Completed No litigation declared Residential / Group Housing project

Joyville Hinjawadi - I, Phase 5

By Joyville Shapoorji Housing Private Limited

RG-MH-74762 · RERA P52100018500 · Last updated on MahaRERA portal: 17 Oct 2022

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 10 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Joyville Hinjawadi - I, Phase 5 is a Residential / Group Housing project by Joyville Shapoorji Housing Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100018500 on 12 Nov 2018. The registration is recorded completed; possession was promised by 30 Sep 2023. 2 complaints are on record with the regulator.

At a glance

Project

  • NameJoyville Hinjawadi - I, Phase 5
  • TypeResidential / Group Housing
  • Location
    • S.NO. 98/1(P)
    • 98/2
    • 99/1
    • 99/2(P)
    • 99/3(P)
    • 99/4(P)
    • 101/2(P) & 101/3
    • Man Village
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018500
  • ReraGenie IDRG-MH-74762

Builder

  • NameJoyville Shapoorji Housing Private Limited
  • Entity typeCompany
  • CINU70109MH2007PTC166942
  • GSTIN27AACCD9800E1ZV
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsRanjana Agarwal, Subrata Dutta Gupta, Sandeep Awasthi, Anuj Puri, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh, Anuj Puri and 29 more
  • ChairpersonsVenkatesh Gopalkrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan and 1 more
  • Managing DirectorsSriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan and 1 more
  • Other registrations50 more →
  • Completed23 of 51
  • No longer live11 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects14 →

Key dates

this monthRegisteredNov 2018PromisedSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Nov 2018
  • Promised completion30 Sep 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SierraNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Sierra: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 17 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Covered ParkingYes100%
Club HouseYes100%

Parking filed153

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots153
Closed/Covered147
Open Space6

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,916 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10841.62
Proposed, not sanctioned10,842 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Jehagir Building , MG Road, Fort Mumbai 400001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCRYSTAL ARCH
ArchitectAwantika Awasthi and Associates
EngineerG.A. Bhilare Consultants Pvt. Ltd.
Chartered AccountantB R Nagda & Co
PartnerRole in project
Joyville Shapoorji Housing Private Limited-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000106338Sheetal Ramchandra Ganjewar and Ramchandra Ganesh GanjewarJoyville Shapoorji Housing Pvt Ltd09/12/2021
CC005000000279775Joyville Shapoorji Housing Pvt LtdWaseem Ahmed Wasud Kazi12/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Jan 2022

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Phase 5.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: Phase 5.pdf15 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Hinjewadi Plot 1 Phase 5 Signed.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Hinjewadi Plot 1 Phase 5 Signed.pdf29 Sep 2022
Disclosure of sold/ booked inventoryFile: Hinjewadi Phase 5.pdf14 Sep 2022
Disclosure of sold/ booked inventoryFile: Phase5.pdf25 Aug 2022
Disclosure of sold/ booked inventoryFile: Hinjewadi Phase 5.pdf17 Aug 2022
Disclosure of sold/ booked inventoryFile: Phase 5.pdf30 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SIERRA.pdf25 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate 5th Phase - F Mar'22.pdf21 Jul 2022
PAN CardFile: Joyville PAN.pdf20 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Hinjawadi Phase 5 Certificate.pdf20 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Phase - 4.pdf20 Jul 2022
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf13 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate_Sierra_F_Plot 1 -Phase 5_March 22.pdf12 Apr 2022
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf30 Mar 2022
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf10 Mar 2022
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf9 Mar 2022
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf28 Feb 2022
Architect’s Certificate on Completion of Project (Form 4)File: form 4 hinjewadi plot 1 phase 5.pdf25 Feb 2022
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf3 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE phase 1 2 5 B C F summit pinnacle seirra.pdf27 Jan 2022
Certificates of CA (Form 3)File: 202112 RERA Certificate Ph 5 - RERA (002).pdf22 Jan 2022
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf20 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate_Sierra_F_Plot 1 -Phase 5_December 21-compressed.pdf15 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate Pune Sierra - F December '21 R1 5.pdf10 Jan 2022
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf23 Dec 2021
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf15 Dec 2021
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5.pdf2 Dec 2021
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf30 Nov 2021
CERSAI detailsFile: Hinjewadi.pdf30 Nov 2021
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf29 Nov 2021
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf29 Nov 2021
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf29 Nov 2021
Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 5 - PHASE 5.pdf29 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Hinjewadi P1 Phase 5 Annual Certificate and Cover letter.pdf30 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engineer_s Certificate_Sierra_F_Plot 1 -Phase 5_September 21.pdf4 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate_Sierra_F_Plot 1 -Phase 5_September 21.pdf4 Oct 2021
Certificates of CA (Form 3)File: phase5 (1).pdf11 Sep 2021
Disclosure of sold/ booked inventoryFile: Hinjewadi Plot 1 - Phase 5.pdf9 Sep 2021
Disclosure of sold/ booked inventoryFile: Hinjewadi Plot 1-Phase 5.pdf9 Sep 2021
Disclosure of sold/ booked inventoryFile: Hinjewadi Plot 1-Phase 5.pdf5 Sep 2021
Disclosure of sold/ booked inventoryFile: Plot 1-Phase 5.pdf7 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate Pune Sierra - F June'21.pdf14 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate_Sierra_F_Plot 1 -Phase 5_June 21.pdf14 Jul 2021
Certificates of CA (Form 3)File: hinjewadi1phase5 (3)_compressed.pdf26 May 2021
Certificates of CA (Form 3)File: hinjewadi1phase5 (3)_compressed.pdf29 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate Pune Sierra - F March'21.pdf13 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate_Sierra_F_Plot 1 -Phase 5_March 21.pdf13 Apr 2021
Certificates of CA (Form 3)File: hinjewadiphase5 TOWER F_compressed.pdf25 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sierra-F SEPT-20.pdf6 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate Pune Sierra - F.pdf6 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SIERRA-SEPT-20_compressed.pdf6 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Sierra_F_Plot 1 -Phase 5.pdf6 Jan 2021
Annual Audit Report of Statutory CA (Form 5)File: Hinjawadi Phase 5 Certificate.pdf30 Sep 2020
Certificates of CA (Form 3)File: Alpine may 20.pdf31 Aug 2020
Certificates of CA (Form 3)File: Ph 5 sierra_compressed.pdf31 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F1-7-20.pdf21 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PHASE 2_SIERRA_TOWER-F_JUNE 20.pdf21 Aug 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: JSHPL RERA Hinjewadi Phase 5.pdf8 Apr 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SierraF7-1-20.pdf4 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Phase 5 Sierra.pdf4 Feb 2020
Certificates of CA (Form 3)File: pH 6.pdf4 Feb 2020
Certificates of CA (Form 3)File: pH 5.pdf4 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SierraF11-10-19 Phase 5.pdf17 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Phase 5 Engineer.pdf17 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: JSHPL RERA Hinjewadi Phase 5.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph 5 Sierra.pdf20 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph 5 Seirra-compressed.pdf20 Aug 2019
Certificates of CA (Form 3)File: Phase 5 Alpine-compressed.pdf20 Aug 2019
Copy of the legal title reportFile: Joyville Supplemental 26-04-2019.pdf17 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sierra Phase 5_Arch Certi.pdf11 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sierra Phase 5_Arch Certi.pdf11 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sierra Phase 5_Engg Certi_compressed.pdf11 Jun 2019
Certificates of CA (Form 3)File: Ph 5 - 3 RERA TOWER A - Alpine 31st March, 2019_compressed.pdf11 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SierraF25-4-19.pdf7 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SCAN 5_compressed.pdf7 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SCAN 5_compressed.pdf7 Jun 2019
Details of encumbrancesFile: Phase 5.pdf15 Apr 2019
Proforma of Allotment letterFile: AFS Joyville Hinjewadi Plot .pdf22 Feb 2019

