Home / Browse projects / Pune, Maharashtra / VTP DOLCE VITA Phase 1
VTP DOLCE VITA Phase 1
By Ashdan Developers Private Limited
RG-MH-95126 · RERA P52100051819 · Last updated on MahaRERA portal: 18 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
- 15 complaints at MahaRERA
- Rs 285.00 crore secured on the land, in favour of Kotak Mahindra Bank Aditya Birla Finance Limited Oxyzo Financial Services Limited
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VTP DOLCE VITA Phase 1 is a Others project by Ashdan Developers Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100051819 on 7 Jul 2023. Possession is promised by 31 Dec 2028. 668 of the 736 units on this registration are recorded sold or booked, and 16 of 44 construction stages are filed complete. 15 complaints are on record with the regulator.
At a glance
Project
- NameVTP DOLCE VITA Phase 1
- TypeOthers
- Location
- Awhal Wadi Road
- Manjari Kh
- Haveli
- Pune
- 412307
- Pincode412307
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051819
- ReraGenie IDRG-MH-95126
Builder
- NameAshdan Developers Private Limited
- Entity typeCompany
- DirectorsBhushan Vilas Kumar Palresha, Nilesh Vilas Kumar Palresha, Meena Manohar Karne, Anil Shantilal Kankariya
- Other registrations15 more →
- Completed4 of 16
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Jul 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings4 building records
- Documents filed133 files
Current status
Figures as on 18 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | NA | 35 | 32 | 192 | 0 | 192 |
| Tower 2 | NA | 35 | 33 | 192 | 11 | 203 |
| Tower 3 | NA | 35 | 33 | 128 | 9 | 137 |
| Tower 4 | NA | 36 | 33 | 192 | 12 | 204 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 77%.
Tower 145%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 74% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 26% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower 246%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 77% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 28% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower 345%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 69% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 22% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower 443%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 18% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 48% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed704
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Tower 1 | 192 | 0 | 192 |
| Tower 2 | 128 | 64 | 192 |
| Tower 3 | 128 | 0 | 128 |
| Tower 4 | 192 | 0 | 192 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower 1 | NA | Rs 75.06 cr | Rs 37.53 cr |
| Tower 2 | NA | Rs 74.53 cr | Rs 37.88 cr |
| Tower 3 | NA | Rs 73.12 cr | Rs 36.87 cr |
| Tower 4 | NA | Rs 70.65 cr | Rs 35.89 cr |
| - | NA | Rs 31.10 cr | Rs 25.87 cr |
Certifying professionals and partners10
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VKe |
| Architect | VKa architecture |
| Architect | ANA Consortium Pvt Ltd |
| Engineer | NAUSHAD SHIKHALKAR |
| Engineer | Babu Aakarrapu |
| Engineer | GIRISH AWINASHE |
| Chartered Accountant | Amit Satish Shingvi |
| Chartered Accountant | SPAK & CO |
| Chartered Accountant | PRIAYANKA CHORDIYA AND ASSOCIATES |
| Chartered Accountant | SUNIL SHAHA |
| Partner | Role in project |
|---|---|
| Ashdan Developers Private Limited | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 494/2008 | Civil Judge Senior Division Pune | Pending |
| 479/2008 | Bombay High Court | Ongoing |
| 494/2008 | JOINT C.J.S.D AND ADDL C.J.M PUNE | Ongoing |
Complaints filed with MahaRERA15
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000269614 | Kumar Abhishek | VTP Realty Ashdhan Developers Pvt ltd | 18/10/2023 |
| CC12400732 | Ashdan Developers Private Limited | NASIR NANHUMIYA SAYYAD | 11/11/2024 |
| CC12400733 | Ashdan Developers Private Limited | SHILPA ARVIND TUPE (ALLOTTEE) | 11/11/2024 |
| CC12400734 | Ashdan Developers Private Limited | SUJATA ROHIT JAGTAP (ALLOTTEE) | 11/11/2024 |
| CC12500958 | Ashdan Developers Private Limited | Prashant Patil (Allottee) | 19/03/2025 |
| CC12500959 | Ashdan Developers Private Limited | Prashant Patil (Allottee) | 19/03/2025 |
| CC12500960 | Ashdan Developers Private Limited | Arun Mohanrao Rasal (Allottee) | 19/03/2025 |
| CC12600580 | Ashdan Developers Private Limited | Mrs Shilpa Arvind Tupe | 02/02/2026 |
| CC12600583 | Ashdan Developers Private Limited | Mrs Sujata Rohit Jagtap | 02/02/2026 |
| CC12601215 | Ashdan Developers Private Limited | MR PRASHANT PATIL (ALLOTTEE) | 06/03/2026 |
| CC12601216 | Ashdan Developers Private Limited | MR PRASHANT PATIL(ALLOTTEE) | 06/03/2026 |
| CC12601218 | Ashdan Developers Private Limited | MD SULTAN AHMAD (allottee) | 06/03/2026 |
| CC12604634 | Ashdan Developers Private Limited | ANIKET SANJAY TALEGAONKAR (Allottee) | 24/07/2026 |
| CC12604985 | Ashdan Developers Private Limited | ARUN MOHANRAO RASAL (Allottee) | 06/08/2026 |
| CC12604986 | Ashdan Developers Private Limited | MRS PRIYA BENJAMIN KADAM (ALLOTTEE) | 06/08/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed133
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 Dolce phase 1 07072026.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 Dolce Ph 1 30062026.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 DOCLE PH 1 30062026.pdf | 18 Jul 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A DOLCE PHASE 1.pdf | 17 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 Dolce Vita Ph 1 07042026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 DOLCE PH 1 30032026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Dolce Ph 1 Form 3 30032026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 Dolce Vita Phase 1 08012026.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 Dolce Phase 1 20122025.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 Dolce VIta ph 1 31122025.pdf | 17 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 DOLCE VITA PHASE 1.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 DOLCE VITA PHASE 1 -.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: form 3 dolce ph 1.pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_Dolce Vita Phase 1 FY 24-25_sign copy.pdf | 30 Sep 2025 |
| Form 2A (FY 2024-2025)File: FORMA 2A DOLCE VITA PHASE 1.pdf | 30 Jun 2025 |
| Form 1File: FORM 1 DOLCE VITA PHASE 1 31032025.pdf | 27 Jun 2025 |
