Home / Browse projects / Mumbai Suburban, Maharashtra / K52
K52
By KOLTE-PATIL DEVELOPERS LIMITED
RG-MH-36050 · RERA P51800047424 · Last updated on MahaRERA portal: 8 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 13 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
K52 is a Residential / Group Housing project by KOLTE-PATIL DEVELOPERS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047424 on 31 Oct 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 14 of the 33 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameK52
- TypeResidential / Group Housing
- Location
- 17TH ROAD
- KHAR WEST
- Greater Mumbai (M Corp.) (Part) (802794)
- Mumbai
- Mumbai Suburban
- 400052
- Pincode400052
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800047424
- ReraGenie IDRG-MH-36050
Builder
- NameKOLTE-PATIL DEVELOPERS LIMITED
- Entity typeCompany
- CINL45200PN1991PLC129428
- GSTIN27AAACK7310G1ZT
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Joint Managing DirectorYashvardhan Rajesh Patil
- Executive DirectorMilind Digambar Kolte
- Other registrations63 more →
- Completed14 of 64
- No longer live10 lapsed, de-registered or revoked
- Declared earlier projects14 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Oct 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Current status
Figures as on 8 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| K52 | NA | 22 | 22 | 33 | 0 | 33 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
K52: 70% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities16
As on 8 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 20% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 70% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Other Fitness centre | Yes | 30% |
Parking filed74
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SUKH NIWAS CO-OP HOUSING SOCIETY LIMITED | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Reza Kabul Architects Private Limited |
| Engineer | JW Consultant LLP |
| Chartered Accountant | Nikita A Bajaj |
| Chartered Accountant | VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS |
| Partner | Role in project |
|---|---|
| KOLTE-PATIL DEVELOPERS LIMITED | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504647 | Inderpal Singh Sahni | KOLTE-PATIL DEVELOPERS LIMITED | 27/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Sep 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect's certificate_K52_1-7-2025.pdf | 8 Dec 2025 |
| Form 2File: Form-2 Sukhniwas.pdf | 8 Dec 2025 |
| Form 3File: Sukhniwas.pdf | 8 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: K52 (SUKH NIWAS) INVENTORY.pdf | 8 Dec 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K52 FORM 3_Signed 1.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K52 Form 2_Signed.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: K52 (SUKH NIWAS) INVENTORY.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Sukhniwas_K52.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sukhniwas K52.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 K52.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sukhniwas.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: K52.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sukh Niwas-K52.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Sukh Niwas-K52.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf | 11 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: golden pebbles - Alora.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sukhniwas k52.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K52.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sukh Niwas.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K52.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K52.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: K52.pdf | 29 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sukhniwas-K52.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sukh Niwas K52.pdf | 20 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf | 18 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate-March-23_ Sukh Niwas.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: SUKH NIWAS RERA.pdf | 20 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sukhniwas K52.pdf | 20 Apr 2023 |
| CERSAI detailsFile: Cersai Details KPDL.pdf | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf | 15 Apr 2023 |
| Building plan approvalFile: Amended_approval_pg_1-compressed.pdf | 7 Apr 2023 |
| Building plan approvalFile: Amended_approval_pg_2-compressed.pdf | 7 Apr 2023 |
| Building plan approvalFile: Amended_approval_pg_3.pdf | 7 Apr 2023 |
| Building plan approvalFile: Amended_approval_pg_4-compressed.pdf | 7 Apr 2023 |
| Building plan approvalFile: Amended_approval_pg_5.pdf | 7 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended_approval_pg_1-compressed.pdf | 7 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended_approval_pg_2-compressed.pdf | 7 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended_approval_pg_3.pdf | 7 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended_approval_pg_4-compressed.pdf | 7 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended_approval_pg_5.pdf | 7 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC SUKH NIWAS 29TH MARCH 2023.pdf | 7 Apr 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement certificate_K52.pdf | 7 Apr 2023 |
