Home / Browse projects / Mumbai Suburban, Maharashtra / K52

Registration lapsed No litigation declared Residential / Group Housing project

K52

By KOLTE-PATIL DEVELOPERS LIMITED

RG-MH-36050 · RERA P51800047424 · Last updated on MahaRERA portal: 8 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 13 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 95%
19 of 33Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

K52 is a Residential / Group Housing project by KOLTE-PATIL DEVELOPERS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047424 on 31 Oct 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 14 of the 33 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameK52
  • TypeResidential / Group Housing
  • Location
    • 17TH ROAD
    • KHAR WEST
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400052
  • Pincode400052
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047424
  • ReraGenie IDRG-MH-36050

Builder

  • NameKOLTE-PATIL DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200PN1991PLC129428
  • GSTIN27AAACK7310G1ZT
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Joint Managing DirectorYashvardhan Rajesh Patil
  • Executive DirectorMilind Digambar Kolte
  • Other registrations63 more →
  • Completed14 of 64
  • No longer live10 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

10 months past promisethis monthRegisteredOct 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Oct 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

42%14 of 33 units booked

Figures as on 8 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
K52NA222233033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

K52: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities16

As on 8 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes20%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Other Fitness centreYes30%

Parking filed74

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots74
Closed/Covered74

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,252 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SUKH NIWAS CO-OP HOUSING SOCIETY LIMITEDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3718.97
Proposed, not sanctioned3,719 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFortune 2000, GF, Bandra Kurla Complex, Bandra East, Mumbai, Maharashtra, 400051

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectReza Kabul Architects Private Limited
EngineerJW Consultant LLP
Chartered AccountantNikita A Bajaj
Chartered AccountantVIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS
PartnerRole in project
KOLTE-PATIL DEVELOPERS LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504647Inderpal Singh SahniKOLTE-PATIL DEVELOPERS LIMITED27/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect's certificate_K52_1-7-2025.pdf8 Dec 2025
Form 2File: Form-2 Sukhniwas.pdf8 Dec 2025
Form 3File: Sukhniwas.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: K52 (SUKH NIWAS) INVENTORY.pdf8 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K52 FORM 3_Signed 1.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K52 Form 2_Signed.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: K52 (SUKH NIWAS) INVENTORY.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Sukhniwas_K52.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sukhniwas K52.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 K52.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sukhniwas.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: K52.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sukh Niwas-K52.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Sukh Niwas-K52.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf11 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: golden pebbles - Alora.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sukhniwas k52.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K52.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sukh Niwas.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K52.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K52.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: K52.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sukhniwas-K52.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sukh Niwas K52.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate-March-23_ Sukh Niwas.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: SUKH NIWAS RERA.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sukhniwas K52.pdf20 Apr 2023
CERSAI detailsFile: Cersai Details KPDL.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K52.pdf15 Apr 2023
Building plan approvalFile: Amended_approval_pg_1-compressed.pdf7 Apr 2023
Building plan approvalFile: Amended_approval_pg_2-compressed.pdf7 Apr 2023
Building plan approvalFile: Amended_approval_pg_3.pdf7 Apr 2023
Building plan approvalFile: Amended_approval_pg_4-compressed.pdf7 Apr 2023
Building plan approvalFile: Amended_approval_pg_5.pdf7 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended_approval_pg_1-compressed.pdf7 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended_approval_pg_2-compressed.pdf7 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended_approval_pg_3.pdf7 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended_approval_pg_4-compressed.pdf7 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended_approval_pg_5.pdf7 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC SUKH NIWAS 29TH MARCH 2023.pdf7 Apr 2023
Declaration about Commencement CertificateFile: Declaration about Commencement certificate_K52.pdf7 Apr 2023
Proforma of Agreement for saleFile: AFS 15032023.pdf15 Mar 2023
Proforma of Agreement for saleFile: AFS 21022023.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC K52.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA K52.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - K52.pdf18 Jan 2023
CERSAI detailsFile: Final File Cersai.pdf18 Jan 2023
Other - LegalFile: K52 AFS Part 1.pdf27 Oct 2022
Other - LegalFile: K52 AFS Part 2.pdf27 Oct 2022
Details of encumbrances concerned to LegalFile: 3-Encumbrance Decl Legal and Litigation.pdf29 Sep 2022
CERSAI detailsFile: 5-DECL CERSAI.pdf29 Sep 2022
Proforma of Agreement for saleFile: 2-Signed draft of AL.pdf29 Sep 2022
Proforma of Allotment letterFile: 2-Signed draft of AL.pdf29 Sep 2022
Deviation Report with respect to model copy of AgreementFile: 4- DECL AFS Deviation.pdf29 Sep 2022
CERSAI detailsFile: CERSAI.pdf6 Sep 2022
Layout approvalFile: layout_compressed.pdf2 Sep 2022
Building plan approvalFile: layout_compressed.pdf2 Sep 2022
Copy of Layout Approval (in case of layout)File: layout_compressed.pdf2 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: layout_compressed.pdf2 Sep 2022
Deviation Report with respect to Allotment letterFile: SELF DECLARATION_deviation allotment.pdf2 Sep 2022
PAN CardFile: 1 PAN Card (2).pdf1 Sep 2022
Copy of the legal title reportFile: Sukh Niwas Title Report for RERA.pdf1 Sep 2022
Details of encumbrances concerned to FinanceFile: Self Declaration Encumbrance K52.pdf1 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: K52_FirstCC_signed.pdf1 Sep 2022
Declaration about Commencement CertificateFile: K52_commencement_declaration.pdf1 Sep 2022
Declaration in FORM BFile: Declaration K52 KPDL RERA.pdf1 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K52 Sukh Niwas signed Form 3 (1).pdf1 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account K52.pdf1 Sep 2022

