IBRAHIM RESIDENCY

By Y H ASSOICATES

RG-MH-26943 · RERA P51900007987 · Last updated on MahaRERA portal: 5 Oct 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 32 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2027Possession promisedmoved 32 months from the original
4 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 93%
61 of 99Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 153 documents Report an error

IBRAHIM RESIDENCY is a Others project by Y H ASSOICATES in 400011, registered with MahaRERA as P51900007987 on 18 Aug 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 32 months from the original filing. 38 of the 99 units on this registration are recorded sold or booked, and 4 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameIBRAHIM RESIDENCY
  • TypeOthers
  • Location
    • Maulana Azad Road
    • 400011
  • Pincode400011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900007987
  • ReraGenie IDRG-MH-26943

Builder

  • NameY H ASSOICATES
  • Entity typePartnership
  • PartnerYASMIN HAROON MEMON
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017First promiseJul 2024Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Aug 2017
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Jul 2024)
  • Buildings3 building records
  • Documents filed153 files

Current status

38%38 of 99 units booked
96.2%Work done, per cost certificate

Figures as on 5 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IBRAHIM RESIDENCY A-WINGNA251543043
IBRAHIM RESIDENCY B- WINGNA2517431356
IBRAHIM RESIDENCY C- WING PROPOSEDNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 5 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 93%.

IBRAHIM RESIDENCY A-WING63%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
IBRAHIM RESIDENCY B- WING63%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
IBRAHIM RESIDENCY C- WING PROPOSED0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered72
BuildingClosed/CoveredTotal
IBRAHIM RESIDENCY A-WING3636
IBRAHIM RESIDENCY C- WING PROPOSED3636

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area766 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2026

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI5300.0
Proposed, not sanctioned3,309 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAMSON APARTMENT OPP JJ HOSP MAZGAON
Estimated costRs 11.00 cr
Cost incurredRs 10.58 cr
Work done96.15%
BuildingWingEstimatedIncurred
IBRAHIM RESIDENCY A-WINGNARs 5.00 crRs 5.00 cr
IBRAHIM RESIDENCY B- WINGNARs 5.00 crRs 5.00 cr
-NARs 1.00 crRs 57.60 lakh

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectABID RIZVI
ArchitectAP DHARIA & ASSOCIATES
EngineerMohammed Anas
EngineerV J JOSHI & ASSOCIATES
EngineerSSA CONSULTANTS
Chartered AccountantPratik D Jain
Chartered AccountantSafan Lalparia
Chartered AccountantShashank Rajendra Jain of Shashank R Jain and Associates
Chartered AccountantHusien Amreliwalla
Chartered AccountantRSPH And Associates
PartnerRole in project
Y H ASSOICATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20082622245Jul 2024 → Mar 2027

Reason as filed by the promoterThe project is substantially completed as on date as can be verified from Form-1 of 30.06.2026. However, the Occupancy Certificate (OC) has not yet been received as certain requisite Government approvals and statutory permissions are still awaited. The process of obtaining the necessary approvals is presently under progress and is dependent upon the concerned Government authorities. The extension is being sought to Complete the Pending work and provide time for obtaining the pending Government approvals, securing the Occupancy Certificate, and thereafter completing the necessary statutory and

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000199324Mr. Samnan Shahid MirM/S. Y.H. Associates23/12/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed153

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 153 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 _Q1 _2026-27.pdf5 Oct 2026
Withdrawal Update Form 1File: June 2025.pdf5 Oct 2026
Withdrawal Update Form 1File: Sept 2025.pdf5 Oct 2026
Withdrawal Update Form 1File: Dec 2025.pdf5 Oct 2026
Withdrawal Update Form 1File: Form 1_ Q4 _2025-26.pdf5 Oct 2026
Withdrawal Update Form 1File: Form 1 _Q1 _2026-27.pdf5 Oct 2026
Withdrawal Update Form 2File: Form 2_2026-27_Q1.pdf5 Oct 2026
Withdrawal Update Form 2File: Engineer Certificate June 2025.pdf5 Oct 2026
Withdrawal Update Form 2File: Engineer Certificate Sept 2025.pdf5 Oct 2026
Withdrawal Update Form 2File: Engineer Certificate - Dec 2025.pdf5 Oct 2026
Withdrawal Update Form 2File: Form 2 _2025-26_Q4.pdf5 Oct 2026
Withdrawal Update Form 2File: Form 2_2026-27_Q1.pdf5 Oct 2026
Withdrawal Update Form 3File: Form 3_2026-27_Q1-compressed.pdf5 Oct 2026
Withdrawal Update Form 3File: CA sept 25-Final.pdf5 Oct 2026
Withdrawal Update Form 3File: CA sept 25-Final.pdf5 Oct 2026
Withdrawal Update Form 3File: Dec 2025-compressed.pdf5 Oct 2026
Withdrawal Update Form 3File: Form 3 _ 2025-26_Q4-compressed.pdf5 Oct 2026
Withdrawal Update Form 3File: Form 3_2026-27_Q1-compressed.pdf5 Oct 2026
Form 2A (FY 2025-2026)File: March 2026.pdf5 Oct 2026
Form 5 (FY 2024-2025)File: FORM-5 2024-2025.pdf20 Aug 2026
Form 2A (FY 2024-2025)File: March 2025.pdf19 Aug 2026
Form 1File: AR Certificate March 22.pdf28 Jul 2025
Form 2File: Engineer Certificate March 2022.pdf28 Jul 2025
Form 3File: CA Certificate-March 22 final.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory March 2022.pdf28 Jul 2025
Form 1File: AR Certficate March 24.pdf28 Jul 2025
Form 2File: Engineer Certificate - March 24.pdf28 Jul 2025
Form 3File: CA - March 2024.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure -2024.pdf28 Jul 2025
Form 1File: AR Certificate June - 24.pdf28 Jul 2025
Form 2File: Engineer Certificate June 2024.pdf28 Jul 2025
Form 3File: CA Certificate June 24 final.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory June 2024.pdf28 Jul 2025
Form 1File: AR Certificate Sep - 24.pdf28 Jul 2025
Form 2File: Engineer Certificate Sept 2024.pdf28 Jul 2025
Form 3File: CA Certificate Sept 24 final.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Sept 2024.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Certificate.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Certificate.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure -2019.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure -2019.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure -2019.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure -2019.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure -2020.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure -2020.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure -2020.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure -2020.pdf28 Jul 2025
Form 1File: AR Certificate.pdf28 Jul 2025
Form 2File: Engineer Certificate.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025

Keep IBRAHIM RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmIBRAHIM RESIDENCYCompleted 9Lapsed / revoked 16Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: Y H ASSOICATES

Y H ASSOICATES has 2 registrations on MahaRERA, including IBRAHIM RESIDENCY and BAIT US SALAM. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if IBRAHIM RESIDENCY is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IBRAHIM RESIDENCY?

The registered promoter entity is Y H ASSOICATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IBRAHIM RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against IBRAHIM RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for IBRAHIM RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IBRAHIM RESIDENCY?

The professionals named in the filing: Architect: ABID RIZVI; Architect: AP DHARIA & ASSOCIATES; Engineer: Mohammed Anas; Engineer: V J JOSHI & ASSOCIATES; Engineer: SSA CONSULTANTS; Chartered Accountant: Pratik D Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IBRAHIM RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IBRAHIM RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IBRAHIM RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.