Home / Browse projects / Pune, Maharashtra / Joyville Hadapsar Annexe Retail
Joyville Hadapsar Annexe Retail
By Joyville Shapoorji Housing Private Limited
RG-MH-33326 · RERA P52100080679 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 10 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 50 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Joyville Hadapsar Annexe Retail is a Commercial project by Joyville Shapoorji Housing Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100080679 on 25 Jun 2025. Possession is promised by 31 Oct 2027. 12 of the 14 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameJoyville Hadapsar Annexe Retail
- TypeCommercial
- Location
- Off Pune Solapur Highway
- Shewalwadi
- Shewalewadi
- Haveli
- Pune
- 412307
- Pincode412307
- RERA no.P52100080679
- ReraGenie IDRG-MH-33326
Builder
- NameJoyville Shapoorji Housing Private Limited
- Entity typeCompany
- CINU70109MH2007PTC166942
- GSTIN27AACCD9800E1ZV
- DirectorsSandeep Awasthi, Anuj Puri, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh, Anuj Puri, Sandeep Awasthi, Ashish Singh and 27 more
- ChairpersonsVenkatesh Gopalkrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan, Venkatesh Gopalakrishnan and 1 more
- Managing DirectorsSriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan, Sriram Mahadevan and 1 more
- Other registrations50 more →
- Completed23 of 51
- No longer live11 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects14 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Jun 2025
- Promised completion31 Oct 2027
- Revised completionNone
- Buildings1 building record
- Documents filed61 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RETAIL | NA | 2 | 2 | 0 | 14 | 14 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
RETAIL: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RETAIL | NA | Rs 1.65 cr | Rs 34.18 lakh |
| - | NA | Rs 34.66 lakh | Rs 15.82 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MSK Architects and Associates |
| Architect | MSK Arch and Associates |
| Engineer | Akshay Kasar |
| Engineer | Mr Akshay Lalit Kasar |
| Chartered Accountant | Bhavesh Ramesh Nagda |
| Chartered Accountant | B R Nagda & Co |
| Chartered Accountant | M S K C and Associates LLP |
| Partner | Role in project |
|---|---|
| Joyville Shapoorji Housing Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jun 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2027
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Joyville Hadapsar Annex_Retail.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Hadapsar Annex_Phase_Retail Building_April 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: 202603 RERA Certificate Joyville Hadapsar Annex Retail - RERA.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1_Joyville Hadapsar Annex_Retail Building.pdf | 24 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2_Hadapsar Annex_Retail Building _December 25.pdf | 24 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_CA Certificate Joyville Hadapsar Annex Retail - RERA.pdf | 24 Jan 2026 |
| Withdrawal Update Form 1File: Form 1_Joyville Hadapsar Annex_Retail.pdf | 21 Oct 2025 |
| Withdrawal Update Form 2File: Engineer_s Certificate_Hadapsar Annex_Retail Building _Sept 25.pdf | 21 Oct 2025 |
| Withdrawal Update Form 3File: 202509 RERA Certificate Joyville Hadapsar Annex Retail - RERA.pdf | 21 Oct 2025 |
| Withdrawal Update Form 1File: Form 1_Joyville Hadapsar Annex_Retail Building_June 25.pdf | 13 Aug 2025 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate_Hadapsar Annex_Retail Building_June 25.pdf | 13 Aug 2025 |
| Withdrawal Update Form 3File: 202506 RERA Certificate Joyville Hadapsar Annex Retail - RERA.pdf | 13 Aug 2025 |
