Home / Browse projects / Pune, Maharashtra / KUMAR PALMNEST
KUMAR PALMNEST
By KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED
RG-MH-22748 · RERA P52100045312 · Last updated on MahaRERA portal: 15 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KUMAR PALMNEST is a Others project by KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100045312 on 12 May 2022. Possession is promised by 31 Dec 2030. The completion date has moved by 48 months from the original filing. 0 of the 82 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameKUMAR PALMNEST
- TypeOthers
- Location
- KATRAJ HADPSAR ROAD
- PISOLI
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045312
- ReraGenie IDRG-MH-22748
Builder
- NameKUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED
- Entity typeCompany
- CINU45200PN2013PTC147354
- GSTIN27AAFCK1688N1ZW
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorRajas Vimalkumar Jain
- Other registrations6 more →
- Completed3 of 7
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 May 2022
- Promised completion31 Dec 2030
- Revised completionRevised to 31 Dec 2030 (originally 31 Dec 2026)
- Buildings1 building record
- Documents filed94 files
Current status
Figures as on 15 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KUMAR PALMNEST | NA | 10 | 9 | 67 | 15 | 82 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 56%.
KUMAR PALMNEST: 26% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 56% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 2% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed128
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership6
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Suraiya T Somjee | kondhwa khurd | Pune |
| SHAHNAZ A SOMJEE | kondhwa khurd | Pune |
| MOHIUDDIN A SOMJEE | kondhwa khurd | Pune |
| LISA A SOMJEE | kondhwa khurd | Pune |
| SHOHEB A SOMJEE | kondhwa khurd | Pune |
| SHABINA A LAKHANI | kondhwa khurd | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| KUMAR PALMNEST | NA | Rs 23.34 cr | Rs 6.93 cr |
| - | NA | Rs 3.24 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PARVEZ JAMADAR |
| Architect | SAMEER VALIMBE |
| Engineer | AKSHAY JAGTAP |
| Engineer | Mr Abhijeet Shekar |
| Chartered Accountant | SUPRIYA ABHIJIT MUNDADA |
| Chartered Accountant | SPAK & CO. |
| Partner | Role in project |
|---|---|
| KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1, KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED, through its Director MR. RAJAS V. JAIN, Promoter/Landowner/Authorized Representative of the real estate project "KUMAR PALMNEST" bearing MahaRERA Registration No. P52100045312 (hereinafter referred to as "the said Project"), do hereby solemnly affirm and declare as under: 1. That due to unavoidable circumstances, including internal legal and family disputes among the owners of the project land, the Promoter has been unable to commence construction of the said Project to date. 2. That no units in the said Project have been marketed or sold, and
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jun 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Palmnest Form 1_June 26.pdf | 15 Jul 2026 |
| Withdrawal Update Form 2File: Palmnest Engineers Certificate.pdf | 15 Jul 2026 |
| Withdrawal Update Form 3File: KPPPL Form 3 K Palmnest.pdf | 15 Jul 2026 |
| Layout approvalFile: plans.pdf | 1 Jun 2026 |
| Withdrawal Update Form 1File: Palmnest Form 1_March 26.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Palmnest Engineering Certificate.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: KPPPL K Palmnest Form 3.pdf | 23 Apr 2026 |
| Form 5 (FY 2024-2025)File: K Palmnest Form 5 FY 2024-25.pdf | 3 Apr 2026 |
| Form 5 (FY 2023-2024)File: K Palmnest Form 5 FY 2023-24.pdf | 2 Apr 2026 |
| Form 5 (FY 2022-2023)File: K Palmnest Form 5 FY 2022-23.pdf | 2 Apr 2026 |
| Form 1File: Form 1 - 11 7 2022.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2022 07 11.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - June 2022.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - June 2022.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - Sep 2022.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - Sept 2022.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2022 10 11.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 11 10 2022.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 12 1 2023.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2023 01 12.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - Dec 2022.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - Dec 2022.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 7 4 2023.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2023 04 07.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - March 2023.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - March 2023.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 11 7 2023.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2023 07 11.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - June 2023.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - June 2023.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 11 10 2023.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2023 10 11.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - Sept 2023.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest Form 3 - Sept 2023.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 6 1 2024.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2024 01 06.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - Dec 2023.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - Dec 2023.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 9 4 2024.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineer s Certificate 2024 04 09.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - March 2024.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - March 2024.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 8 7 2024.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2024 07 08.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - June 2024.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - June 2024.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 10 10 2024.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2024 10 10.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - Sept 2024.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - Sep 2024.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 9 1 2025.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2025 01 09.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - Dec 2024.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - Dec 2024.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 9 4 2025.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2025 04 09.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - March 2025.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - March 2025.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 11 7 2025.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2025 07 11.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - June 2025.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - June 2025.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 8 10 2025.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2025 10 08.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - Sept 2025.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - Sep 2025.pdf | 4 Mar 2026 |
| Form 1File: Form 1 - 8 1 2026.pdf | 4 Mar 2026 |
| Form 2File: Palmnest Engineers Certificate 2026 1 08.pdf | 4 Mar 2026 |
| Form 3File: Kumar Palmnest Form 3 - Dec 2025.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Kumar Palmnest - Dec 2025.pdf | 4 Mar 2026 |
| Declaration about Commencement CertificateFile: DECLARATION.pdf | 10 May 2022 |
| Copy of the legal title reportFile: Search and Tittle Report.pdf | 2 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: palmnest.pdf | 30 Apr 2022 |
| Proforma of Allotment letterFile: Agreement Draft.pdf | 22 Apr 2022 |
| Building plan approvalFile: SECTION.pdf | 23 Mar 2022 |
| Building plan approvalFile: TYPICAL.pdf | 23 Mar 2022 |
| Layout approvalFile: TYPICAL.pdf | 23 Mar 2022 |
| Building plan approvalFile: BASEMENT.pdf | 23 Mar 2022 |
| Building plan approvalFile: ELEVATION.pdf | 23 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: TYPICAL.pdf | 23 Mar 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Kumar Primeview E1P52100052845 | pune, Pune | 239 | Oct 2023 | Ongoing | Dec 2028 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 94 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KUMAR PALMNEST on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PISOLI13,700+ in Pune
Filed coordinates, straight-line distance. 177 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED
KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED has 7 registrations on MahaRERA, including KUMAR PALMCREST A4 BUILDING and KUMAR PALMNEST. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if KUMAR PALMNEST is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KUMAR PALMNEST?
The registered promoter entity is KUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED, a company as per the filing. Its CIN U45200PN2013PTC147354 and GSTIN 27AAFCK1688N1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KUMAR PALMNEST?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KUMAR PALMNEST?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KUMAR PALMNEST?
The professionals named in the filing: Architect: PARVEZ JAMADAR; Architect: SAMEER VALIMBE; Engineer: AKSHAY JAGTAP; Engineer: Mr Abhijeet Shekar; Chartered Accountant: SUPRIYA ABHIJIT MUNDADA; Chartered Accountant: SPAK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KUMAR PALMNEST?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.