GURUKRUPA ALAKNANDA
By GURUKRUPA REALCON INFRASTRUCTURE DEVELOPERS
RG-MH-06617 · RERA P51900053781 · Last updated on MahaRERA portal: 14 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GURUKRUPA ALAKNANDA is a Residential / Group Housing project by GURUKRUPA REALCON INFRASTRUCTURE DEVELOPERS in Mumbai City, Maharashtra, registered with MahaRERA as P51900053781 on 28 Nov 2023. Possession is promised by 31 Dec 2026. 16 of the 76 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameGURUKRUPA ALAKNANDA
- TypeResidential / Group Housing
- Location
- GULMOHAR CROSS ROAD NO 10
- JVPD SCHEME
- Mumbai City
- 400049
- Pincode400049
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900053781
- ReraGenie IDRG-MH-06617
Builder
- NameGURUKRUPA REALCON INFRASTRUCTURE DEVELOPERS
- Entity typePartnership
- PartnersMAHESH LIRA VERAT, URMILA MAHESH VERAT
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Nov 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed91 files
Current status
Figures as on 14 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GURUKRUPA ALAKNANDA | NA | 24 | 16 | 76 | 0 | 76 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
GURUKRUPA ALAKNANDA: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed140
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| JUHU ALAKNANDA CHS LTD | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GURUKRUPA ALAKNANDA | NA | Rs 80.00 cr | Rs 79.50 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | INGENIOUS ARCHITECTS |
| Engineer | PRAGNESH OJHA |
| Engineer | FOUNTAINHEAD ENGINEERS CIVIL & STRUCTURAL CONSULTANT |
| Engineer | RAJENDRA PRASAD |
| Chartered Accountant | MGDG AND ASSOCIATES |
| Chartered Accountant | S R PRAJAPATI & Co |
| Partner | Role in project |
|---|---|
| GURUKRUPA REALCON INFRASTRUCTURE DEVELOPERS | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 6281/2016 | BOMBAY HIGH COURT | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Apr 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Apr 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 04 ALAKNANDA 31 Dec 2025.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA 31 Dec 2025.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda dec 2025.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda dec 2025.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 18122025.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 1 18122025.pdf | 14 May 2026 |
| Building plan approvalFile: 4 OC plan Page No 1.pdf | 4 Apr 2026 |
| Building plan approvalFile: 4 OC plan Page No 2.pdf | 4 Apr 2026 |
| Building plan approvalFile: 4 OC plan Page No 3.pdf | 4 Apr 2026 |
| Building plan approvalFile: 4 OC plan Page No 4.pdf | 4 Apr 2026 |
| Building plan approvalFile: 4 OC plan Page No 5.pdf | 4 Apr 2026 |
| Building plan approvalFile: 4 OC plan Page No 6.pdf | 4 Apr 2026 |
| Building plan approvalFile: 4 OC plan Page No 7.pdf | 4 Apr 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 Alakhananda FY 24 25.pdf | 4 Apr 2026 |
| Commencement certificateFile: 04 Full CC 25032025.pdf | 3 Apr 2026 |
| Layout approvalFile: 04 Full OC 18122025.pdf | 3 Apr 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA 31 Dec 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA 31 Dec 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda dec 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda dec 2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 18122025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 18122025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA 31 Dec 2025.pdf | 25 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda dec 2025.pdf | 25 Mar 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 18122025.pdf | 25 Mar 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA FORM 1 30 sep 2025.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA FORM 1 30 sep 2025.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA 31 Dec 2025.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA 31 Dec 2025.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda 30092025.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda 30092025.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda dec 2025.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda dec 2025.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 300925.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 300925.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 18122025.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 18122025.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA FORM 1 30 sep 2025.pdf | 12 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda 30092025.pdf | 12 Mar 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 300925.pdf | 12 Mar 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA FORM 1 30 sep 2025.pdf | 10 Mar 2026 |