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

13 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
EVARAP51800026949Borivali, Mumbai Suburban-Nov 2020CompletedOct 2024Oct 2024
24K Stargaze - J BuildingP52100027791Bavdhan, Pune-Jan 2021CompletedJun 2024Jun 2024
Western AvenueP52100000917Wakad, Pune-Jul 2017CompletedDec 2023Registered original: Dec 2022Jan 2023
24K StargazeP52100018473Bavdhan, Pune-Nov 2018CompletedMar 2023Mar 2023
Redevelopment of Jai Vijay CHSL - Phase IP51800004446Vile-Parle (East), Mumbai Suburban-Aug 2017CompletedSep 2022Registered original: Sep 2019Sep 2022
24K ATRIAP52100000428Vishal Nagar, Pimple Nilakh, Pune-Jul 2017CompletedDec 2021Dec 2021
STARGAZEP52100009722Bavadhan BK, Pune-Aug 2017CompletedDec 2018Dec 2018
Ivy Estate Umang PremierP52100000655WAGHOLI, Pune-Jul 2017CompletedSep 2018Sep 2018
GLITTERATIP52100006257Pimpri Chinchawad (M Corp.), Pune-Aug 2017CompletedJun 2018Jun 2018
GLITTERATI IIP52100000319Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedApr 2018Registered original: Dec 2017Apr 2018
Redevelopment of Link Palace Premises Co-Op Soc. Ltd. Phase IP51800008272Andheri, Mumbai Suburban-Aug 2017CompletedMar 2018Registered original: Dec 2017Mar 2018
GlitteratiPimple Nilakh Pune - 411014187-CompletedApr 2016Apr 2016
City BayDhole-Patil road Pune-41100127-CompletedApr 2014Apr 2014

How this compares with Mumbai Suburban

42%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep K52 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHAR WEST6,700+ in Mumbai Suburban

2 kmK52Completed 117Lapsed / revoked 52Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 310 registered projects within 2 km.

Builder: KOLTE-PATIL DEVELOPERS LIMITED

KOLTE-PATIL DEVELOPERS LIMITED has 64 registrations on MahaRERA, including 24K OPULA and 24K ATRIA. Its filings disclose 14 earlier MahaRERA projects: declares 13 of 14 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that K52 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if K52 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of K52?

The registered promoter entity is KOLTE-PATIL DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200PN1991PLC129428 and GSTIN 27AAACK7310G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in K52?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against K52?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for K52?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at K52?

The professionals named in the filing: Architect: Reza Kabul Architects Private Limited; Engineer: JW Consultant LLP; Chartered Accountant: Nikita A Bajaj; Chartered Accountant: VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in K52?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About K52. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save K52 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.