Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HAWARE AMARA is a Residential / Group Housing project by HAWARE AMARA LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049029 on 30 Jan 2023. The registration is recorded completed; possession was promised by 10 Jan 2028. 149 of the 157 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameHAWARE AMARA
- TypeResidential / Group Housing
- Location
- Kannamwar Nagar
- Vikhroli East
- Hariyali
- Kurla
- Mumbai Suburban
- 400083
- Pincode400083
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800049029
- ReraGenie IDRG-MH-95825
Builder
- NameHAWARE AMARA LLP
- Entity typePartnership
- PartnerANIL KUMAR SINGH
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on30 Jan 2023
- Promised completion10 Jan 2028
- Revised completionNone
- Buildings2 building records
- Documents filed142 files
Current status
Figures as on 12 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HAWARE AMARA - WING A | NA | 24 | 24 | 48 | 11 | 59 |
| HAWARE AMARA - WING B | NA | 24 | 0 | 90 | 8 | 98 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.
HAWARE AMARA - WING A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
HAWARE AMARA - WING B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| HAWARE AMARA - WING A | 31 | 31 |
| HAWARE AMARA - WING B | 23 | 23 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| HAWARE AMARA - WING A | NA | Rs 29.48 cr | Rs 29.48 cr |
| HAWARE AMARA - WING B | NA | Rs 29.48 cr | Rs 29.48 cr |
| - | NA | Rs 1.57 cr | Rs 1.57 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/s Vastu Creations |
| Engineer | M/s Structwel Designer & consultants Pvt. Ltd. |
| Engineer | S D ABHYANKAR |
| Engineer | Rahul Narayan Thakare |
| Chartered Accountant | RISHI SEKHRI ANMOL SEKHRI |
| Chartered Accountant | Saurabh Jhunjhunuwala |
| Chartered Accountant | Aksshay Sanjay Gomase |
| Chartered Accountant | Mugdha Bajaj |
| Partner | Role in project |
|---|---|
| HAWARE AMARA LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed142
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Occupancy Certificate.pdf | 12 Jun 2026 |
| Withdrawal Update Form 1File: Form 1-Architects Certificate-Haware Amara.pdf | 30 Apr 2026 |
| Withdrawal Update Form 2File: Form 2-Engineers Certificate-Haware Amara.pdf | 30 Apr 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 Signed.pdf | 30 Apr 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A-2025-2026.pdf | 28 Apr 2026 |
| Form 2A (FY 2022-2023)File: Form 2A- 2022-2023.pdf | 4 Apr 2026 |
| Form 2A (FY 2023-2024)File: Form 2A- 2023-2024.pdf | 4 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A- 2024-2025.pdf | 4 Apr 2026 |
| Withdrawal Update Form 1File: Dec 2025 Haware Amara-Architects Certificate.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Dec 2025 Haware Amara-Engineers Certificate.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 - Q3 -FY 2025-26 - AMARA_signed.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Haware Amara-Architect Certificate - 30-09-2025.pdf | 1 Dec 2025 |
| Withdrawal Update Form 2File: Haware Amara-Engineers Certificate- 30-09-2025.pdf | 1 Dec 2025 |
| Withdrawal Update Form 3File: Haware Amara LLP- RERA Form 3 Q2 - SIGNED.pdf | 1 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate Haware Amara.pdf | 26 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate Haware Amara.pdf | 26 Nov 2025 |
| Withdrawal Update Form 3File: RERA FORM 3 - AMARA-signed.pdf | 26 Nov 2025 |
| Form 5 (FY 2024-2025)File: FORM 5-Sign.pdf | 25 Nov 2025 |
| Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 21 Nov 2025 |
| Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 21 Nov 2025 |
| Form 3File: 2 CA Certificate on Project Cost & Fund withdrawal (Form 3) (1).pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form for Declosure of Sold and unsold units Q4 FY 22-23_Sign.pdf | 21 Nov 2025 |
| Form 1File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 21 Nov 2025 |
| Form 2File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 21 Nov 2025 |
| Form 3File: 3 CA Certificate on Project Cost & Fund withdrawal (Form 3) (1).pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form for Declosure of Sold and unsold units Q2 FY 23-24 sign.pdf | 21 Nov 2025 |
| Form 1File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 21 Nov 2025 |
| Form 2File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 21 Nov 2025 |
| Form 3File: 4 CA Certificate on Project Cost & Fund withdrawal (Form 3) (1).pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form for Declosure of Sold and unsold units Q3 FY 23-24 sign.pdf | 21 Nov 2025 |
| Form 1File: Haware Amara-Architects Certificate form 1.pdf | 21 Nov 2025 |
| Form 2File: Haware Amara-Engineers Certificate form 2.pdf | 21 Nov 2025 |
| Form 3File: Form 3 Final 310324.pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold disclosure.pdf | 21 Nov 2025 |
| Form 1File: Architect Certificate Haware Amara Bldg No49 form 1.pdf | 21 Nov 2025 |
| Form 2File: Engineer Certificate Haware Amara Bldg No 49 form 2.pdf | 21 Nov 2025 |
| Form 3File: Form 3 Final.pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold Disclosure 300624.pdf | 21 Nov 2025 |
| Form 1File: Haware Amara Architects Cert 30092024 Form1.pdf | 21 Nov 2025 |
| Form 2File: Haware Amara Engineers Cert 30092024 Form2.pdf | 21 Nov 2025 |
| Form 3File: Form 3 Final 300924 Haware Amara-Sign.pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form for Declosure of Sold and unsold units Q2 FY 24-25 sign.pdf | 21 Nov 2025 |
| Form 1File: Architect Certificate form 1.pdf | 21 Nov 2025 |
| Form 2File: Engineers Certificate form 2.pdf | 21 Nov 2025 |
| Form 3File: Form 3 Final 311224 Haware Amara-Sign.pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form for Declosure of Sold and unsold units Q3 FY 24-25 sign.pdf | 21 Nov 2025 |
| Form 1File: Architect Certificate.pdf | 21 Nov 2025 |
| Form 2File: Engineers Certificate.pdf | 21 Nov 2025 |
| Form 3File: FORM 3 -Q4 - Haware Amara-SIGN_2.pdf | 21 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form for Declosure of Sold and unsold units Q4 FY 24-25 sign.pdf | 21 Nov 2025 |
| Form 5 (FY 2023-2024)File: Form 5 Final 310324 REVISED.pdf | 20 Nov 2025 |
| Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 20 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 CA Certificate on Project Cost and Fund withdrawal Form 3.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 CA Certificate on Project Cost and Fund withdrawal Form 3.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 CA Certificate on Project Cost and Fund withdrawal Form 3.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 27 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Final 310324 REVISED.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Haware Amara Bldg No49.pdf | 20 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate Haware Amara Bldg No 49.pdf | 20 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Disclosure 300624.pdf | 20 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final as on June 24.pdf | 20 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Full CC.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Haware Amara-Architects Certificate.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Haware Amara-Engineers Certificate.pdf | 23 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold disclosure.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final 310324.pdf | 23 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Final 310324.pdf | 23 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Haware Amara-Form 2A Engineers Certificate.pdf | 21 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_ Architect certificate.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 -Engineers Certificate.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Dec 23.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Haware Amara FORM 3.pdf | 11 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Haware Amara_Form 1.pdf | 3 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Haware Amara_Form 2.pdf | 3 Nov 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Haware SkyP51700066480 | Chembur, Mumbai Suburban | 128 | Jun 2024 | Ongoing | Feb 2029 | Not due yet |
| HAWARE ELINORP52000049131 | PANVEL, Raigarh | 90 | Feb 2023 | Ongoing | Nov 2027 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 142 filed documents as one ZIP, foldered, with a manifest
Keep HAWARE AMARA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vikhroli East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt
Mumbai Housing And Area Development Board
Om Siddhivinayak CHS and Gurukrupa CHS
Shreeji Developers
AKASSH AMAZONIA TOWER 1
HEER MEHTA LANDMARK DEVELOPERS PRIVATE LIM
Ajmera Solis
Shree Yogi Realcon Private Limited
CENTRAL PARK
V LAXMI NURSES DEVELOPERS LLP
Swastik Platinum
SUVASYA BUILDERS AND DEVELOPERS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: HAWARE AMARA LLP
HAWARE AMARA LLP has 1 registration on MahaRERA, including HAWARE AMARA. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if HAWARE AMARA is delayed beyond 10 Jan 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HAWARE AMARA?
The registered promoter entity is HAWARE AMARA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HAWARE AMARA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HAWARE AMARA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HAWARE AMARA?
The professionals named in the filing: Architect: M/s Vastu Creations; Engineer: M/s Structwel Designer & consultants Pvt. Ltd.; Engineer: S D ABHYANKAR; Engineer: Rahul Narayan Thakare; Chartered Accountant: RISHI SEKHRI ANMOL SEKHRI; Chartered Accountant: Saurabh Jhunjhunuwala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HAWARE AMARA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback