Home / Browse projects / Pune, Maharashtra / Joyville Hinjawadi - I, Phase 2
Joyville Hinjawadi - I, Phase 2
By Joyville Shapoorji Housing Private Limited
RG-MH-81352 · RERA P52100016252 · Last updated on MahaRERA portal: 17 Oct 2022
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 10 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 50 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Joyville Hinjawadi - I, Phase 2 is a Residential / Group Housing project by Joyville Shapoorji Housing Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100016252 on 25 Apr 2018. The registration is recorded completed; possession was promised by 30 Jun 2023.
At a glance
Project
- NameJoyville Hinjawadi - I, Phase 2
- TypeResidential / Group Housing
- Location
- S.NO. 98/1(P)
- 98/2
- 99/1
- 99/2(P)
- 99/3(P)
- 99/4(P)
- 101/2(P) & 101/3
- Man Village
- Man
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100016252
- ReraGenie IDRG-MH-81352
Builder
- NameJoyville Shapoorji Housing Private Limited
- Entity typeCompany
- CINU70109MH2007PTC166942
- GSTIN27AACCD9800E1ZV
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsRanjana Agarwal, Subrata Dutta Gupta, Sandeep Awasthi, Anuj Puri, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh, Anuj Puri and 29 more
- ChairpersonsVenkatesh Gopalkrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan and 1 more
- Managing DirectorsSriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan and 1 more
- Other registrations50 more →
- Completed23 of 51
- No longer live11 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects14 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Apr 2018
- Promised completion30 Jun 2023
- Revised completionNone
- Buildings1 building record
- Documents filed90 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Pinnacle | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Pinnacle: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities17
As on 17 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
| Covered Parking | Yes | 100% |
| Club House | Yes | 100% |
Parking filed159
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Abhikalpan Architects & Planners |
| Architect | Awantika Awasthi and Associates |
| Chartered Accountant | B R Nagda & Co |
| Partner | Role in project |
|---|---|
| Joyville Shapoorji Housing Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jun 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Aug 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Jan 2022
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Phase 2.pdf | 17 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Phase 2.pdf | 15 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Hinjewadi Plot 1 Phase 2_Final Signed.pdf | 30 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Hinjewadi Plot 1 Phase 2_Final Signed.pdf | 29 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Hinjewadi Phase 2.pdf | 14 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Phase2.pdf | 25 Aug 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Phase2_Tower B.pdf | 25 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Hinjewadi Phase 2.pdf | 17 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Phase 2.pdf | 30 Jul 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Annexure E - Form 4 - Tower B - Plot-1-Phase 2.pdf | 25 Jul 2022 |
| PAN CardFile: Joyville PAN.pdf | 20 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Hinjawadi Phase 2 Certificate.pdf | 20 Jul 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Hinjewadi-Phase 2.pdf | 20 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate _2nd Phase-B Mar'22.pdf | 19 May 2022 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 13 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate_Pinnacle_B_Plot 1 -Phase 2_March 22.pdf | 12 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 30 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 10 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 9 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 28 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 3 Feb 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: joyville hinjewadi pinnacle B 2.pdf | 28 Jan 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE phase 1 2 5 B C F summit pinnacle seirra.pdf | 27 Jan 2022 |
| Certificates of CA (Form 3)File: 202112 RERA Certificate Ph 2 - RERA.pdf | 22 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 20 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate_Pinnacle_B_Plot 1 -Phase 2_December 21-compressed.pdf | 15 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Pinnacle-B December '21 R1 2.pdf | 10 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 23 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 15 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2.pdf | 2 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 30 Nov 2021 |
| CERSAI detailsFile: Hinjewadi.pdf | 30 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 29 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 29 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 29 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Joyville Hinjawadi I,PHASE 2 - PHASE 2.pdf | 29 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Hinjewadi P1 Phase 2 Annual Certificate and Cover letter.pdf | 30 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Pinnacle-B September '21_compressed.pdf | 4 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate_Pinnacle_B_Plot 1 -Phase 2_September 21.pdf | 4 Oct 2021 |
| Certificates of CA (Form 3)File: phase2 (1).pdf | 11 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Hinjewadi Plot 1 - Phase 2.pdf | 9 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Hinjewadi Plot 1-Phase 2.pdf | 9 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Hinjewadi Plot 1 Phase 2.pdf | 5 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Plot 1-Phase 2.pdf | 7 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Pinnacle-B June'21.pdf | 14 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate_Pinnacle_B_Plot 1 -Phase 2_June 21.pdf | 14 Jul 2021 |
