Home / Browse projects / Pune, Maharashtra / GV7 INSIGNIA BUILDING B AND C

Registered No litigation declared Residential / Group Housing project

GV7 INSIGNIA BUILDING B AND C

By M/S CHIRAG DEVELOPERS

RG-MH-32264 · RERA P52100080265 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 40.00 crore secured on the land, in favour of HDFC BANK LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 20%
74 of 118Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

GV7 INSIGNIA BUILDING B AND C is a Residential / Group Housing project by M/S CHIRAG DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100080265 on 15 May 2025. Possession is promised by 31 Dec 2029. 44 of the 118 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameGV7 INSIGNIA BUILDING B AND C
  • TypeResidential / Group Housing
  • Location
    • AMBEGAON BUDRUK
    • AMBEGAON
    • AMBEGAON Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • RERA no.P52100080265
  • ReraGenie IDRG-MH-32264

Builder

  • NameM/S CHIRAG DEVELOPERS
  • Entity typePartnership
  • Declared earlier projects8 →

Key dates

this monthRegisteredMay 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed70 files

Current status

37%44 of 118 units booked
31.9%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING BNA41404
BUILDING CNA18151140114

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 20%.

BUILDING B36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed274

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots274
Closed/Covered150
Open Space124
BuildingClosed/CoveredOpen SpaceTotal
BUILDING B7562137
BUILDING C7562137

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area10,893 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHDFC BANK LIMITED
Secured amountRs 40.00 crore
CERSAI search filedYes
Declared on10 Sep 2025

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI14273.87
Proposed, not sanctioned13,830 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUPPER GROUND FLOOR S NO 83 84SUGANDHTARA SQUARE KATRAJ CHOWK KATRAJ PUNE MAHARASHTRA411046
Estimated costRs 50.30 cr
Cost incurredRs 16.05 cr
Work done31.91%
BuildingWingEstimatedIncurred
BUILDING CNARs 41.68 crRs 10.09 cr
BUILDING BNARs 5.96 crRs 5.96 cr
-NARs 2.66 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVoussoirs THROUGH MR SAMEER VALIMBE
EngineerDNYANESHWAR AWHALE
EngineerSiddiki Mujib
EngineerMAYURESH GIDDE
Chartered AccountantPradeep B. More
PartnerRole in project
M/S CHIRAG DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf28 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf28 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE -FINAL Q4 CHIRAG FY 2025-26_0001.pdf28 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2 (2).pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Jan 2026
Withdrawal Update Form 1File: Gv7 Bldg B u0026 C Form 1 Q2.pdf15 Oct 2025
Withdrawal Update Form 2File: Gv7 Bldg B u0026 C Form 2 Q2.pdf15 Oct 2025
Withdrawal Update Form 3File: Gv7 SR NO 3 B u0026 C BLDG FORM 3 QTR 2 25-26.pdf15 Oct 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate B u0026 C for QPR 1.pdf19 Aug 2025
Withdrawal Update Form 2File: FORM 2 ENG CERTIFICATE.pdf19 Aug 2025
Withdrawal Update Form 3File: Gv7 Bldg B and C Form 3 Q1 (1).pdf19 Aug 2025
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout) (51).pdf7 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout) (51).pdf7 May 2025
Layout approvalFile: FINAL LAYOUT UPLOADED_compressed.pdf29 Apr 2025
Layout approvalFile: sheet1 building Layout_compressed.pdf29 Apr 2025
Copy of Layout Approval (in case of layout)File: FINAL LAYOUT UPLOADED_compressed.pdf29 Apr 2025
Copy of Layout Approval (in case of layout)File: sheet1 building Layout_compressed.pdf29 Apr 2025
Proforma of Allotment letterFile: Allotment letter.pdf29 Apr 2025
Declaration about Commencement CertificateFile: REVISEDDeclaration about commencement certificate (1) (1).pdf29 Apr 2025
CERSAI detailsFile: Declaration Cersai.pdf29 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation report Allotment letter.pdf29 Apr 2025
Other - TechnicalFile: Annexure a Declaration cum undertaking (1).pdf29 Apr 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION AFS GV7 BUILDING B AND C FINAL UPLOADED.pdf29 Apr 2025
Proforma of Agreement for saleFile: GV7 BUILDING B AND C FINAL UPLOADED AFS.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certiifcate.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf18 Apr 2025
Other - LegalFile: SALE DEED 647_2010 9R.pdf18 Apr 2025
Other - LegalFile: 7 12 Extract.pdf18 Apr 2025
Other - LegalFile: SALE DEED 11814_2011_11 R-51-108_11zon.pdf18 Apr 2025
Other - LegalFile: SALE DEED 5724_2010 3R.pdf18 Apr 2025
Other - LegalFile: Sale deed part 1.pdf18 Apr 2025
Other - LegalFile: SALE DEED 11814_2011_11 R-1-50_compressed.pdf18 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Letter from Bank opening of RERA designated bank account.pdf18 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Validation email by PMC to MahaRERA.pdf17 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Declaration about RERA Designated Bank Account.pdf17 Apr 2025
Building plan approvalFile: SHEET 2_11zon.pdf16 Apr 2025
Building plan approvalFile: SHEET 3_11zon.pdf16 Apr 2025
Building plan approvalFile: SHEET 4_rotated_11zon.pdf16 Apr 2025
Building plan approvalFile: SHEET 5_rotated_11zon.pdf16 Apr 2025
Building plan approvalFile: SHEET 6_11zon.pdf16 Apr 2025
Building plan approvalFile: SHEET 7_rotated_11zon.pdf16 Apr 2025
Building plan approvalFile: SHEET 8_rotated_11zon.pdf16 Apr 2025
Building plan approvalFile: SHEET 9_rotated_11zon.pdf16 Apr 2025
PAN CardFile: Chirag Developers - PAN Card.pdf16 Apr 2025
Copy of the legal title reportFile: Search and title report final - GV7.pdf16 Apr 2025
Details of encumbrances concerned to FinanceFile: No encumbrance certificate.pdf16 Apr 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrance certificate.pdf16 Apr 2025
Declaration in FORM BFile: Affidavit cum declaration on stamp paper.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certifiate R.pdf16 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: cc barskar_11zon.pdf16 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SHEET 2_11zon.pdf16 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SHEET 3_11zon.pdf16 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SHEET 4_rotated_11zon.pdf16 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SHEET 5_rotated_11zon.pdf16 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SHEET 6_11zon.pdf16 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SHEET 7_rotated_11zon.pdf16 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SHEET 8_rotated_11zon.pdf16 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SHEET 9_rotated_11zon.pdf16 Apr 2025
Details of encumbrances concerned to LegalFile: No encumbrance certificate.pdf16 Apr 2025
Details of encumbrances concerned to LegalFile: Legal Encumbrance certificate.pdf16 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organisation Hrishi Mittal.pdf16 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organisation Nitin Tyagi.pdf16 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organisation Rajeev Tyagi.pdf16 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organisation Ruchi Mittal.pdf16 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organisation Sanjay Tyagi.pdf16 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organisation Suman Mittal.pdf16 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organisation Vinod Mittal.pdf16 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Disclosure - RAMESH BHATIA.pdf16 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of secured unsecured finance.pdf16 Apr 2025

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 delivered late3 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Grande View7 Phase VI Buiding IP52100022032Ambegaon BK, Pune56Aug 2019OngoingJun 2026Registered original: Dec 2023Not delivered
Grandeview7 Phase-VII Bldg-LP52100033228Near Poddar International School, Pune-Feb 2022CompletedDec 2025Registered original: Dec 2024Apr 2025
Grande View7 Capital 1P52100014592Ambegaon Budruk, Pune-Dec 2017OngoingDec 2025Registered original: Apr 2018Not delivered
GV7 CAPITAL 4P52100022958Ambegaon Budruk, Pune-Nov 2019OngoingDec 2025Registered original: Mar 2022Not delivered
Grande View 7 CapitalP52100001308Ambegaon Budruk, Pune-Jul 2017CompletedDec 2024Registered original: Dec 2018Dec 2024
Grande View 7 Phase V Building JP52100019342Ambegaon Budruk, Pune-Jan 2019Certificate SignedJun 2023May 2023
Grande View 7 Phase IV Building F&GP52100017197Ambegaon Bk, Pune-Jul 2018Certificate SignedJan 2022Late, Aug 2022
Grande View 7 Phase III Building KP52100013947AMBEGAON bk, Pune-Nov 2017CompletedDec 2021Jun 2021

How this compares with Pune

37%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GV7 INSIGNIA BUILDING B AND C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBEGAON13,700+ in Pune

Builder: M/S CHIRAG DEVELOPERS

M/S CHIRAG DEVELOPERS has 1 registration on MahaRERA, including GV7 INSIGNIA BUILDING B AND C. Its filings disclose 8 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GV7 INSIGNIA BUILDING B AND C is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GV7 INSIGNIA BUILDING B AND C?

The registered promoter entity is M/S CHIRAG DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GV7 INSIGNIA BUILDING B AND C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GV7 INSIGNIA BUILDING B AND C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GV7 INSIGNIA BUILDING B AND C?

The professionals named in the filing: Architect: Voussoirs THROUGH MR SAMEER VALIMBE; Engineer: DNYANESHWAR AWHALE; Engineer: Siddiki Mujib; Engineer: MAYURESH GIDDE; Chartered Accountant: Pradeep B. More. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GV7 INSIGNIA BUILDING B AND C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GV7 INSIGNIA BUILDING B AND C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GV7 INSIGNIA BUILDING B AND C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.