LINKBAY RESIDENCES PHASE II WING B
RG-MH-56450 · RERA PR1181012501116 · Last updated on MahaRERA portal: 8 May 2026
Source: official MahaRERA filing
Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
At a glance
Project
- NameLINKBAY RESIDENCES PHASE II WING B
- TypeResidential / Group Housing
- Location
- Village Ambivali Link Road
- Andheri (West)
- Ambivali
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1181012501116
- ReraGenie IDRG-MH-56450
Builder
- NamePortsmouth Buildcon Private Limited and Shiv Infra Vision Private Limited
- Entity typeCompany
- CINU45201GJ2021PTC124244
- GSTIN27AAMCP1471H1Z8
- Track record13 past projects →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Oct 2025
- Promised completion30 Jun 2030
- Revised completionNone
- Buildings1 building record
- Documents filed77 files
Current status
Figures from the project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing B | NA | 29 | 23 | 88 | 0 | 88 |
These details are filed with MahaRERA and packaged in the Rs 499 buyer report. Create a free account to preview, or read the full report for the verdict.
Builder: Portsmouth Buildcon Private Limited and Shiv Infra Vision Private Limited
Portsmouth Buildcon Private Limited and Shiv Infra Vision Private Limited has 1 registration in this build, including LINKBAY RESIDENCES PHASE II WING B. Its filings disclose 13 earlier MahaRERA projects: 12 of 12 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if LINKBAY RESIDENCES PHASE II WING B is delayed beyond 30 Jun 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LINKBAY RESIDENCES PHASE II WING B?
The registered promoter entity is Portsmouth Buildcon Private Limited and Shiv Infra Vision Private Limited, a company as per the filing. Its CIN U45201GJ2021PTC124244 and GSTIN 27AAMCP1471H1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents, all downloadable free from this page with a login.
Is my payment protected in LINKBAY RESIDENCES PHASE II WING B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at LINKBAY RESIDENCES PHASE II WING B?
The professionals named in the filing: Architect: Creative Consultancy; Engineer: Mahimtura Consultants Pvt Ltd; Engineer: Mahimtura Consultants Private L; Engineer: Mahimtura Consultants Private Limited; Engineer: Hillel Eliazer Divekar; Engineer: Gem Engserv Private Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LINKBAY RESIDENCES PHASE II WING B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Spotted something wrong? Report a data issue