Haware Sky
RG-MH-17653 · RERA P51700066480 · Last updated on MahaRERA portal: 31 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Haware Sky is a Others project by HAWARE SKY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51700066480 on 11 Jun 2024. Possession is promised by 10 Feb 2029. 88 of the 128 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- NameHaware Sky
- TypeOthers
- Location
- Subhash Nagar
- Chembur
- Kurla
- Mumbai Suburban
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700066480
- ReraGenie IDRG-MH-17653
Builder
- NameHAWARE SKY LLP
- Entity typePartnership
- GSTIN27AAOFH4796C1Z0
- PartnersAnil Kumar Singh, Ujjwala Satish Haware
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Jun 2024
- Promised completion10 Feb 2029
- Revised completionNone
- Buildings2 building records
- Documents filed82 files
Current status
Figures as on 31 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Haware Sky - Wing A | NA | 1 | 1 | 53 | 6 | 59 |
| Haware Sky - Wing B | NA | 1 | 1 | 64 | 5 | 69 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 94%.
Haware Sky - Wing A51%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 94% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 6% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 76% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 21% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Haware Sky - Wing B51%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 94% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 6% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 76% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 21% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed31
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Haware Sky - Wing A | 15 | 15 |
| Haware Sky - Wing B | 16 | 16 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Nirmal Pragati Co-op Hsg Soc Ltd | Greater Mumbai (M Corp.) (Part) (802794) | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Haware Sky - Wing A | NA | Rs 12.23 cr | Rs 7.58 cr |
| Haware Sky - Wing B | NA | Rs 12.23 cr | Rs 7.58 cr |
| - | NA | Rs 1.49 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr.Indrajeet Deshmukh (M/s Vastu Creations) |
| Engineer | M/s. Piyushkumar Keshavlal Sura. |
| Engineer | Arvind Jaisingh Kadam |
| Engineer | S D ABHYANKAR |
| Chartered Accountant | RISHI SEKHRI |
| Chartered Accountant | MUGHDA BAJAJ |
| Partner | Role in project |
|---|---|
| HAWARE SKY LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 10 Feb 2029
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 01 Haware Sky Architect Certificate Q1 FY 2026-27.pdf | 31 Jul 2026 |
| Withdrawal Update Form 1File: FORM 01 Haware Sky Architect Certificate Q1 FY 2026-27.pdf | 31 Jul 2026 |
| Withdrawal Update Form 1File: FORM 01 Haware Sky Architect Certificate Q1 FY 2026-27.pdf | 31 Jul 2026 |
| Withdrawal Update Form 2File: FORM 02 Haware Sky Engineers Certificate Q1 FY 2026 27.pdf | 31 Jul 2026 |
| Withdrawal Update Form 2File: FORM 02 Haware Sky Engineers Certificate Q1 FY 2026 27.pdf | 31 Jul 2026 |
| Withdrawal Update Form 2File: FORM 02 Haware Sky Engineers Certificate Q1 FY 2026 27.pdf | 31 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 HSLLP Q4 FY 2025 26signed.pdf | 31 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 HSLLP Q1 FY 2026 27 signed.pdf | 31 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 HSLLP Q1 FY 2026 27 signed.pdf | 31 Jul 2026 |
| Withdrawal Update Form 1File: Form 1-Architect Certificate-Haware Sky.pdf | 5 Jun 2026 |
| Withdrawal Update Form 2File: Form 2-Engineer Certificate Haware Sky.pdf | 5 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 HSLLP Q4 FY 2025 26signed.pdf | 5 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A- Quality Assurance-2024-25.pdf | 4 May 2026 |
| Form 2A (FY 2025-2026)File: Form 2A- Quality Assurance-2025-26.pdf | 4 May 2026 |
| Form 1File: Architect Form 1.pdf | 30 Apr 2026 |
| Form 2File: Engineers Certificate Form 2.pdf | 30 Apr 2026 |
| Form 3File: FORM 3 Haware Sky Q2 24 25.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - Q2- FY 2024-25_signed.pdf | 30 Apr 2026 |
| Form 1File: Architect Certificate Bldg No 33 Chembur 24 01 2025.pdf | 30 Apr 2026 |
| Form 2File: Engineers Certication Bldg No 33 Chembur 24 01 2025.pdf | 30 Apr 2026 |
| Form 3File: FORM 3 Haware Sky 31 12 24 Signed.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - Q3- FY 2024-25_signed.pdf | 30 Apr 2026 |
| Form 1File: Architect Certificate Bldg No 33 Haware Sky.pdf | 30 Apr 2026 |
| Form 2File: Engineers Certificate Bldg 33 Haware Sky.pdf | 30 Apr 2026 |
| Form 3File: FORM 3 Haware Sky 31 03 2025 Signed.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - Q4- FY 2024-25_signed.pdf | 30 Apr 2026 |
| Form 1File: Haware Sky Architect Certificate.pdf | 30 Apr 2026 |
| Form 2File: Haware Sky Engineers Certificate Q1.pdf | 30 Apr 2026 |
| Form 3File: FORM 3 Haware Sky 30 06 25 Sign.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Q1 FY 2025 26.pdf | 30 Apr 2026 |
| Form 1File: Architect Certificate Haware Sky 2.pdf | 30 Apr 2026 |
| Form 2File: Engineers Certificate Haware Sky 2.pdf | 30 Apr 2026 |
| Form 3File: FORM 3 Haware Sky 30 09 25 Sign.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Q2 FY 2025 26.pdf | 30 Apr 2026 |
| Form 1File: Architect Certificate Haware Sky Chembur-.pdf | 30 Apr 2026 |
| Form 2File: Engineer Certificate Haware Sky Chembur 31122025-.pdf | 30 Apr 2026 |
| Form 3File: FORM 3 HSLLP Q3 FY 25 26 REVISED.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Q3 FY 2025 26.pdf | 30 Apr 2026 |
| Form 1File: Architect Form 1.pdf | 30 Apr 2026 |
| Form 2File: Engineers Certificate form 2.pdf | 30 Apr 2026 |
| Form 3File: CA Certificate on Project Cost AND Fund withdrawal Form 3.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - Q1- FY 2024-25_signed.pdf | 30 Apr 2026 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE - CC -MHADA -13788_furthercc_signed.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate on Project Cost and Fund withdrawal Form 3.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 24 Apr 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow | 20 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B).p | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 6 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate on Project Cost and Fund withdrawal Form 3.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 6 Feb 2025 |
| Building plan approvalFile: 02 AMENDED IOA SANCTION DRGS 291024_compressed.pdf | 27 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf | 27 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Haware Sky Q2 24 25.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2.pdf | 27 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 01 Amended IOA Letter.pdf | 27 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 01Further Commencement Certificate.pdf | 27 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 02 AMENDED IOA SANCTION DRGS 291024_compressed.pdf | 27 Dec 2024 |
| Proforma of Agreement for saleFile: Agreement for sale.pdf | 5 Jun 2024 |
| CERSAI detailsFile: Declaration for Cresai revised.pdf | 30 May 2024 |
| Other - TechnicalFile: Declaration to Annexure A.pdf | 30 May 2024 |
| Copy of the legal title reportFile: Legal Title Report-compressed.pdf | 18 May 2024 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 10 May 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances.pdf | 10 May 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances.pdf | 10 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 10 May 2024 |
| Declaration about Commencement CertificateFile: d Declaration about Commencement Certificate Format-D.pdf | 10 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Revised.pdf | 10 May 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deveiation sheet.pdf | 10 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect Form 1.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: (1) Engineers Certificate form 2.pdf | 8 Apr 2024 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 8 Apr 2024 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf | 5 Feb 2024 |
| PAN CardFile: Haware Sky LLP Pancard.pdf | 5 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: a Emcumbrance.pdf | 5 Feb 2024 |
| Details of encumbrances concerned to LegalFile: a Emcumbrance.pdf | 5 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf | 5 Feb 2024 |
| Declaration in FORM BFile: Form B-Affidavit cum Declaration.pdf | 5 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: b Disclosure of Interest in Other Real Estate Organizations.pdf | 5 Feb 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| HAWARE AMARAP51800049029 | Vikhroli East, Mumbai Suburban | 157 | Jan 2023 | Certificate Signed | Jan 2028 | Jun 2025 |
| Haware AlturaP51800029411 | Vikhroli East, Mumbai Suburban | - | May 2021 | Certificate Signed | Apr 2026 | Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Haware Sky on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chembur6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 402 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: HAWARE SKY LLP
HAWARE SKY LLP has 1 registration on MahaRERA, including Haware Sky. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Haware Sky is delayed beyond 10 Feb 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Haware Sky?
The registered promoter entity is HAWARE SKY LLP, a partnership as per the filing. Its GSTIN 27AAOFH4796C1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Haware Sky?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Haware Sky?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Haware Sky?
The professionals named in the filing: Architect: Mr.Indrajeet Deshmukh (M/s Vastu Creations); Engineer: M/s. Piyushkumar Keshavlal Sura.; Engineer: Arvind Jaisingh Kadam; Engineer: S D ABHYANKAR; Chartered Accountant: RISHI SEKHRI; Chartered Accountant: MUGHDA BAJAJ. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Haware Sky?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback