Registered No litigation declared Mixed project

L&T Realty Harmony

By ELEVATED AVENUE REALTY LLP

RG-MH-84765 · RERA PM1180002600841 · Last updated on MahaRERA portal: 7 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 90%
36 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 15 documents Report an error

L&T Realty Harmony is a Mixed project by ELEVATED AVENUE REALTY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as PM1180002600841 on 18 Jun 2026. Possession is promised by 31 Aug 2028. 0 of the 36 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameL&T Realty Harmony
  • TypeMixed
  • Location
    • 18.30Mt. Chitrakar Dhurandar Marg
    • 20th Road
    • Khar west
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1180002600841
  • ReraGenie IDRG-MH-84765

Builder

  • NameELEVATED AVENUE REALTY LLP
  • Entity typeLimited Liability Partnership
  • LLPINAAA-5055
  • GSTIN27AAEFL7465N1ZN
  • Designated PartnersAnupam KUmar Amar Nath Srivastava, UMACHARAN RATH
  • Other registrations6 more →
  • Completed1 of 7
  • Declared earlier projects7 →

Key dates

this monthRegisteredJun 2026PromisedAug 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jun 2026
  • Promised completion31 Aug 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed15 files

Current status

0%0 of 36 units booked

Figures as on 7 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing AWing A1912221436

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

Wing A · wing Wing A: 47% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)90%
Podiums (if any)90%
Plinth90%
Stilt Floor90%
Slabs of Super Structure21%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed123

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots123
Podiums / Upper Parking Floor123

Land and ownership13

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,927 sq m
Land owned byNot the promoter
Named landowners13
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Feb 2026
LandownerVillageDistrict
Pervez Nadir DumasiaBandraMumbai Suburban
Vahbiz Pervez DumasiaBandraMumbai Suburban
Ashwanikumar Vrajlal DesaiBandraMumbai Suburban
Aradhana Ashwanikumar DesaiBandraMumbai Suburban
Pooja Sanjay NandaniBandraMumbai Suburban
Sanjay Madhukar NandaniBandraMumbai Suburban
Brendan D MelloBandraMumbai Suburban
Belinda D MelloBandraMumbai Suburban
Jason D MelloBandraMumbai Suburban
Beverly Rita Maria PereiraBandraMumbai Suburban
Gillian MirandaBandraMumbai Suburban
The Shillu Co Operative Housing Society LimitedOthersMumbai Suburban
Larsen & Toubro LimitedMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI5017.01
Proposed, not sanctioned5,017 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch.5 C/ II, MITTAL COURT,224, NARIMAN POINT,MUMBAI - 400 021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectOMKAR DEVRUKHAKAR
EngineerINTENTO ASSOCIATES
Chartered AccountantURMIT SHAH
PartnerRole in project
ELEVATED AVENUE REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2028

Documents filed15

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: layout.pdf7 Feb 2026
Layout approvalFile: LAYOUT.pdf1 Feb 2026
Building plan approvalFile: 2 Basement and Ground.pdf28 Jan 2026
Building plan approvalFile: 3 3rd 4th 5th Podium.pdf28 Jan 2026
Building plan approvalFile: 4 6th Podium floor.pdf28 Jan 2026
Building plan approvalFile: 5 7th Refuge Floor.pdf28 Jan 2026
Building plan approvalFile: 6 8th and 9th Floor.pdf28 Jan 2026
Building plan approvalFile: 7 10TH TO 12TH 15TH 16TH FLOOR.pdf28 Jan 2026
Building plan approvalFile: 8 12A Floor.pdf28 Jan 2026
Building plan approvalFile: 9 14th Floor.pdf28 Jan 2026
Building plan approvalFile: 10 17th Floor.pdf28 Jan 2026
Building plan approvalFile: 11 Section Wing A.pdf28 Jan 2026
Layout approvalFile: Amended Approval Letter Jan2026.pdf28 Jan 2026
Building plan approvalFile: Amended-Plans-JAN 2026.pdf28 Jan 2026
Declaration and undertaking (Annexure A)File: Declaration 50 upload.pdf28 Jan 2026

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
CENTRONA NOVA-AP51800005456Ghatkopar East, Mumbai Suburban226Aug 2017OngoingJun 2027Registered original: Dec 2026Not due yet
CENTRONA NOVA BP51800004566Ghatkopar East, Mumbai Suburban228Aug 2017OngoingJun 2027Registered original: Dec 2026Not due yet
REJUVE 360 - TOWER AP51800023075Nahur, Mumbai Suburban538Nov 2019OngoingDec 2026Not due yet
CENTRONA ZEST- BP51800003201Ghatkopar East, Mumbai Suburban231Aug 2017OngoingDec 2026Not due yet
CENTRONA ZEST- AP51800003446Ghatkopar East, Mumbai Suburban231Aug 2017OngoingDec 2026Not due yet
CENTRONA ZEN-BP51800006139Ghatkopar East, Mumbai Suburban374Aug 2017OngoingDec 2026Not due yet
CENTRONA ZEN-AP51800006239Ghatkopar East376Aug 2017OngoingDec 2026Not due yet

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep L&T Realty Harmony on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near 20th Road, Khar west6,700+ in Mumbai Suburban

2 kmL&T Realty HarmonyCompleted 116Lapsed / revoked 57Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 315 registered projects within 2 km.

Builder: ELEVATED AVENUE REALTY LLP

Elevated Avenue Realty LLP has 7 registrations on MahaRERA, including CENTRONA ZEST- A and CENTRONA NOVA-A. Its filings disclose 7 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if L&T Realty Harmony is delayed beyond 31 Aug 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of L&T Realty Harmony?

The registered promoter entity is ELEVATED AVENUE REALTY LLP, a limited liability partnership as per the filing. Its LLPIN AAA-5055 and GSTIN 27AAEFL7465N1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in L&T Realty Harmony?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for L&T Realty Harmony?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at L&T Realty Harmony?

The professionals named in the filing: Architect: OMKAR DEVRUKHAKAR; Engineer: INTENTO ASSOCIATES; Chartered Accountant: URMIT SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in L&T Realty Harmony?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About L&T Realty Harmony. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save L&T Realty Harmony to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.