| Proforma of Agreement for saleFile: AFS 15032023.pdf | 15 Mar 2023 |
| Proforma of Agreement for saleFile: AFS 21022023.pdf | 21 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC K52.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA K52.pdf | 20 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - K52.pdf | 18 Jan 2023 |
| CERSAI detailsFile: Final File Cersai.pdf | 18 Jan 2023 |
| Other - LegalFile: K52 AFS Part 1.pdf | 27 Oct 2022 |
| Other - LegalFile: K52 AFS Part 2.pdf | 27 Oct 2022 |
| Details of encumbrances concerned to LegalFile: 3-Encumbrance Decl Legal and Litigation.pdf | 29 Sep 2022 |
| CERSAI detailsFile: 5-DECL CERSAI.pdf | 29 Sep 2022 |
| Proforma of Agreement for saleFile: 2-Signed draft of AL.pdf | 29 Sep 2022 |
| Proforma of Allotment letterFile: 2-Signed draft of AL.pdf | 29 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: 4- DECL AFS Deviation.pdf | 29 Sep 2022 |
| CERSAI detailsFile: CERSAI.pdf | 6 Sep 2022 |
| Layout approvalFile: layout_compressed.pdf | 2 Sep 2022 |
| Building plan approvalFile: layout_compressed.pdf | 2 Sep 2022 |
| Copy of Layout Approval (in case of layout)File: layout_compressed.pdf | 2 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: layout_compressed.pdf | 2 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: SELF DECLARATION_deviation allotment.pdf | 2 Sep 2022 |
| PAN CardFile: 1 PAN Card (2).pdf | 1 Sep 2022 |
| Copy of the legal title reportFile: Sukh Niwas Title Report for RERA.pdf | 1 Sep 2022 |
| Details of encumbrances concerned to FinanceFile: Self Declaration Encumbrance K52.pdf | 1 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: K52_FirstCC_signed.pdf | 1 Sep 2022 |
| Declaration about Commencement CertificateFile: K52_commencement_declaration.pdf | 1 Sep 2022 |
| Declaration in FORM BFile: Declaration K52 KPDL RERA.pdf | 1 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K52 Sukh Niwas signed Form 3 (1).pdf | 1 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account K52.pdf | 1 Sep 2022 |
Promoter's earlier projects13
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| EVARAP51800026949 | Borivali, Mumbai Suburban | - | Nov 2020 | Completed | Oct 2024 | Oct 2024 |
| 24K Stargaze - J BuildingP52100027791 | Bavdhan, Pune | - | Jan 2021 | Completed | Jun 2024 | Jun 2024 |
| Western AvenueP52100000917 | Wakad, Pune | - | Jul 2017 | Completed | Dec 2023Registered original: Dec 2022 | Jan 2023 |
| 24K StargazeP52100018473 | Bavdhan, Pune | - | Nov 2018 | Completed | Mar 2023 | Mar 2023 |
| Redevelopment of Jai Vijay CHSL - Phase IP51800004446 | Vile-Parle (East), Mumbai Suburban | - | Aug 2017 | Completed | Sep 2022Registered original: Sep 2019 | Sep 2022 |
| 24K ATRIAP52100000428 | Vishal Nagar, Pimple Nilakh, Pune | - | Jul 2017 | Completed | Dec 2021 | Dec 2021 |
| STARGAZEP52100009722 | Bavadhan BK, Pune | - | Aug 2017 | Completed | Dec 2018 | Dec 2018 |
| Ivy Estate Umang PremierP52100000655 | WAGHOLI, Pune | - | Jul 2017 | Completed | Sep 2018 | Sep 2018 |
| GLITTERATIP52100006257 | Pimpri Chinchawad (M Corp.), Pune | - | Aug 2017 | Completed | Jun 2018 | Jun 2018 |
| GLITTERATI IIP52100000319 | Pimpri Chinchawad (M Corp.), Pune | - | Jul 2017 | Completed | Apr 2018Registered original: Dec 2017 | Apr 2018 |
| Redevelopment of Link Palace Premises Co-Op Soc. Ltd. Phase IP51800008272 | Andheri, Mumbai Suburban | - | Aug 2017 | Completed | Mar 2018Registered original: Dec 2017 | Mar 2018 |
| Glitterati | Pimple Nilakh Pune - 411014 | 187 | - | Completed | Apr 2016 | Apr 2016 |
| City Bay | Dhole-Patil road Pune-411001 | 27 | - | Completed | Apr 2014 | Apr 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 63 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep K52 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHAR WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 310 registered projects within 2 km.
Rustomjee Crescent
KEYVIHAR REALTORS PRIVATE LIMITED
Nebula Empress
M/s Shiv Sai developer
Joy Legend Wing B
Bhavin Jayant Soni
PLATINUM OCEANIC
PLATINUMCORP LIFESCAPES LLP
Venue 52
Wadhwa Dreamscapes Private limited
LA52
Galani Ajwani Developers LLP
See every Mumbai Suburban project, with the district possession charts
Builder: KOLTE-PATIL DEVELOPERS LIMITED
KOLTE-PATIL DEVELOPERS LIMITED has 64 registrations on MahaRERA, including 24K OPULA and 24K ATRIA. Its filings disclose 14 earlier MahaRERA projects: declares 13 of 14 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that K52 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if K52 is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of K52?
The registered promoter entity is KOLTE-PATIL DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200PN1991PLC129428 and GSTIN 27AAACK7310G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in K52?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against K52?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for K52?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at K52?
The professionals named in the filing: Architect: Reza Kabul Architects Private Limited; Engineer: JW Consultant LLP; Chartered Accountant: Nikita A Bajaj; Chartered Accountant: VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in K52?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback