Home / Browse projects / Mumbai Suburban, Maharashtra / REJUVE 360 - TOWER A

Completed No litigation declared Residential / Group Housing project

REJUVE 360 - TOWER A

By Elevated Avenue Realty LLP

RG-MH-15791 · RERA P51800023075 · Last updated on MahaRERA portal: 25 Sep 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Installation of Lifts, 99%
1 of 538Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

REJUVE 360 - TOWER A is a Residential / Group Housing project by Elevated Avenue Realty LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800023075 on 25 Nov 2019. The registration is recorded completed; possession was promised by 30 Dec 2026. 537 of the 538 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameREJUVE 360 - TOWER A
  • TypeResidential / Group Housing
  • Location
    • L B S Marg
    • Nahur
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800023075
  • ReraGenie IDRG-MH-15791

Builder

  • NameElevated Avenue Realty LLP
  • Entity typeLimited Liability Partnership
  • LLPINAAA-5055
  • GSTIN27AAEFL7465N1ZN
  • Named personsL & T Realty Limited, Chennai Vision Developers Private Limited
  • Other registrations6 more →
  • Completed1 of 7
  • Declared earlier projects7 →

Key dates

this monthRegisteredNov 2019PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Nov 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed132 files

Current status

100%537 of 538 units booked
98.6%Work done, per cost certificate

Figures as on 25 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
REJUVE 360 - TOWER ANA70645380538

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 99%.

REJUVE 360 - TOWER A: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Progress on shared amenities15

As on 25 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes80%
Street LightingYes90%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed792

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots792
Closed/Covered792

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,219 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Nirmal Lifestyle Developers Private LimitedKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI49334.59
Proposed, not sanctioned49,335 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPOWAI, MUMBAI
Estimated costRs 431.00 cr
Cost incurredRs 425.05 cr
Work done98.62%
BuildingWingEstimatedIncurred
REJUVE 360 - TOWER ANARs 366.90 crRs 363.44 cr
-NARs 64.10 crRs 61.61 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManoj Daisaia Daisaia
EngineerSwapnil Joshi
EngineerRajendra Joshi
Chartered Accountanturmit shah
Chartered AccountantSharp and Tannan
PartnerRole in project
Elevated Avenue Realty LLP-

Litigation declared4

CaseCourtStatus
8031 of 1984/1984City Civil Court MumbaiPending before City Civil Court Mumbai
10610 of 2016/2016High Court of BombayPending for Admission
4307 of 1996/1996High Court of BombayPending before Honble Bombay High court
1424 of 2015/2015Minister of Revenue Govt of MaharashtraPending

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000209655Mr. Piyush A. WanelkarL&T Asian Realty Project LLP09/01/2022
CC006000000209654Mr. Arjun S. WanelkarL&T Asian Realty Project LLP09/01/2022
CC12602126Sureshmani AlexanderElevated Avenue Realty LLP11/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: L-142_118_Final Form 5 - Rejuve.pdf25 Sep 2026
Occupational CertificateFile: Rejuve Full OC A Wing and A1 Club house.pdf17 Jun 2026
Withdrawal Update Form 1File: RERA Form-1 Rejuve.pdf20 Apr 2026
Withdrawal Update Form 2File: RERA Form-2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 with Table C_Q4_FY 25-26_Rejuve360.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Rejuve Form-2A- March 26 sign f.pdf19 Apr 2026
Withdrawal Update Form 1File: RERA Form-1_Rejuve Q3 2526.pdf20 Jan 2026
Withdrawal Update Form 2File: Rejuve Form 2 Q3 2526.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Rejuve Q3 2526.pdf20 Jan 2026
Withdrawal Update Form 1File: Form-1-RE.pdf20 Oct 2025
Withdrawal Update Form 2File: Form-2-RE.pdf20 Oct 2025
Withdrawal Update Form 3File: Form-3-RE.pdf20 Oct 2025
Form 2A (FY 2024-2025)File: RERA Form-2A-Rejuve.pdf3 Oct 2025
Form 5 (FY 2024-2025)File: Form-5-Rejuve.pdf1 Oct 2025
Withdrawal Update Form 1File: Form-1-RE.pdf23 Jul 2025
Withdrawal Update Form 2File: RERA- Form 2 rejuve q1.pdf23 Jul 2025
Withdrawal Update Form 3File: Form-3-RE.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-RE.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-RE.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-RE.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory-RE.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-RE.pdf20 Apr 2025
PAN CardFile: PAN-Elevated Avenue Realty LLP.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Rejuve.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Rejuve.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Rejuve.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory-Rejuve.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-Rejuve.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: L142-FDB-Rejuve-187.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Sept 24.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2_FY 24-25-Rejuve-360.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2-30-09-24.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory-RE.pdf20 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-Sept 24.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold unsld_Rejuve 360_Q1_2024-25.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1_31-03-2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2_31-03-2024.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RERA-Form-2A_31-03-2024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Rejuve360_.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1.pdf21 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf21 Jan 2024
Disclosure of sold/ booked inventoryFile: Rejuve 360 Tower A.pdf21 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 360 Rejuve_Wing A form 1.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 TowerA 30-09-2023.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Rejuve 60 Form 2A Certificate - 14_ Q end 30-09-23.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Rejuve.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Q2_FY 23-24_Rejuve.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Rejuve 360.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf1 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TowerA.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: MX-3561_20230719_132231.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Rejuve 360 Tower 1.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Rejuve 360_1_compressed.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Rejuve 360_2_compressed.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf19 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA form 2 tower A.pdf4 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_RejuveA_Q2_c.pdf20 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_RejuveA_Q2_c.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: Rejuve A_sold_sep22.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Rejuve 360 Tower A.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rejuve-Form1 Jun22.pdf17 Sep 2022
Disclosure of sold/ booked inventoryFile: Corrected Disclosure sold unsold_March 2022_Rejuve 360.pdf22 Aug 2022

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep REJUVE 360 - TOWER A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nahur6,700+ in Mumbai Suburban

2 kmREJUVE 360 - TOWER ACompleted 99Lapsed / revoked 71Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 306 registered projects within 2 km.

Builder: Elevated Avenue Realty LLP

Elevated Avenue Realty LLP has 7 registrations on MahaRERA, including CENTRONA ZEST- A and CENTRONA NOVA-A. Its filings disclose 7 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if REJUVE 360 - TOWER A is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of REJUVE 360 - TOWER A?

The registered promoter entity is Elevated Avenue Realty LLP, a limited liability partnership as per the filing. Its LLPIN AAA-5055 and GSTIN 27AAEFL7465N1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in REJUVE 360 - TOWER A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against REJUVE 360 - TOWER A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for REJUVE 360 - TOWER A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at REJUVE 360 - TOWER A?

The professionals named in the filing: Architect: Manoj Daisaia Daisaia; Engineer: Swapnil Joshi; Engineer: Rajendra Joshi; Chartered Accountant: urmit shah; Chartered Accountant: Sharp and Tannan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REJUVE 360 - TOWER A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REJUVE 360 - TOWER A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REJUVE 360 - TOWER A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.