| Form 2File: Form 2 Dolce Vita Ph 1.pdf | 27 Jun 2025 |
| Form 3File: Form 3 Dolce VIta Ph 1.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DOLCE PH1 31032025.pdf | 27 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE VITA PHASE 1 UPDATED.pdf | 13 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dolce Vita Ph 1.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dolce VIta Ph 1.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE VITA PHASE 1 31032025.pdf | 12 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DOLCE PH1 31032025.pdf | 7 Apr 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK FORMAT A - Dolce Vita Phase 1.pdf | 25 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK FORMAT B PHASE 1.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DOLCE VITA PH1 31122024.pdf | 20 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance wrt finance Dolce Vita Phase 1_11022025.pdf | 11 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance wrt finance Dolce Vita Phase 1_11022025.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE VITA PHASE 1 31122024.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE VITA PHASE 2 31122024-1-13.pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE VITA PHASE 2 31122024-14-34.pdf | 21 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DOLCE VITA PHASE 1 31212024.pdf | 14 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DOLCE VITA PHASE 1 18102024.pdf | 28 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Vtp dolce vita phase 1 18-09-2024_11zon.pdf | 12 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 VTP DOLCE VITA PHASE 1 31-03-2024_11zon.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE VITA PH 1 241016.pdf | 26 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DOLCE PH1 30092024.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DOLCE VITA PH 1 27062024.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE VITA PH 1 27062024_compressed.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 260624 DolceVita P 1.pdf | 6 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: VTP Dolce Vita P 1 30062024.pdf | 5 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY DOLCE VITA PHASE 1 31122023.pdf | 18 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A DOLCE VITA PHASE 1 31032024.pdf | 16 May 2024 |
| Disclosure of sold/ booked inventoryFile: DOLCE VITA PHASE 1 - INVENTORY 31032024.pdf | 26 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Coomencement Certificate.pdf | 24 Apr 2024 |
| Declaration about Commencement CertificateFile: FORMAT D - DOLCE VITA PHASE 1.pdf | 24 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DOLCE VITA PHASE 1 25032024.pdf | 24 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dolce Vita Phase - I 25032024.pdf | 24 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE VITA PHASE 1 31032024.pdf | 4 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE VITA PHASE 1 02022024.pdf | 26 Mar 2024 |
| Layout approvalFile: Sanctioned Layout Dolce phase 1.pdf | 20 Mar 2024 |
| Building plan approvalFile: 07-48.pdf | 20 Mar 2024 |
| Building plan approvalFile: 08-48.pdf | 20 Mar 2024 |
| Building plan approvalFile: 10-48.pdf | 20 Mar 2024 |
| Building plan approvalFile: 11-48.pdf | 20 Mar 2024 |
| Building plan approvalFile: 12-48.pdf | 20 Mar 2024 |
| Building plan approvalFile: 15-48.pdf | 20 Mar 2024 |
| Building plan approvalFile: 16-48.pdf | 20 Mar 2024 |
| Building plan approvalFile: 18-48.pdf | 20 Mar 2024 |
| Building plan approvalFile: 19-48.pdf | 20 Mar 2024 |
| Building plan approvalFile: 20-48.pdf | 20 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: Sanctioned Layout Dolce phase 1.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 07-48.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 08-48.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10-48.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 11-48.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 12-48.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 15-48.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 16-48.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 18-48.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 19-48.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 20-48.pdf | 20 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP DOLCE VITA 02022024.pdf | 20 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE VITA 24112023.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE 31122023.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DOLCE VITA 31122023.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP Dolce Vita 23112023.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE 31122023.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE 10092023.pdf | 7 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 15 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 133 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VTP DOLCE VITA Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Manjari Kh13,700+ in Pune
Filed coordinates, straight-line distance. 44 registered projects within 2 km.
MAGNACITY - Tower A2
Malnad Project (I) Pvt Ltd
Birla Evam Phase 1
Vypak Properties Private Limited
VTP AURELIA PHASE 1
ASOJ REALTY LLP
GODREJ BOULEVARD
Manjari Housing Projects LLP
Godrej Park Springs
Manjari Housing Projects LLP
VTP EUPHORIA PHASE 3
ASHDAN DEVELOPERS PRIVATE LIMITED
Builder: Ashdan Developers Private Limited
Ashdan Developers Private Limited has 16 registrations on MahaRERA, including Vtp Cygnus- Nation R1-Tower 9 and VTP Beaumonde-Nation R2 T1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 9 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VTP DOLCE VITA Phase 1 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VTP DOLCE VITA Phase 1?
The registered promoter entity is Ashdan Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VTP DOLCE VITA Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VTP DOLCE VITA Phase 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VTP DOLCE VITA Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VTP DOLCE VITA Phase 1?
The professionals named in the filing: Architect: VKe; Architect: VKa architecture; Architect: ANA Consortium Pvt Ltd; Engineer: NAUSHAD SHIKHALKAR; Engineer: Babu Aakarrapu; Engineer: GIRISH AWINASHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VTP DOLCE VITA Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback