Home / Browse projects / Pune, Maharashtra / VTP DOLCE VITA Phase 1

Registered Litigation declared Others project

VTP DOLCE VITA Phase 1

By Ashdan Developers Private Limited

RG-MH-95126 · RERA P52100051819 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • 15 complaints at MahaRERA
  • Rs 285.00 crore secured on the land, in favour of Kotak Mahindra Bank Aditya Birla Finance Limited Oxyzo Financial Services Limited

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
16 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 77%
68 of 736Units unsoldnot recorded sold or booked
15Complaints at MahaRERAon this registration
Jump to the 133 documents Report an error

VTP DOLCE VITA Phase 1 is a Others project by Ashdan Developers Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100051819 on 7 Jul 2023. Possession is promised by 31 Dec 2028. 668 of the 736 units on this registration are recorded sold or booked, and 16 of 44 construction stages are filed complete. 15 complaints are on record with the regulator.

At a glance

Project

  • NameVTP DOLCE VITA Phase 1
  • TypeOthers
  • Location
    • Awhal Wadi Road
    • Manjari Kh
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051819
  • ReraGenie IDRG-MH-95126

Builder

  • NameAshdan Developers Private Limited
  • Entity typeCompany
  • DirectorsBhushan Vilas Kumar Palresha, Nilesh Vilas Kumar Palresha, Meena Manohar Karne, Anil Shantilal Kankariya
  • Other registrations15 more →
  • Completed4 of 16
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jul 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed133 files

Current status

91%668 of 736 units booked
53.6%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1NA35321920192
Tower 2NA353319211203
Tower 3NA35331289137
Tower 4NA363319212204

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 77%.

Tower 145%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure74%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises26%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 246%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises28%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 345%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure69%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises22%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 443%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes48%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed704

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots704
Closed/Covered640
Open Space64
BuildingClosed/CoveredOpen SpaceTotal
Tower 11920192
Tower 212864192
Tower 31280128
Tower 41920192

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,425 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofKotak Mahindra Bank Aditya Birla Finance Limited Oxyzo Financial Services Limited
Secured amountRs 285.00 crore
CERSAI search filedYes
Declared on10 Sep 2025

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY
Permissible FSI84056.41
Proposed, not sanctioned84,056 sq m
Buildings approved10
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRamwadi, Pune
Estimated costRs 324.46 cr
Cost incurredRs 174.04 cr
Work done53.64%
BuildingWingEstimatedIncurred
Tower 1NARs 75.06 crRs 37.53 cr
Tower 2NARs 74.53 crRs 37.88 cr
Tower 3NARs 73.12 crRs 36.87 cr
Tower 4NARs 70.65 crRs 35.89 cr
-NARs 31.10 crRs 25.87 cr

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVKe
ArchitectVKa architecture
ArchitectANA Consortium Pvt Ltd
EngineerNAUSHAD SHIKHALKAR
EngineerBabu Aakarrapu
EngineerGIRISH AWINASHE
Chartered AccountantAmit Satish Shingvi
Chartered AccountantSPAK & CO
Chartered AccountantPRIAYANKA CHORDIYA AND ASSOCIATES
Chartered AccountantSUNIL SHAHA
PartnerRole in project
Ashdan Developers Private Limited-

Litigation declared3

CaseCourtStatus
494/2008Civil Judge Senior Division PunePending
479/2008Bombay High CourtOngoing
494/2008JOINT C.J.S.D AND ADDL C.J.M PUNEOngoing

Complaints filed with MahaRERA15

Case no.ComplainantRespondentFiled
CC005000000269614Kumar AbhishekVTP Realty Ashdhan Developers Pvt ltd18/10/2023
CC12400732Ashdan Developers Private LimitedNASIR NANHUMIYA SAYYAD11/11/2024
CC12400733Ashdan Developers Private LimitedSHILPA ARVIND TUPE (ALLOTTEE)11/11/2024
CC12400734Ashdan Developers Private LimitedSUJATA ROHIT JAGTAP (ALLOTTEE)11/11/2024
CC12500958Ashdan Developers Private LimitedPrashant Patil (Allottee)19/03/2025
CC12500959Ashdan Developers Private LimitedPrashant Patil (Allottee)19/03/2025
CC12500960Ashdan Developers Private LimitedArun Mohanrao Rasal (Allottee)19/03/2025
CC12600580Ashdan Developers Private LimitedMrs Shilpa Arvind Tupe02/02/2026
CC12600583Ashdan Developers Private LimitedMrs Sujata Rohit Jagtap02/02/2026
CC12601215Ashdan Developers Private LimitedMR PRASHANT PATIL (ALLOTTEE)06/03/2026
CC12601216Ashdan Developers Private LimitedMR PRASHANT PATIL(ALLOTTEE)06/03/2026
CC12601218Ashdan Developers Private LimitedMD SULTAN AHMAD (allottee)06/03/2026
CC12604634Ashdan Developers Private LimitedANIKET SANJAY TALEGAONKAR (Allottee)24/07/2026
CC12604985Ashdan Developers Private LimitedARUN MOHANRAO RASAL (Allottee)06/08/2026
CC12604986Ashdan Developers Private LimitedMRS PRIYA BENJAMIN KADAM (ALLOTTEE)06/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed133

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Dolce phase 1 07072026.pdf18 Jul 2026
Withdrawal Update Form 2File: FORM 2 Dolce Ph 1 30062026.pdf18 Jul 2026
Withdrawal Update Form 3File: FORM 3 DOCLE PH 1 30062026.pdf18 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A DOLCE PHASE 1.pdf17 Jun 2026
Withdrawal Update Form 1File: FORM 1 Dolce Vita Ph 1 07042026.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2 DOLCE PH 1 30032026.pdf20 Apr 2026
Withdrawal Update Form 3File: Dolce Ph 1 Form 3 30032026.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 Dolce Vita Phase 1 08012026.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2 Dolce Phase 1 20122025.pdf17 Jan 2026
Withdrawal Update Form 3File: FORM 3 Dolce VIta ph 1 31122025.pdf17 Jan 2026
Withdrawal Update Form 1File: FORM 1 DOLCE VITA PHASE 1.pdf18 Oct 2025
Withdrawal Update Form 2File: FORM 2 DOLCE VITA PHASE 1 -.pdf18 Oct 2025
Withdrawal Update Form 3File: form 3 dolce ph 1.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_Dolce Vita Phase 1 FY 24-25_sign copy.pdf30 Sep 2025
Form 2A (FY 2024-2025)File: FORMA 2A DOLCE VITA PHASE 1.pdf30 Jun 2025
Form 1File: FORM 1 DOLCE VITA PHASE 1 31032025.pdf27 Jun 2025
Form 2File: Form 2 Dolce Vita Ph 1.pdf27 Jun 2025
Form 3File: Form 3 Dolce VIta Ph 1.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: DOLCE PH1 31032025.pdf27 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE VITA PHASE 1 UPDATED.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dolce Vita Ph 1.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dolce VIta Ph 1.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE VITA PHASE 1 31032025.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: DOLCE PH1 31032025.pdf7 Apr 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK FORMAT A - Dolce Vita Phase 1.pdf25 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK FORMAT B PHASE 1.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DOLCE VITA PH1 31122024.pdf20 Feb 2025
Details of encumbrances concerned to FinanceFile: Encumbrance wrt finance Dolce Vita Phase 1_11022025.pdf11 Feb 2025
Details of encumbrances concerned to LegalFile: Encumbrance wrt finance Dolce Vita Phase 1_11022025.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE VITA PHASE 1 31122024.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE VITA PHASE 2 31122024-1-13.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE VITA PHASE 2 31122024-14-34.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: DOLCE VITA PHASE 1 31212024.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DOLCE VITA PHASE 1 18102024.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Vtp dolce vita phase 1 18-09-2024_11zon.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 VTP DOLCE VITA PHASE 1 31-03-2024_11zon.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE VITA PH 1 241016.pdf26 Oct 2024
Disclosure of sold/ booked inventoryFile: DOLCE PH1 30092024.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DOLCE VITA PH 1 27062024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE VITA PH 1 27062024_compressed.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 260624 DolceVita P 1.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: VTP Dolce Vita P 1 30062024.pdf5 Jul 2024
Disclosure of sold/ booked inventoryFile: INVENTORY DOLCE VITA PHASE 1 31122023.pdf18 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A DOLCE VITA PHASE 1 31032024.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: DOLCE VITA PHASE 1 - INVENTORY 31032024.pdf26 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Coomencement Certificate.pdf24 Apr 2024
Declaration about Commencement CertificateFile: FORMAT D - DOLCE VITA PHASE 1.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DOLCE VITA PHASE 1 25032024.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dolce Vita Phase - I 25032024.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE VITA PHASE 1 31032024.pdf4 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE VITA PHASE 1 02022024.pdf26 Mar 2024
Layout approvalFile: Sanctioned Layout Dolce phase 1.pdf20 Mar 2024
Building plan approvalFile: 07-48.pdf20 Mar 2024
Building plan approvalFile: 08-48.pdf20 Mar 2024
Building plan approvalFile: 10-48.pdf20 Mar 2024
Building plan approvalFile: 11-48.pdf20 Mar 2024
Building plan approvalFile: 12-48.pdf20 Mar 2024
Building plan approvalFile: 15-48.pdf20 Mar 2024
Building plan approvalFile: 16-48.pdf20 Mar 2024
Building plan approvalFile: 18-48.pdf20 Mar 2024
Building plan approvalFile: 19-48.pdf20 Mar 2024
Building plan approvalFile: 20-48.pdf20 Mar 2024
Copy of Layout Approval (in case of layout)File: Sanctioned Layout Dolce phase 1.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 07-48.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 08-48.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 10-48.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 11-48.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 12-48.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 15-48.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 16-48.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 18-48.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 19-48.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 20-48.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP DOLCE VITA 02022024.pdf20 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE VITA 24112023.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DOLCE 31122023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DOLCE VITA 31122023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP Dolce Vita 23112023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE 31122023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DOLCE 10092023.pdf7 Nov 2023

How this compares with Pune

91%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VTP DOLCE VITA Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manjari Kh13,700+ in Pune

2 kmVTP DOLCE VITA Phase 1Completed 13Lapsed / revoked 5Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: Ashdan Developers Private Limited

Ashdan Developers Private Limited has 16 registrations on MahaRERA, including Vtp Cygnus- Nation R1-Tower 9 and VTP Beaumonde-Nation R2 T1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 9 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VTP DOLCE VITA Phase 1 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VTP DOLCE VITA Phase 1?

The registered promoter entity is Ashdan Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VTP DOLCE VITA Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VTP DOLCE VITA Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VTP DOLCE VITA Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VTP DOLCE VITA Phase 1?

The professionals named in the filing: Architect: VKe; Architect: VKa architecture; Architect: ANA Consortium Pvt Ltd; Engineer: NAUSHAD SHIKHALKAR; Engineer: Babu Aakarrapu; Engineer: GIRISH AWINASHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VTP DOLCE VITA Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VTP DOLCE VITA Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VTP DOLCE VITA Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.