Villa Royale Palava is a Plotted project by LODHA DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700047245 on 13 Oct 2022. The registration is recorded completed; possession was promised by 30 Sep 2025. 138 of the 179 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLodha Villa Royale Palava
  • TypePlotted
  • Location
    • Khoni & Antarli
    • Khoni
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • RERA no.P51700047245
  • ReraGenie IDRG-MH-89431

Builder

  • NameLODHA DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • ChairpersonsRAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA and 1 more
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredOct 2022PromisedSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Oct 2022
  • Promised completion30 Sep 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed88 files

Current status

77%138 of 179 units booked

Figures as on 16 Oct 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 16 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area81,878 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2025

Approvals and building plan

Sanctioning authorityDirectorate of Town Planning & Valuation, Thane
Permissible FSI50823.79
Proposed, not sanctioned46,204 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSwaminarayan, Dadar Branch

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerJaydeep Patil
EngineerHiroji Rane
Chartered AccountantChirag Sarvaiya & Co
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Litigation declared6

CaseCourtStatus
RCS No 397/2013Court of Civil Judge KalyanPending
RCS No 203/2014Court of Civil Judge KalyanPending
Spl C S No 37/2015Court of Civil Judge KalyanPending
RCS No 284/2015Court of Civil Judge KalyanPending
RCS No 586 /2016Court of Civil Judge KalyanPending
2718by 273/2018Revenue MinisterPending

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603001MADHU KHATRILODHA DEVELOPERS LIMITED21/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Oct 2025

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: OC Letter one 1.pdf16 Oct 2025
Form 2A (FY 2024-2025)File: Palava Plots Renamed to Lodha Villa Royale Palava - P51700047245.pdf24 Sep 2025
Form 1File: Form-1 Villa Royal- June-25.pdf22 Aug 2025
Form 2File: Lodha villa Royale palava Form 2 July 2025.pdf22 Aug 2025
Form 3File: Lodha villa Royale palava Form 3 June 2025.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Lodha villa royale palava Sold Unsold June 2025.pdf22 Aug 2025
OthersFile: AGREEMENT TO SELL_Plotted Draft.pdf22 Aug 2025
Form 1File: Form-1 Villa Royal- June-25.pdf18 Jul 2025
Form 2File: Lodha villa Royale palava Form 2 July 2025.pdf18 Jul 2025
Form 3File: Lodha villa Royale palava Form 3 June 2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Lodha villa royale palava Sold Unsold June 2025.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: Updated CC.pdf18 Jul 2025
OthersFile: Layout Sector D- Plotted Development.pdf18 Jul 2025
Form 1File: Form1-Lodha Villa Royale Palava -March 25.pdf23 Jun 2025
Form 2File: Form 2 - Lodha Royale Palava - March 25.pdf23 Jun 2025
Form 3File: Form 3 - Lodha Royale Palava - March 25.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold -Lodha Royale Palava - March 25.pdf23 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 23.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 23.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 23.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 23.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 24.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: june 24.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 24.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 24.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Villa Royale Palava.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 22.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 24.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate on Project Cost.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec 24.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sept 24.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 24.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sept 23.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 23.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 23.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec 22.pdf28 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec 23.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June 23.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 24.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June 24.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 24.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 23.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sept 23.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 23.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 22.pdf28 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1285_001.pdf28 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Plots.pdf27 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed Mar 25.pdf26 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed Mar-25.pdf26 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf26 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Villa Royale Palava.pdf5 May 2025
Commencement Certificates / NA Order for plotted developmentFile: Palava 2_Amended CC_compressed (1).pdf22 Apr 2025
Declaration about Commencement CertificateFile: plots CC declaration.pdf3 Apr 2025
Layout approvalFile: 6 (14).pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: 6 (14).pdf2 Apr 2025
Copy of the legal title reportFile: RERA New Format-Antarli Khoni 1 - Palava Plots.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold_Lodha Villa Royale Palava Dec 2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: plots.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: plots.pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold_Lodha Villa Royale Palava Dec 2024.pdf17 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700047245 - Lodha Villa Royale Palava.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Palava Plots Renamed to Lodha Villa Royale Palava - P51700047245.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Villa Royale Gold TDLR - P51700054370 - Nov 23.pdf17 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Villa Royale Gold TDLR - P51700054370 - March 24.pdf7 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Villa Royale Palava.pdf16 Oct 2023
Layout approvalFile: Layout with Land Area.pdf6 Oct 2022
Copy of Layout Approval (in case of layout)File: Layout with Land Area.pdf6 Oct 2022
Declaration about Commencement CertificateFile: New CC Decdlaration with Area Details.pdf6 Oct 2022
Layout approvalFile: Upload Layout Plan.pdf4 Oct 2022
Building plan approval or NA orderFile: Upload Layout Plan.pdf4 Oct 2022
Copy of Layout Approval (in case of layout)File: Upload Layout Plan.pdf4 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: Upload Layout Plan.pdf4 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Compress.pdf4 Oct 2022
Declaration about Commencement CertificateFile: New Declaration CC-1.pdf4 Oct 2022
Proforma of Allotment letterFile: Plots Allotment - Deviation.pdf26 Sep 2022
Proforma of Allotment letterFile: ATS - Model RERA with highlights-260922.pdf26 Sep 2022
Deviation Report with respect to Allotment letterFile: Plots Allotment - Deviation.pdf26 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation to ATS-260922-Scanned.pdf26 Sep 2022
Copy of the legal title reportFile: TR-For Upload.pdf13 Aug 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
LODHA PARKP51900001339.2,210Jul 2017CompletedDec 2023Registered original: Dec 2021Feb 2022

How this compares with Thane

77%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lodha Villa Royale Palava on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khoni & Antarli7,600+ in Thane

Builder: LODHA DEVELOPERS LIMITED

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Lodha Villa Royale Palava is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lodha Villa Royale Palava?

The registered promoter entity is LODHA DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lodha Villa Royale Palava?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lodha Villa Royale Palava?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lodha Villa Royale Palava?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lodha Villa Royale Palava?

The professionals named in the filing: Engineer: Jaydeep Patil; Engineer: Hiroji Rane; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lodha Villa Royale Palava?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lodha Villa Royale Palava. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lodha Villa Royale Palava to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.