| Certificates of CA (Form 3)File: hinjewadi1phase2_compressed.pdf | 26 May 2021 |
| Certificates of CA (Form 3)File: hinjewadi1phase2_compressed.pdf | 29 Apr 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Pinnacle-B March'21.pdf | 13 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate_Pinnacle_B_Plot 1 -Phase 2_March 21.pdf | 13 Apr 2021 |
| Certificates of CA (Form 3)File: hinjewadiphase2 TOWER B_compressed.pdf | 25 Jan 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pinnacle-B SEPT-20.pdf | 6 Jan 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Pune Pinnacle-B_compressed.pdf | 6 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PINNACLE-SEPT-20_compressed.pdf | 6 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Pinnacle_B_Plot 1 -Phase 2.pdf | 6 Jan 2021 |
| Annual Audit Report of Statutory CA (Form 5)File: Hinjawadi Phase 2 Certificate.pdf | 30 Sep 2020 |
| Certificates of CA (Form 3)File: Pinnacle May 20.pdf | 31 Aug 2020 |
| Certificates of CA (Form 3)File: Ph 2 pinnacle_compressed.pdf | 31 Aug 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B1-7-20.pdf | 21 Aug 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PHASE 1_PINNACLE_TOWER-B_JUNE 20.pdf | 21 Aug 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: JSHPL RERA Hinjewadi Phase 2.pdf | 8 Apr 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PinnacleB7-1-20.pdf | 4 Feb 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PinnacleB7-1-20.pdf | 4 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crest - D7-1-20.pdf | 4 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Crest - D7-1-20.pdf | 4 Feb 2020 |
| Certificates of CA (Form 3)File: PH 2.pdf | 4 Feb 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PinnacleB11-10-19 Phase 2.pdf | 17 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Phase 2 Engineer.pdf | 17 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: JSHPL RERA Hinjewadi Phase 2.pdf | 30 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph 2 Pinnacle-compressed.pdf | 20 Aug 2019 |
| Certificates of CA (Form 3)File: Phase 2 pinnacle-compressed.pdf | 20 Aug 2019 |
| Copy of the legal title reportFile: Joyville Supplemental 26-04-2019.pdf | 17 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Pinnacle Phase 2_Engg Certi_compressed.pdf | 11 Jun 2019 |
| Certificates of CA (Form 3)File: Ph 2 - 4 RERA Tower B - Pinnacle 31st March, 2019_compressed.pdf | 11 Jun 2019 |
| Details of encumbrancesFile: Phase 2.pdf | 15 Apr 2019 |
| Proforma of Allotment letterFile: AGREEMENT DRAFT JOYVILLE HINJAWADI.pdf | 24 Sep 2018 |
| Layout approvalFile: Revised Layout approval.pdf | 22 Aug 2018 |
| Copy of Layout Approval (in case of layout)File: Revised Layout approval.pdf | 22 Aug 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Pune CC Upload _v2.pdf | 22 Aug 2018 |
| Building plan approvalFile: Commencement Certificate_1.pdf | 12 Apr 2018 |
Promoter's earlier projects14
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Mahindra Citadel Phase 1P52100047656 | Pimpri, Pune | 448 | Nov 2022 | Ongoing | Jun 2028 | Not due yet |
| Mahindra Happinest Tathawade Phase 2P52100045388 | Tathawade, Pune | 314 | May 2022 | Ongoing | May 2027 | Not due yet |
| Nest EWSP52100045279 | Tathawade, Pune | 89 | May 2022 | Ongoing | Jan 2027 | Not due yet |
| Happinest Tathawade Phase-1P52100028049 | Tathawade, Pune | - | Jan 2021 | Ongoing | Jan 2027 | Not due yet |
| Centralis Tower 2P52100019393 | Pimpri, Pune | - | Jan 2019 | Completed | Aug 2023 | Aug 2023 |
| Centralis Tower 1P52100019406 | Pimpri, Pune | - | Jan 2019 | Completed | Aug 2023 | Jul 2023 |
| Centralis Tower 4P52100019375 | Pimpri, Pune | - | Jan 2019 | Completed | Mar 2023 | Mar 2023 |
| Centralis Tower 3P52100019407 | Pimpri, Pune | - | Jan 2019 | Completed | Mar 2023 | Mar 2023 |
| Centro MHADAP52100030814 | Pimpri, Pune | - | Sep 2021 | Completed | Feb 2023 | Feb 2023 |
| Antheia A3P52100000171 | Pimpri, Pune | - | Jul 2017 | Completed | Dec 2020 | Dec 2020 |
| Joyville Howrah | KWIC Howrah | 392 | - | Completed | Jun 2020 | Feb 2020 |
| Antheia B4P52100000281 | Pimpri Chinchawad (M Corp.), Pune | - | Jul 2017 | Completed | Jun 2018 | Jun 2018 |
| Antheia A4P52100000210 | Pimpri Chinchawad (M Corp.), Pune | - | Jul 2017 | Completed | Jun 2018 | Jun 2018 |
| Antheia C1P52100000217 | Pimpri Chinchawad (M Corp.), Pune | - | Jul 2017 | Completed | Mar 2018 | Mar 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 50 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
Keep Joyville Hinjawadi - I, Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Man Village13,700+ in Pune
Filed coordinates, straight-line distance. 62 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Joyville Shapoorji Housing Private Limited
Joyville Shapoorji Housing Private Limited has 51 registrations on MahaRERA, including Joyville Virar Phase 1 and Joyville Virar Phase 2. Its filings disclose 14 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Litigation is declared on 30 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Joyville Hinjawadi - I, Phase 2 is delayed beyond 30 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Joyville Hinjawadi - I, Phase 2?
The registered promoter entity is Joyville Shapoorji Housing Private Limited, a company as per the filing. Its CIN U70109MH2007PTC166942 and GSTIN 27AACCD9800E1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Joyville Hinjawadi - I, Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Joyville Hinjawadi - I, Phase 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Joyville Hinjawadi - I, Phase 2?
The professionals named in the filing: Architect: Abhikalpan Architects & Planners; Architect: Awantika Awasthi and Associates; Chartered Accountant: B R Nagda & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Joyville Hinjawadi - I, Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback