Home / Browse projects / Pune, Maharashtra / KP ARCHANA PARADISE PHASE 03

Registered No litigation declared Others project

KP ARCHANA PARADISE PHASE 03

By KANIFNATH PROPERTIES

RG-MH-19331 · RERA P52100078460 · Last updated on MahaRERA portal: 22 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Stilt Floor, 80%
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

KP ARCHANA PARADISE PHASE 03 is a Others project by KANIFNATH PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100078460 on 12 Dec 2024. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameKP ARCHANA PARADISE PHASE 03
  • TypeOthers
  • Location
    • NIBM ANNEX NEAR ARCHANA PARADISE PHASE 01
    • MOHAMADWADI
    • MOHAMMADWADI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • RERA no.P52100078460
  • ReraGenie IDRG-MH-19331

Builder

  • NameKANIFNATH PROPERTIES
  • Entity typePartnership
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects5 →

Key dates

this monthRegisteredDec 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Dec 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building-ANA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.

Building-A: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor80%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed445

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots445
Closed/Covered146
Open Space299

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,800 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
VASANT MAHADU GHULEMOHAMMADWADIPune
BABY VASANT GHULEMOHAMMADWADIPune
SHRIKANT VASANT GHULEMOHAMMADWADIPune

Approvals and building plan

Permissible FSI15200.0
Proposed, not sanctioned15,200 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAGARDEEP HOLEWASTI POST UNDRI PUNE 411060

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
KANIFNATH PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Ph-03.pdf22 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Ph-03_compressed.pdf22 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Ph-03.pdf22 Jul 2025
Disclosure of sold/ booked inventoryFile: ph-03 Sold Unsold Inventory.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Ph-03.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Ph-03.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-03.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Sale Data Ph-03.pdf18 Apr 2025
Building plan approvalFile: new sanction.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: new sanction.pdf4 Apr 2025
Other - LegalFile: Concent.pdf4 Apr 2025
Other - LegalFile: new sanction.pdf4 Apr 2025
Other - TechnicalFile: Concent.pdf4 Apr 2025
Building plan approvalFile: 01.pdf31 Jan 2025
Building plan approvalFile: 02.pdf31 Jan 2025
Building plan approvalFile: 03.pdf31 Jan 2025
Building plan approvalFile: 04.pdf31 Jan 2025
Building plan approvalFile: 05.pdf31 Jan 2025
Building plan approvalFile: 06.pdf31 Jan 2025
Building plan approvalFile: 08.pdf31 Jan 2025
Building plan approvalFile: 09.pdf31 Jan 2025
Building plan approvalFile: 01.pdf31 Jan 2025
Building plan approvalFile: 02.pdf31 Jan 2025
Building plan approvalFile: 03.pdf31 Jan 2025
Building plan approvalFile: 04.pdf31 Jan 2025
Building plan approvalFile: 05.pdf31 Jan 2025
Building plan approvalFile: 06.pdf31 Jan 2025
Building plan approvalFile: 08.pdf31 Jan 2025
Building plan approvalFile: 09.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_compressed (1).pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02 ENG.pdf31 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Final CC_compressed.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 01.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 02.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 03.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 04.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 05.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 06.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 08.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 09.pdf31 Jan 2025
Other - LegalFile: Concent Form.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_compressed (1).pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02 ENG.pdf31 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Final CC_compressed.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 01.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 02.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 03.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 04.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 05.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 06.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 08.pdf31 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 09.pdf31 Jan 2025
Other - LegalFile: Concent Form.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed (4).pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Sale Invantory.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed (4).pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Sale Invantory.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect ph 3.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect ph 3.pdf20 Jan 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER 1.pdf2 Dec 2024
Other - FinanceFile: BANK DECLARATION LANDOWNER.pdf2 Dec 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SELL.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 03.pdf19 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf19 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf19 Nov 2024
Deviation Report with respect to Allotment letterFile: NO DEVATION ALLOTMENT LETTER.pdf12 Nov 2024
Deviation Report with respect to model copy of AgreementFile: nO DEVIATION IN AGREEMENT.pdf12 Nov 2024
Details of encumbrances concerned to FinanceFile: nO ENCUMRANCES.pdf11 Nov 2024
Details of encumbrances concerned to LegalFile: nO ENCUMRANCES.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: sOLD uNSOLD.pdf6 Nov 2024
Other - TechnicalFile: Annexture A.pdf6 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Declaraion secured unsecured.pdf6 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC final.pdf29 Oct 2024
Other - TechnicalFile: annnnn.pdf29 Oct 2024
Copy of the legal title reportFile: Search Report.pdf28 Oct 2024
Details of encumbrances concerned to FinanceFile: Search Report.pdf28 Oct 2024
Details of encumbrances concerned to FinanceFile: Unsecured loan declaration.pdf28 Oct 2024
Details of encumbrances concerned to LegalFile: Unsecured loan declaration.pdf28 Oct 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
ROYAL KP STELLARP52100052077MOHAMADWADI, PuneJul 2023Certificate SignedDec 2027May 2025
ARCHANA PARADISE PHASE II BP52100032116NEAR ARCHANA PARADISE, PuneDec 2021Certificate SignedDec 2025Sep 2023
ARCHANA PARADISE PHASE II AP52100031839NEAR ARCHANA PARADISE, PuneNov 2021Certificate SignedDec 2025Sep 2023
ARCHANA PARADISE WING AP52100026701MOHAMMADWADI, PuneOct 2020Certificate SignedJun 2024Oct 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KP ARCHANA PARADISE PHASE 03 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOHAMADWADI13,700+ in Pune

Builder: KANIFNATH PROPERTIES

KANIFNATH PROPERTIES has 2 registrations on MahaRERA, including KP SQUARE and KP ARCHANA PARADISE PHASE 03. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KP ARCHANA PARADISE PHASE 03 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KP ARCHANA PARADISE PHASE 03?

The registered promoter entity is KANIFNATH PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KP ARCHANA PARADISE PHASE 03?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KP ARCHANA PARADISE PHASE 03?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in KP ARCHANA PARADISE PHASE 03?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KP ARCHANA PARADISE PHASE 03. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KP ARCHANA PARADISE PHASE 03 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.