| Withdrawal Update Form 1File: Form 1_Joyville Hadapsar Annex_Retail Building_June 25.pdf | 12 Aug 2025 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate_Hadapsar Annex_Retail Building_June 25.pdf | 12 Aug 2025 |
| Withdrawal Update Form 3File: 202506 RERA Certificate Joyville Hadapsar Annex Retail - RERA.pdf | 12 Aug 2025 |
| Withdrawal Update Form 1File: Form 1_Joyville Hadapsar Annex_Retail Building_June 25.pdf | 4 Aug 2025 |
| Withdrawal Update Form 1File: Form 1_Joyville Hadapsar Annex_Retail Building_June 25.pdf | 4 Aug 2025 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate_Hadapsar Annex_Retail Building_June 25.pdf | 4 Aug 2025 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate_Hadapsar Annex_Retail Building_June 25.pdf | 4 Aug 2025 |
| Withdrawal Update Form 3File: 202506 RERA Certificate Joyville Hadapsar Annex Retail - RERA.pdf | 4 Aug 2025 |
| Withdrawal Update Form 3File: 202506 RERA Certificate Joyville Hadapsar Annex Retail - RERA.pdf | 4 Aug 2025 |
| Form 1File: Form 1_Joyville Hadapsar Annex_Retail Building_June 25.pdf | 17 Jul 2025 |
| Form 2File: Engineer's Certificate_Hadapsar Annex_Retail Building_June 25.pdf | 17 Jul 2025 |
| Form 3File: 202506 RERA Certificate Joyville Hadapsar Annex Retail - RERA.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Joyville Hadapsar Annexe Retail.pdf | 17 Jul 2025 |
| Copy of the legal title reportFile: 1 Revised RERA Title Report 12062025.pdf | 13 Jun 2025 |
| Copy of the legal title reportFile: 2 Revised RERA Title Report 12062025.pdf | 13 Jun 2025 |
| Other - LegalFile: Declaration for Title.pdf | 13 Jun 2025 |
| Other - LegalFile: Supplementary Agreement (23119 of 2024) dtd 30-12-2024-71-88.pdf | 10 Apr 2025 |
| Other - LegalFile: Supplementary Agreement (23119 of 2024) dtd 30-12-2024-51-70.pdf | 10 Apr 2025 |
| Other - LegalFile: Supplementary Agreement (23119 of 2024) dtd 30-12-2024-1-25.pdf | 10 Apr 2025 |
| Other - LegalFile: Supplementary Agreement (23119 of 2024) dtd 30-12-2024-26-50.pdf | 10 Apr 2025 |
| Other - FinanceFile: Declaration_RERA Not opening separate bank account by landowner.pdf | 10 Apr 2025 |
| Other - TechnicalFile: Survey nos declaration Retail 24042025.pdf | 10 Apr 2025 |
| Other - LegalFile: Survey nos declaration Retail 24042025.pdf | 1 Apr 2025 |
| Other - FinanceFile: Survey nos declaration Retail 24042025.pdf | 1 Apr 2025 |
| Other - TechnicalFile: Plot area less than 500 Declaration.pdf | 1 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS Retail (Manjri Plot 1) 24-04-2025.pdf | 28 Mar 2025 |
| Other - FinanceFile: Declaration_RERA no revenue area share 10-03-2025.pdf | 27 Mar 2025 |
| Other - TechnicalFile: Annexure A.pdf | 27 Mar 2025 |
| Proforma of Agreement for saleFile: AFS Retail (Manjri Plot 1) 12-06-2025.pdf | 27 Mar 2025 |
| Declaration about Commencement CertificateFile: CC Declaration format D.pdf | 25 Mar 2025 |
| Layout approvalFile: Layout.pdf | 12 Mar 2025 |
| Building plan approvalFile: Manjri Retail.pdf | 12 Mar 2025 |
| PAN CardFile: PAN Card.pdf | 12 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance certificate 29042025.pdf | 12 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 12 Mar 2025 |
| Proforma of Allotment letterFile: Allotment letter Hadapsar(Retail) 27-03-2025 (13-06-2025).pdf | 12 Mar 2025 |
| Declaration in FORM BFile: Form B_JSHPL.pdf | 12 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Joyville Hadapsar Annex_Retail.pdf | 12 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised CA Certificate Joyville Hadapsar Annex Retail 18042025.pdf | 12 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_Hadapsar Annex_Retail Building_February 25.pdf | 12 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 12 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Manjri Retail.pdf | 12 Mar 2025 |
