HIGHLAND SPRINGS B4 D WING

By SIDDHI REAL ESTATE DEVELOPERS

RG-MH-03280 · RERA P51700021160 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 4 months from the original
4 of 11Construction stages donefurthest along: Staircases, 86%
141 of 203Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

HIGHLAND SPRINGS B4 D WING is a Others project by SIDDHI REAL ESTATE DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700021160 on 14 Jun 2019. Possession is promised by 30 Apr 2027. The completion date has moved by 4 months from the original filing. 62 of the 203 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameHIGHLAND SPRINGS B4 D WING
  • TypeOthers
  • Location
    • UNIVERSITY ROAD
    • DHOKALI
    • Thane (M Corp.)
    • Thane
    • 400608
  • Pincode400608
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700021160
  • ReraGenie IDRG-MH-03280

Builder

  • NameSIDDHI REAL ESTATE DEVELOPERS
  • Entity typePartnership
  • PartnerBHUVANESH KAPIL SHARMA
  • PartnersGKS VENTURES PVT LTD, RAJDAKSH MAHENDRA SHARMA, Kapil Mahendra Sharma, Devdutt Rajdaksh Sharma, GAURAV KAPIL SHARMA, KIRTIDAKSH RAJDAKSH SHARMA
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredJun 2019First promiseDec 2026Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2019
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 30 Dec 2026)
  • Buildings1 building record
  • Documents filed127 files

Current status

31%62 of 203 units booked
94.9%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HIGHLAND SPRINGS D - WINGNA282519211203

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 86%.

HIGHLAND SPRINGS D - WING: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor68%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises82%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks86%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.57%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes30%
Street LightingYes10%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes60%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes50%

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered80
Open Space10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area635 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityThane Municipal Corporation (TMC)
Permissible FSI8259.96
Proposed, not sanctioned3,507 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LIMITED KAPURBAWADI JUNNCTION, THANE WEST400607
Estimated costRs 42.30 cr
Cost incurredRs 40.15 cr
Work done94.93%
BuildingWingEstimatedIncurred
HIGHLAND SPRINGS D - WINGNARs 42.30 crRs 40.15 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN CONSORTIUM ARCHITECTS PVT LTD
ArchitectSACHIN PATIL
EngineerHARSHVARDHAN DESHPANDE
EngineerMAHIMTURA CONSULTANTS PVT LTD
EngineerGOPAL RAMPRAKASH MANCHANDA
EngineerVivek Singh
Chartered AccountantSANIKA KETKAR AND ASSOCIATES
Chartered AccountantP SOMANI AND COMPANY
Chartered AccountantHimanshu Joshi & Associates
PartnerRole in project
SIDDHI REAL ESTATE DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51700021160/WarDec 2026 → Apr 2027

Reason as filed by the promoterNA

Litigation declared6

CaseCourtStatus
194/2009THANE CIVIL COURTClosed
791/2010THANE CIVIL COURTClosed
65/2017THANE CIVIL COURTClosed
426/2017THANE CIVIL COURTOngoing
63/2012TEHSILDAR THANEPENDING
23/2021THANE CIVIL COURTOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 May 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A_Annual_ HS_D_2025-26.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 _HS_D Wing_Q1_2026-27.pdf17 Jul 2026
Withdrawal Update Form 1File: Form 1 _HS_D Wing_Q1_2026-27.pdf17 Jul 2026
Withdrawal Update Form 2File: Form 2_ HS_ D_Q1_2026-27_Signed1.pdf17 Jul 2026
Withdrawal Update Form 2File: Form 2_ HS_ D_Q1_2026-27_Signed1.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3_ HS_ D_Q1_2026-27_Signed1_compressed.pdf17 Jul 2026
Withdrawal Update Form 3File: Form 3_ HS_ D_Q1_2026-27_Signed1_compressed.pdf17 Jul 2026
Withdrawal Update Form 1File: Form-1_HS_D_Q4_2025-26.pdf8 May 2026
Withdrawal Update Form 2File: Form-2_HS_D_Q4_2025-26.pdf8 May 2026
Withdrawal Update Form 3File: Revised Form 3 Q4_2025-26_compressed.pdf8 May 2026
Withdrawal Update Form 1File: Form 1 - Q1 2025.pdf17 Mar 2026
Withdrawal Update Form 1File: Form 1 - Q2 2025.pdf17 Mar 2026
Withdrawal Update Form 1File: HS_B4_D wing - Form 1 - 2025 Q3.pdf17 Mar 2026
Withdrawal Update Form 2File: Form 2 - Q1 2025.pdf17 Mar 2026
Withdrawal Update Form 2File: Form 2 - Q2 2025.pdf17 Mar 2026
Withdrawal Update Form 2File: HS_B4_D wing - Form 2 - 2025 Q3.pdf17 Mar 2026
Withdrawal Update Form 3File: Form 3 - Q1 2025.pdf17 Mar 2026
Withdrawal Update Form 3File: Form 3 - Q2 2025.pdf17 Mar 2026
Withdrawal Update Form 3File: HS_B4_D wing - Form 3 - 2025 Q3.pdf17 Mar 2026
Form 1File: Form 1 - 2025 Q3.pdf4 Mar 2026
Form 2File: Form 2 - 2025 Q3.pdf4 Mar 2026
Form 3File: Form 3 - 2025 Q3.pdf4 Mar 2026
Disclosure of Sold and Booked InventoryFile: IDS _ HS _ D_2025-26 _ Q3.pdf4 Mar 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 23.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q124.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 24.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 24.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 D wing - 23-24.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 24.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 24.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 2024 D wing.pdf30 Jan 2025
Certificates of CA (Form 3)File: Form 3 Q4 23.pdf30 Jan 2025
Certificates of CA (Form 3)File: Form 3 Q1 24.pdf30 Jan 2025
Certificates of CA (Form 3)File: Form 3 Q2 24.pdf30 Jan 2025
Certificates of CA (Form 3)File: Form 3 Q3 24.pdf30 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Discl of int in other orgs.pdf30 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-D- WING 23-24.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D wing - Form 2(Dec 23).pdf7 May 2024
Certificates of CA (Form 3)File: RERA Form-3.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 WING D_compressed.pdf30 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A-D- WING (1).pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D WING Architect Certificate 02-04-2024.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing - D .pdf12 Feb 2024
Declaration about Commencement CertificateFile: CC Declaration(D wing).pdf13 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Rera D Wing 22-23.pdf8 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Amended CC Jan 2022.pdf15 Nov 2023
Disclosure of sold/ booked inventoryFile: D wing - Disclosure of Inventory (Sep 23).pdf11 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D WING Architect Certificate 02-10-2023.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D wing - Form 2 (Sep 2023).pdf10 Nov 2023
Certificates of CA (Form 3)File: D wing - Form 3 Sep 23.pdf10 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: D wing - Form2A(FY 22-23).pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D wing - Form 2 (June 2023).pdf8 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D WING Architect Certificate 02-07-2023.pdf3 Aug 2023
Certificates of CA (Form 3)File: Form-3 FY-23-24 (Q1) - D Wing.pdf3 Aug 2023
Layout approvalFile: Layout 1 of 10.pdf10 Jul 2023
Layout approvalFile: Layout 4 of 10.pdf10 Jul 2023
Layout approvalFile: Layout 5 of 10.pdf10 Jul 2023
Layout approvalFile: Layout 6 of 10.pdf10 Jul 2023
Layout approvalFile: Layout 7 of 10.pdf10 Jul 2023
Layout approvalFile: Layout 8 of 10.pdf10 Jul 2023
Layout approvalFile: Layout 10 of 10.pdf10 Jul 2023
Details of encumbrancesFile: No Dues Certificate HDFC 04112020.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 1 of 10.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 4 of 10.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 5 of 10.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 6 of 10.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 7 of 10.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 8 of 10.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 10 of 10.pdf10 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC dated 17052023.pdf10 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: D wing - Form 2A (FY 21-22).pdf20 May 2023
Disclosure of sold/ booked inventoryFile: D wing - Disclosure of Inventory.pdf20 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D wing - Form 2 (Dec 2022).pdf17 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D wing - FORM 2 (March 2023).pdf17 May 2023
Certificates of CA (Form 3)File: D wing - Form 3 (Dec-22).pdf16 May 2023
Certificates of CA (Form 3)File: D wing - Form 3 (Mar-23).pdf16 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: D wing - Form 5 - FY(21-22).pdf15 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D WING Architect Certificate 02-04-2023.pdf10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING D_.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERT D WING - 30-06-2022_compressed.pdf30 Jan 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
HIGHLAND SPRINGS B4- C WINGP51700006307Dhokali, Thane192Aug 2017OngoingNov 2024Registered original: Dec 2023Jan 1970
HIGHLAND SPRINGS B4- B WINGP51700007745Dhokali, Thane142Aug 2017CompletedJan 2024Registered original: Jun 2023Jan 1970
HIGHLAND SPRINGS B4- A WINGP51700005338Dhokali, Thane192Aug 2017CompletedJan 2024Registered original: Jun 2023Jan 1980

How this compares with Thane

31%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 4 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HIGHLAND SPRINGS B4 D WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHOKALI7,600+ in Thane

2 kmHIGHLAND SPRINGS B4 D WICompleted 170Lapsed / revoked 60Other 139Dot size: filed unitsN

Filed coordinates, straight-line distance. 369 registered projects within 2 km.

Builder: SIDDHI REAL ESTATE DEVELOPERS

SIDDHI REAL ESTATE DEVELOPERS has 6 registrations on MahaRERA, including HIGHLAND SPRINGS B4- A WING and HIGHLAND SPRINGS B4- B WING. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if HIGHLAND SPRINGS B4 D WING is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HIGHLAND SPRINGS B4 D WING?

The registered promoter entity is SIDDHI REAL ESTATE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HIGHLAND SPRINGS B4 D WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HIGHLAND SPRINGS B4 D WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HIGHLAND SPRINGS B4 D WING?

The professionals named in the filing: Architect: DESIGN CONSORTIUM ARCHITECTS PVT LTD; Architect: SACHIN PATIL; Engineer: HARSHVARDHAN DESHPANDE; Engineer: MAHIMTURA CONSULTANTS PVT LTD; Engineer: GOPAL RAMPRAKASH MANCHANDA; Engineer: Vivek Singh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HIGHLAND SPRINGS B4 D WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HIGHLAND SPRINGS B4 D WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HIGHLAND SPRINGS B4 D WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.