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Mahindra Citadel Phase 1P52100047656Pimpri, Pune448Nov 2022OngoingJun 2028Not due yet
Mahindra Happinest Tathawade Phase 2P52100045388Tathawade, Pune314May 2022OngoingMay 2027Not due yet
Nest EWSP52100045279Tathawade, Pune89May 2022OngoingJan 2027Not due yet
Happinest Tathawade Phase-1P52100028049Tathawade, Pune-Jan 2021OngoingJan 2027Not due yet
Centralis Tower 2P52100019393Pimpri, Pune-Jan 2019CompletedAug 2023Aug 2023
Centralis Tower 1P52100019406Pimpri, Pune-Jan 2019CompletedAug 2023Jul 2023
Centralis Tower 4P52100019375Pimpri, Pune-Jan 2019CompletedMar 2023Mar 2023
Centralis Tower 3P52100019407Pimpri, Pune-Jan 2019CompletedMar 2023Mar 2023
Centro MHADAP52100030814Pimpri, Pune-Sep 2021CompletedFeb 2023Feb 2023
Antheia A3P52100000171Pimpri, Pune-Jul 2017CompletedDec 2020Dec 2020
Joyville HowrahKWIC Howrah392-CompletedJun 2020Feb 2020
Antheia B4P52100000281Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedJun 2018Jun 2018
Antheia A4P52100000210Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedJun 2018Jun 2018
Antheia C1P52100000217Pimpri Chinchawad (M Corp.), Pune-Jul 2017CompletedMar 2018Mar 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Joyville Hinjawadi - I, Phase 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Man Village13,700+ in Pune

2 kmJoyville Hinjawadi - I, Completed 21Lapsed / revoked 11Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: Joyville Shapoorji Housing Private Limited

Joyville Shapoorji Housing Private Limited has 51 registrations on MahaRERA, including Joyville Virar Phase 1 and Joyville Virar Phase 2. Its filings disclose 14 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Litigation is declared on 30 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Joyville Hinjawadi - I, Phase 5 is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Joyville Hinjawadi - I, Phase 5?

The registered promoter entity is Joyville Shapoorji Housing Private Limited, a company as per the filing. Its CIN U70109MH2007PTC166942 and GSTIN 27AACCD9800E1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Joyville Hinjawadi - I, Phase 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Joyville Hinjawadi - I, Phase 5?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Joyville Hinjawadi - I, Phase 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Joyville Hinjawadi - I, Phase 5?

The professionals named in the filing: Architect: CRYSTAL ARCH; Architect: Awantika Awasthi and Associates; Engineer: G.A. Bhilare Consultants Pvt. Ltd.; Chartered Accountant: B R Nagda & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Joyville Hinjawadi - I, Phase 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Joyville Hinjawadi - I, Phase 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Joyville Hinjawadi - I, Phase 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.