ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / LAXMI ANNEX

Completed No litigation declared Residential / Group Housing project

LAXMI ANNEX

By LAXMIDEVI DEVELOPERS

RG-MH-28364 · RERA P51800026325 · Last updated on MahaRERA portal: 27 Oct 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
5 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

LAXMI ANNEX is a Residential / Group Housing project by LAXMIDEVI DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800026325 on 8 Sep 2020. The registration is recorded completed; possession was promised by 30 Jun 2023. 15 of the 20 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameLAXMI ANNEX
  • TypeResidential / Group Housing
  • Location
    • ROAD NO 16
    • JAWAHAR NAGAR GOREGAON WEST
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • RERA no.P51800026325
  • ReraGenie IDRG-MH-28364

Builder

  • NameLAXMIDEVI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAEFL2308J1ZF
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBharat Ashulal Kothari, Rakesh Ashulal Kothari, Gunvant Ashulal Kothari
  • Other registrations6 more →
  • Completed5 of 7
  • Past their filed date1
  • Declared earlier projects7 →

Key dates

this monthRegisteredSep 2020PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Sep 2020
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

75%15 of 20 units booked

Figures as on 27 Oct 2022, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAXMI ANNEXNA13920020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

LAXMI ANNEX: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area488 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI1316.25
Proposed, not sanctioned975 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS V ROAD GOREGAON WEST

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRasik P Hingoo Associates
EngineerASHOK RAMCHANDRA KUMAR
Chartered AccountantZUBIN HARIA AND ASSOCIATES
Chartered AccountantAkshay & Co
Chartered AccountantPIYUSH SHETH
PartnerRole in project
LAXMIDEVI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jul 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Aug 2022

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-.pdf27 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf27 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf27 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory- as on 18-08-22.pdf19 Aug 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory- as on 18-08-22.pdf19 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form.pdf13 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 LAXMI ANNEX.pdf10 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Letter.pdf3 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 1.pdf3 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 2.pdf3 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 3.pdf3 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 4.pdf3 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC plan 5.pdf3 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC plan 6.pdf3 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC plan 7.pdf3 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 8.pdf3 Aug 2022
Building plan approvalFile: Letter.pdf18 May 2022
Building plan approvalFile: Plan -1.pdf18 May 2022
Building plan approvalFile: Plan -2.pdf18 May 2022
Building plan approvalFile: Plan - 4.pdf18 May 2022
Building plan approvalFile: Plan - 5.pdf18 May 2022
Building plan approvalFile: Plan - 6.pdf18 May 2022
Building plan approvalFile: Plan - 7.pdf18 May 2022
Building plan approvalFile: Plan - 8.pdf18 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Letter.pdf18 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan -1.pdf18 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan -2.pdf18 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan - 4.pdf18 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan - 5.pdf18 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan - 6.pdf18 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan - 7.pdf18 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan - 8.pdf18 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Laxmi Annex.pdf15 Mar 2022
Details of encumbrancesFile: Encumbrances Certificate Laxmi Annex.pdf2 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: CC (2).pdf1 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form -2A Laxmi Annex.pdf6 Jul 2021
Declaration about Commencement CertificateFile: Format-D Laxmi Annex.pdf1 Jul 2021
Disclosure of sold/ booked inventoryFile: Discolsure of sold -booked inventory Laxmi Annex.pdf1 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CC Laxmi Annexe for Rera.pdf20 May 2021
Commencement Certificates / NA Order for plotted developmentFile: CC Sale Wing B.pdf26 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA - FORM 3 - FINAL.pdf2 Sep 2020
Proforma of Allotment letterFile: Laxmi Annex Rera agreement.pdf29 Aug 2020
Building plan approvalFile: Letter.pdf28 Aug 2020
Building plan approvalFile: 1.pdf28 Aug 2020
Building plan approvalFile: 2_compressed.pdf28 Aug 2020
Building plan approvalFile: 3_compressed.pdf28 Aug 2020
Building plan approvalFile: 4_compressed.pdf28 Aug 2020
Building plan approvalFile: 5_compressed.pdf28 Aug 2020
Building plan approvalFile: 6_compressed.pdf28 Aug 2020
Building plan approvalFile: 7_compressed.pdf28 Aug 2020
Copy of the legal title reportFile: Title Certificate final (1) (1).pdf28 Aug 2020
Details of encumbrancesFile: Title Certificate COMPRESSED.pdf28 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Letter.pdf28 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf28 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 2_compressed.pdf28 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 3_compressed.pdf28 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 4_compressed.pdf28 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 5_compressed.pdf28 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 6_compressed.pdf28 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 7_compressed.pdf28 Aug 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera_certificate.pdf18 Aug 2020
Proforma of Allotment letterFile: AGREEMENT.pdf23 Jul 2020
Declaration in FORM BFile: Form B.pdf22 Jul 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate .pdf21 Jul 2020
Layout approvalFile: Letter.pdf17 Jul 2020
Layout approvalFile: 1.pdf17 Jul 2020
Layout approvalFile: 2_compressed.pdf17 Jul 2020
Layout approvalFile: 3_compressed.pdf17 Jul 2020
Layout approvalFile: 5_compressed.pdf17 Jul 2020
Layout approvalFile: 6_compressed.pdf17 Jul 2020
Layout approvalFile: 4_compressed.pdf17 Jul 2020
Layout approvalFile: 7_compressed.pdf17 Jul 2020
PAN CardFile: LD.pdf17 Jul 2020
Copy of Layout Approval (in case of layout)File: Letter.pdf17 Jul 2020
Copy of Layout Approval (in case of layout)File: 1.pdf17 Jul 2020
Copy of Layout Approval (in case of layout)File: 2_compressed.pdf17 Jul 2020
Copy of Layout Approval (in case of layout)File: 3_compressed.pdf17 Jul 2020
Copy of Layout Approval (in case of layout)File: 5_compressed.pdf17 Jul 2020
Copy of Layout Approval (in case of layout)File: 6_compressed.pdf17 Jul 2020

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
LAXMI SHRUSHTI - WING BP51800030965GOREGAON WEST, Mumbai Suburban136Sep 2021OngoingAug 2025Not delivered
LUXURY CHSL LTDP51800050568BEHIND FILMISTAN, Mumbai Suburban63Apr 2023OngoingJun 2025Not delivered
LAXMI CALLISTAP51800010929Goregaon West, Mumbai Suburban90Aug 2017CompletedSep 2019Late, Dec 2020
Laxmi HeightsJawhar Nagar Road No 16 Goregaon west35-CompletedDec 2018Nov 2018
Laxmi EnclaveNadaidwala compound SV Road Malad west24-CompletedJun 2018Mar 2018
laxmi VillaJawahr Nagar Road No. 0337-CompletedJun 2018May 2018

How this compares with Mumbai Suburban

75%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAXMI ANNEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JAWAHAR NAGAR GOREGAON WEST6,700+ in Mumbai Suburban

Builder: LAXMIDEVI DEVELOPERS

LAXMIDEVI DEVELOPERS has 7 registrations on MahaRERA, including LAXMI HEIGHTS and LAXMI CALLISTA. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LAXMI ANNEX is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAXMI ANNEX?

The registered promoter entity is LAXMIDEVI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAEFL2308J1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAXMI ANNEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LAXMI ANNEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAXMI ANNEX?

The professionals named in the filing: Architect: Rasik P Hingoo Associates; Engineer: ASHOK RAMCHANDRA KUMAR; Chartered Accountant: ZUBIN HARIA AND ASSOCIATES; Chartered Accountant: Akshay & Co; Chartered Accountant: PIYUSH SHETH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAXMI ANNEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAXMI ANNEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAXMI ANNEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.