| Withdrawal Update Form 1File: 04 ALAKNANDA FORM 1 30 sep 2025.pdf | 10 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda 30092025.pdf | 10 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Alaknanda 30092025.pdf | 10 Mar 2026 |
| Withdrawal Update Form 3File: Final FORM-3 SIGN1.pdf | 10 Mar 2026 |
| Withdrawal Update Form 3File: Final FORM 3 Alaknanda 300925.pdf | 10 Mar 2026 |
| Form 1File: 04 FORM 1 ALAKNANDA 30 Jun 2025.pdf | 21 Jul 2025 |
| Form 2File: Form 2 Alaknanda 07072025 signed.pdf | 21 Jul 2025 |
| Form 3File: Final FORM 3 Alaknanda 300625.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and Unsold Alaknanda 30062025.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 ALAKNANDA 31 march 2025.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3 Alaknanda 310325.pdf | 9 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Alaknanda 06-04-2025 signed.pdf | 7 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure sold unsold Alaknanda 31 12 2024.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Alakhananda.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3 - Alaknanda 31122024 1.pdf | 7 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 24.pdf | 7 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: alaknanda further cc upto 11th floor.pdf | 7 Mar 2025 |
| Declaration about Commencement CertificateFile: Declaration About CC upto 11th Floor dt 06 03 2025.pdf | 7 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3 Alaknanda 311224.pdf | 1 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alaknanda Form 1 31st Dec 2024.pdf | 4 Feb 2025 |
| Layout approvalFile: IOA Letter 04052023.pdf | 23 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: IOA Letter 04052023.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 ALAKNANDA 30 June 2024 rera QUARTERLY PYMT PENDING.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 ALAKNANDA 30 SEP 2024 rera QUARTERLY PYMT PENDING.pdf | 23 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC UP TO 5th Floor 21082024.pdf | 23 Jan 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Juhu Alaknanda Soc Reg Certificate.pdf | 23 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Alaknanda 02042024.pdf | 23 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Encumberance Final.pdf | 17 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Encumberance Final.pdf | 17 Oct 2023 |
| Copy of the legal title reportFile: ALAKNANDA LEASE DEED.pdf | 15 Sep 2023 |
| Copy of the legal title reportFile: ALAKNANDA SALE DEED.pdf | 15 Sep 2023 |
| Layout approvalFile: Layout Plan Final.pdf | 29 Aug 2023 |
| Building plan approvalFile: Layout Plan Final.pdf | 29 Aug 2023 |
| PAN CardFile: PAN.pdf | 29 Aug 2023 |
| Copy of the legal title reportFile: final Title Search Report 2.pdf | 29 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter.pdf | 29 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter.pdf | 29 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Plan Final.pdf | 29 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout Plan Final.pdf | 29 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GURUKRUPA ALAKNANDA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JVPD SCHEME780+ in Mumbai City
Filed coordinates, straight-line distance. 35 registered projects within 2 km.
Sirius
V HOTELS LTD
THE ARCADIAN
DHYAN PROJECTS PRIVATE LIMITED
Kalpataru Amare
Kalpataru Limited
45TH MARINE
UMMANG HARMONY LIFESTYLES LLP
Park Grandeur
SHREE SURAJ RESOURCES PRIVATE LIMITED
RISHABRAJ TRIDENT
H RISHABRAJ REALTY
See every Mumbai City project, with the district possession charts
Builder: GURUKRUPA REALCON INFRASTRUCTURE DEVELOPERS
GURUKRUPA REALCON INFRASTRUCTURE DEVELOPERS has 1 registration on MahaRERA, including GURUKRUPA ALAKNANDA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if GURUKRUPA ALAKNANDA is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GURUKRUPA ALAKNANDA?
The registered promoter entity is GURUKRUPA REALCON INFRASTRUCTURE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GURUKRUPA ALAKNANDA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GURUKRUPA ALAKNANDA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GURUKRUPA ALAKNANDA?
The professionals named in the filing: Architect: INGENIOUS ARCHITECTS; Engineer: PRAGNESH OJHA; Engineer: FOUNTAINHEAD ENGINEERS CIVIL & STRUCTURAL CONSULTANT; Engineer: RAJENDRA PRASAD; Chartered Accountant: MGDG AND ASSOCIATES; Chartered Accountant: S R PRAJAPATI & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GURUKRUPA ALAKNANDA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback