ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / HIGHLAND SPRINGS B4- C WING

Registered Litigation declared Others project

HIGHLAND SPRINGS B4- C WING

By SIDDHI REAL ESTATE DEVELOPERS

RG-MH-11747 · RERA P51700006307 · Last updated on MahaRERA portal: 3 Sep 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 8 cases
  • 3 complaints at MahaRERA
  • Completion date moved by 39 months
  • 4 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 completed earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 39 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
19 of 202Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

HIGHLAND SPRINGS B4- C WING is a Others project by SIDDHI REAL ESTATE DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700006307 on 14 Aug 2017. Possession is promised by 20 Mar 2027. The completion date has moved by 39 months from the original filing. 183 of the 202 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameHIGHLAND SPRINGS B4- C WING
  • TypeOthers
  • Location
    • University Road
    • Dhokali
    • Thane (M Corp.)
    • Thane
    • 400608
  • Pincode400608
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700006307
  • ReraGenie IDRG-MH-11747

Builder

  • NameSIDDHI REAL ESTATE DEVELOPERS
  • Entity typePartnership
  • PartnersKIRTIDAKSH RAJDAKSH SHARMA, GAURAV KAPIL SHARMA, Devdutt Rajdaksh Sharma, Kapil Mahendra Sharma, RAJDAKSH MAHENDRA SHARMA, GKS VENTURES PVT LTD
  • PartnerBHUVANESH KAPIL SHARMA
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion20 Mar 2027
  • Revised completionRevised to 20 Mar 2027 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed141 files

Current status

91%183 of 202 units booked
90.2%Work done, per cost certificate

Figures as on 3 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HIGHLAND SPRINGS - C WINGNA272619210202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

HIGHLAND SPRINGS - C WING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes5%
Street LightingYes5%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes25%

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Closed/Covered97
Open Space9

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area622 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI7964.23
Proposed, not sanctioned5,538 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO G 115 116 117 118 HIGHSTREET CUM HIGHLAND CORPO CENTRE KAPURBAWDI JUNCTION THANE ZIP CODE
Estimated costRs 56.34 cr
Cost incurredRs 50.85 cr
Work done90.25%
BuildingWingEstimatedIncurred
HIGHLAND SPRINGS - C WINGNARs 56.34 crRs 50.85 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Consortium Architects I Pvt ltd
ArchitectDESIGN CONSORTIUM ARCHITECTS PVT LTD
EngineerMahimtura consultants pvt ltd
EngineerGOPAL RAMPRAKASH MANCHANDA
Chartered AccountantP SOMANI AND COMPANY
PartnerRole in project
SIDDHI REAL ESTATE DEVELOPERS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018049Dec 2023 → Nov 2024

Reason as filed by the promoterProject has been completed around 70% till October 2023. However, due to shortage of materials and non - availability of labour we are unable to finish the project before 30th December, 2023.

EXT51700025217Dec 2023 → Dec 2025

Reason as filed by the promoterI, hereby apply for extension as per Order No. 40 Dated 27/12/2022 of the registered project bearing vide no P51700006307. As per HEARING DATED 11th August 2025, Hon'ble Shri Manoj Saunik Sir granted Extension upto 31/12/2025. The order is uploaded in Other Tab for your reference

EA18082622181Dec 2023 → Nov 2026

Reason as filed by the promoterWe, Siddhi Real Estate Developers, hereby declare the following with respect to the project Highland Springs B4­ C Wing bearing registration number P51700006307 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 30/09/2025 and we have also initiated the process for the possession as well. However there is mismatch occurred in certain details on the MahaRERA profile as compared with the sanctioned plans, such as the Permissible built-u

P51700006307/WarDec 2023 → Mar 2027

Reason as filed by the promoterNA

Litigation declared8

CaseCourtStatus
194/2009THANE CIVIL COURTdispossed off
791/2010THANE CIVIL COURTDisposed off
65/2017THANE CIVIL COURTPENDING
426/2017THANE CIVIL COURTPENDING
48/2022THANE CIVIL COURTHearing of Exhibit
23/2021THANE CIVIL COURTPending
241/2023High Courtdispossed off
Dairy no 10499/2024Supreme Court of IndiaPending

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12502511Amruta KinjawadekarSIDDHI REAL ESTATE DEVELOPERS21/07/2025
CC12502512Sushil JadhavSIDDHI REAL ESTATE DEVELOPERS21/07/2025
CC12600717PARESH MAHADEO MALVANKARSIDDHI REAL ESTATE DEVELOPERS08/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Jul 2023

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf3 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf3 Sep 2026
Withdrawal Update Form 2File: Form 2_Q2_2025-26_HS_C wing.pdf3 Sep 2026
Withdrawal Update Form 2File: Form 2_Q2_2025-26_HS_C wing.pdf3 Sep 2026
Withdrawal Update Form 3File: Form 3_30-09-2025.pdf3 Sep 2026
Withdrawal Update Form 3File: Form 3_30-09-2025.pdf3 Sep 2026
Withdrawal Update Form 1File: Form 1_Q2_2025-26_HS_ C wing.pdf18 Aug 2026
Withdrawal Update Form 1File: Form 1_Q2_2025-26_HS_ C wing.pdf18 Aug 2026
Withdrawal Update Form 1File: Form 1_Q2_2025-26_HS_ C wing.pdf18 Aug 2026
Withdrawal Update Form 2File: Form 2_Q2_2025-26_HS_C wing.pdf18 Aug 2026
Withdrawal Update Form 2File: Form 2_Q2_2025-26_HS_C wing.pdf18 Aug 2026
Withdrawal Update Form 2File: Form 2_Q2_2025-26_HS_C wing.pdf18 Aug 2026
Withdrawal Update Form 3File: Form 3_Q2_2025-26_HS_C wing.pdf18 Aug 2026
Withdrawal Update Form 3File: Form 3_Q2_2025-26_HS_C wing.pdf18 Aug 2026
Withdrawal Update Form 3File: Form 3_Q2_2025-26_HS_C wing.pdf18 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A_2024-25_HS_C wing.pdf18 Aug 2026
Form 5 (FY 2017-2018)File: Form 5_2017-18_HS_C wing.pdf18 Aug 2026
Form 5 (FY 2018-2019)File: Form 5_2018-19_HS_C wing.pdf18 Aug 2026
Form 5 (FY 2019-2020)File: Form 5_2019-20_HS_C wing.pdf18 Aug 2026
Form 5 (FY 2020-2021)File: Form 5_2020-21_HS_C wing.pdf18 Aug 2026
Form 5 (FY 2021-2022)File: Form 5_2020-21_HS_C wing.pdf18 Aug 2026
Form 5 (FY 2022-2023)File: Form 5_2020-21_HS_C wing.pdf18 Aug 2026
Form 5 (FY 2023-2024)File: Form 5_2020-21_HS_C wing.pdf18 Aug 2026
Form 5 (FY 2024-2025)File: Form 5_2024-25_HS_C wing.pdf18 Aug 2026
Form 5 (FY 2025-2026)File: Form 5_2024-25_HS_C wing.pdf18 Aug 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - 2024-Q4 HS C wing.pdf16 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Q3 2024 C wing.pdf4 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Q3 2024 C wing.pdf4 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Q3 2024 C wing.pdf4 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf3 Dec 2024
Certificates of CA (Form 3)File: Form 3 - Mar 24.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3 - June 24.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3 - Sept 24.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sept 2024.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - June 2024.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Mar 2024.pdf2 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29 as on 30-09-2024.pdf2 Dec 2024
Declaration in FORM BFile: Form B.pdf28 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sept 23.pdf28 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec 23.pdf28 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Mar 24.pdf28 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Jun 24.pdf28 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sept 24.pdf28 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf28 Nov 2024
CERSAI detailsFile: CERSAI declaration.pdf28 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf28 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf28 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure -A.pdf28 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORMA-2A 23-24.pdf16 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C WING Architect Certificate 02-04-2024.pdf24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wing- C .pdf13 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A - June 2023.pdf20 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Sep 2023.pdf20 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A MAR 2023.pdf20 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5 C WING 2022-23.pdf5 Dec 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE DETAILS.pdf2 Dec 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE DETAILS.pdf2 Dec 2023
Declaration in FORM BFile: Form B Affidavit Cum Declaration.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: INVENTORY DETAILS C WING.pdf2 Dec 2023
Disclosure of sold/ booked inventoryFile: C wing - Disclosure of Inventory (Sep 23).pdf11 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C WING Architect Certificate 02-10-2023.pdf10 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: C wing - Form 2 (Sep 2023).pdf10 Nov 2023
Certificates of CA (Form 3)File: C wing - Form 3 Sep 23.pdf10 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: C wing - Form2A(FY 22-23).pdf11 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: C wing - Form 2 (June 2023).pdf8 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C WING Architect Certificate 02-07-2023.pdf3 Aug 2023
Certificates of CA (Form 3)File: Form-3 FY-23-24 (Q1) - C Wing.pdf3 Aug 2023
Layout approvalFile: Layout 1 of 10.pdf10 Jul 2023
Layout approvalFile: Layout 4 of 10.pdf10 Jul 2023
Layout approvalFile: Layout 5 of 10.pdf10 Jul 2023
Layout approvalFile: Layout 10 of 10.pdf10 Jul 2023
Details of encumbrancesFile: No Dues Certificate HDFC 04112020.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 1 of 10.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 4 of 10.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 5 of 10.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout 10 of 10.pdf10 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC dated 17052023.pdf10 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate dated 08012020.pdf10 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: C wing - Form 2A (FY 21-22).pdf20 May 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
HIGHLAND SPRINGS B4 D WINGP51700021160DHOKALI, Thane192Jun 2019OngoingDec 2026Not due yet
HIGHLAND SPRINGS B4- B WINGP51700007745Dhokali, Thane142Aug 2017CompletedJan 2024Registered original: Jun 2023Jan 1970
HIGHLAND SPRINGS B4- A WINGP51700005338Dhokali, Thane192Aug 2017CompletedJan 2024Registered original: Jun 2023Jan 1980

How this compares with Thane

91%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 39 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HIGHLAND SPRINGS B4- C WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhokali7,600+ in Thane

2 kmHIGHLAND SPRINGS B4- C WCompleted 173Lapsed / revoked 59Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 373 registered projects within 2 km.

Builder: SIDDHI REAL ESTATE DEVELOPERS

SIDDHI REAL ESTATE DEVELOPERS has 6 registrations on MahaRERA, including HIGHLAND SPRINGS B4- A WING and HIGHLAND SPRINGS B4- B WING. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if HIGHLAND SPRINGS B4- C WING is delayed beyond 20 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HIGHLAND SPRINGS B4- C WING?

The registered promoter entity is SIDDHI REAL ESTATE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HIGHLAND SPRINGS B4- C WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against HIGHLAND SPRINGS B4- C WING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for HIGHLAND SPRINGS B4- C WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HIGHLAND SPRINGS B4- C WING?

The professionals named in the filing: Architect: Design Consortium Architects I Pvt ltd; Architect: DESIGN CONSORTIUM ARCHITECTS PVT LTD; Engineer: Mahimtura consultants pvt ltd; Engineer: GOPAL RAMPRAKASH MANCHANDA; Chartered Accountant: P SOMANI AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HIGHLAND SPRINGS B4- C WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HIGHLAND SPRINGS B4- C WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HIGHLAND SPRINGS B4- C WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.