| CERSAI detailsFile: Cersai Declaration 29042025.pdf | 12 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf | 12 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Retail (Manjri Plot 1) 24-04-2025.pdf | 12 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance certificate 29042025.pdf | 12 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: RERA Disclosure of Interest 12122024_upload.pdf | 12 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Joyville Hadapsar Annexe Retail.pdf | 12 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of secured and unsecured finance.pdf | 12 Mar 2025 |
Promoter's earlier projects14
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Mahindra Citadel Phase 1P52100047656 | Pimpri, Pune | 448 | Nov 2022 | Ongoing | Jun 2028 | Not due yet |
| Mahindra Happinest Tathawade Phase 2P52100045388 | Tathawade, Pune | 314 | May 2022 | Ongoing | May 2027 | Not due yet |
| Nest EWSP52100045279 | Tathawade, Pune | 89 | May 2022 | Ongoing | Jan 2027 | Not due yet |
| Happinest Tathawade Phase-1P52100028049 | Tathawade, Pune | - | Jan 2021 | Ongoing | Jan 2027 | Not due yet |
| Centralis Tower 2P52100019393 | Pimpri, Pune | - | Jan 2019 | Completed | Aug 2023 | Aug 2023 |
| Centralis Tower 1P52100019406 | Pimpri, Pune | - | Jan 2019 | Completed | Aug 2023 | Jul 2023 |
| Centralis Tower 4P52100019375 | Pimpri, Pune | - | Jan 2019 | Completed | Mar 2023 | Mar 2023 |
| Centralis Tower 3P52100019407 | Pimpri, Pune | - | Jan 2019 | Completed | Mar 2023 | Mar 2023 |
| Centro MHADAP52100030814 | Pimpri, Pune | - | Sep 2021 | Completed | Feb 2023 | Feb 2023 |
| Antheia A3P52100000171 | Pimpri, Pune | - | Jul 2017 | Completed | Dec 2020 | Dec 2020 |
| Joyville Howrah | KWIC Howrah | 392 | - | Completed | Jun 2020 | Feb 2020 |
| Antheia B4P52100000281 | Pimpri Chinchawad (M Corp.), Pune | - | Jul 2017 | Completed | Jun 2018 | Jun 2018 |
| Antheia A4P52100000210 | Pimpri Chinchawad (M Corp.), Pune | - | Jul 2017 | Completed | Jun 2018 | Jun 2018 |
| Antheia C1P52100000217 | Pimpri Chinchawad (M Corp.), Pune | - | Jul 2017 | Completed | Mar 2018 | Mar 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 50 other registrations, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Joyville Hadapsar Annexe Retail on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shewalwadi13,700+ in Pune
MAGNACITY - Tower A2
Malnad Project (I) Pvt Ltd
Birla Evam Phase 1
Vypak Properties Private Limited
VTP AURELIA PHASE 1
ASOJ REALTY LLP
GODREJ BOULEVARD
Manjari Housing Projects LLP
Godrej Park Springs
Manjari Housing Projects LLP
VTP DOLCE VITA Phase 1
Ashdan Developers Private Limited
Builder: Joyville Shapoorji Housing Private Limited
Joyville Shapoorji Housing Private Limited has 51 registrations on MahaRERA, including Joyville Virar Phase 1 and Joyville Virar Phase 2. Its filings disclose 14 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Litigation is declared on 30 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Joyville Hadapsar Annexe Retail is delayed beyond 31 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Joyville Hadapsar Annexe Retail?
The registered promoter entity is Joyville Shapoorji Housing Private Limited, a company as per the filing. Its CIN U70109MH2007PTC166942 and GSTIN 27AACCD9800E1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Joyville Hadapsar Annexe Retail?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Joyville Hadapsar Annexe Retail?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Joyville Hadapsar Annexe Retail?
The professionals named in the filing: Architect: MSK Architects and Associates; Architect: MSK Arch and Associates; Engineer: Akshay Kasar; Engineer: Mr Akshay Lalit Kasar; Chartered Accountant: Bhavesh Ramesh Nagda; Chartered Accountant: B R Nagda & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Joyville Hadapsar Annexe Retail?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback