Registration lapsed No litigation declared Commercial project

Grande View7 Capital 1

By Chirag Developers

RG-MH-26721 · RERA P52100014592 · Last updated on MahaRERA portal: 3 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 92 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Grande View7 Capital 1 is a Commercial project by Chirag Developers in Pune, Maharashtra, registered with MahaRERA as P52100014592 on 15 Dec 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 92 months from the original filing.

At a glance

Project

  • NameGrande View7 Capital 1
  • TypeCommercial
  • Location
    • old katraj by pass hig
    • Ambegaon Budruk
    • AMBEGAON Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014592
  • ReraGenie IDRG-MH-26721

Builder

  • NameChirag Developers
  • Entity typeOthers
  • Named personsVinodkumar J Mittal, Sanjay Shradhanand Tyagi, Rajeev Shradhanand Tyagi, Nitin Balraj Tyagi, Ramesh Parasram Bhatia
  • Other registrations7 more →
  • Completed6 of 8
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

10 months past promisethis monthRegisteredDec 2017First promiseApr 2018Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Dec 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Apr 2018)
  • Buildings1 building record
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Capital 1NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

Capital 1: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities17

As on 3 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
Transformer RoomYes100%
Entrance GateYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,140 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Mahesh Shreepati KokateMarket YardPune
Sujata Ashok KokateMarket YardPune
Infratach EngineersMarket YardPune

Approvals and building plan

Permissible FSI1139.35
Proposed, not sanctioned1,139 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch Ambegaon pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVOUSSOIRS
EngineerSPECTRUM CONSULTANTS
PartnerRole in project
Chirag Developers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001863Apr 2018 → Apr 2021

Reason as filed by the promoterThat the Promoter previously undertakes to complete the Project on or before 30.04.2018 and 30.04.2019, but due to statuary compliance which is in process, and till today we have not sold any area, so consider my new Completion date i.e. 30.04.2021.

EXT52100000450Apr 2018 → Apr 2021

Reason as filed by the promoterThat the Promoter previously undertakes to complete the Project on or before 30.04.2018, But due to statuary compliance which is in process or not complete till today, So consider my new Completion date i.e. 30.04.2019.

EXT52100013906Apr 2018 → Dec 2025

Reason as filed by the promoterRequired project extension 31/12/2025

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration about conveyance deed Capital 1 Amenity 8 11.pdf3 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC.pdf13 Apr 2025
Certificates of CA (Form 3)File: CA.pdf13 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG.pdf13 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD.pdf13 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A.pdf13 Apr 2025
Status of ConveyanceFile: Declaration for conveyance GV7 capital1.pdf21 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC.pdf13 Jan 2025
Certificates of CA (Form 3)File: CA.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf13 Jan 2025
Certificates of CA (Form 3)File: CA.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf13 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf13 Jul 2024
Form 2AFile: FORM 2A.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf13 Jul 2024
Certificates of CA (Form 3)File: FORM 3.pdf13 Jul 2024
Other - LegalFile: LEGAL.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: GRANDE VIEW 7 811 CAPITAL 1.pdf11 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT FORM 1CAPITAL 1 AMENITY BLDG Q4 RERA 2023-24 31032024.pdf8 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 RERA ENGG CERT FORM 2 8 11 AMINITY 31 03 2024.pdf8 Apr 2024
Form 2AFile: Q4 RERA QUALITY CERT-FORM 2A 8 11 AMINITY 31 03 2024.pdf8 Apr 2024
Certificates of CA (Form 3)File: CA CERT FORM 3 CAPITAL 1 BLDG 31 03 2024 Q4 2023 2024.pdf8 Apr 2024
Certificates of CA (Form 3)File: FORM 3 CA CERT CAPITAL 1 8 11 RERA Q3 2023-24.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM - 1 ARCH CERTIFICATE CAPITAL 1 AMENITY BLDG.pdf8 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 ENGG CERTIFICATE CAPITAL 1 AMENITY BLDG.pdf8 Jan 2024
Form 2AFile: FORM - 2A QUALITY CERTIFICATE CAPITAL 1 AMENITY BLDG.pdf8 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 - 2023 ENGG CERTIFICATE - CAPITAL 1 AMINITY BUILDING.pdf7 Oct 2023
Form 2AFile: Q2 - 2023 QUALITY CERTIFICATE - CAPITAL 1 AMINITY BUILDING.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: Q2 - 2023 DISCLOSURE - CAPITAL 1 AMINITY BUILDING.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CAPITAL 1 8 11 AMINITY BUILDING QUALITY CERTIFICATE.pdf10 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CAPITAL 1 8 11 AMINITY BUILDING ARCH CERTIFICATE.pdf16 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CAPITAL 1 8 11 AMINITY BUILDING ENGG CERTIFICATE.pdf16 Jul 2023
Form 2AFile: CAPITAL 1 8 11 AMINITY BUILDING QUALITY CERTIFICATE.pdf16 Jul 2023
Certificates of CA (Form 3)File: CAPITAL 1 8 11 AMINITY BUILDING CA CERTIFICATE.pdf16 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Capital 1 Form 2A_ Year 2022-23- Q2.pdf23 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Capital 1 Form 2A_ Year 2022-23- Q3.pdf23 Feb 2023
Disclosure of sold/ booked inventoryFile: Capital 1- Disclosure of Sold Unsold inventory.pdf23 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1-Capital-1- Gv7.pdf18 Jan 2023
Form 2AFile: Form-2-Capital-1 - Gv7.pdf18 Jan 2023
Form 2AFile: Form-2A-Capital-1-Gv7.pdf18 Jan 2023
Certificates of CA (Form 3)File: Form 3-Amenity Bldg-8-11-Capital-1-Gv7.PDF18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CAPTAL -1 5 FORM.PDF18 Jan 2023
Foreclosure of the ProjectFile: Declaration 8 11.pdf16 Oct 2022
Other - LegalFile: Declaration 8 11.pdf16 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Capital 1 Form 1.pdf14 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Capital 1 Form 2.pdf14 Oct 2022
Form 2AFile: Capital 1 Form 2A.pdf14 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Capital-1 _Form-5 _ Year-2021-22- Amenity-8-11.PDF14 Oct 2022
Declaration about Commencement CertificateFile: capital 1_1_11zon.pdf3 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER S CERTIFICATE.pdf3 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE Gv7 8 11 AMENITY form-4 dec-21.pdf8 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Certificates of Architect 8 11 amenity Capital1.pdf17 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 300921.pdf10 Oct 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate 300921.pdf10 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Grande View Capital I- FY 20-21.PDF1 Oct 2021
Form 2AFile: 811 FORM2A.pdf16 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 811 FORM2A FY 2021.pdf16 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg certificate amenity capital one.pdf15 Aug 2021
Certificates of CA (Form 3)File: Chirag Developers Capital One Form 3.PDF15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Capital 1 Form 5 FY 19-20-4.PDF15 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf21 Jan 2020
Form 2AFile: Form 2A.pdf21 Jan 2020
Certificates of CA (Form 3)File: Certificates of CA.PDF20 Jan 2020
Certificates of CA (Form 5)File: Certificates of CA (Form 5).pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf12 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer_.pdf12 Jun 2019
Form 2AFile: Form 2A_.pdf12 Jun 2019
Certificates of CA (Form 3)File: Certificates of CA (Form 3.PDF12 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (.pdf10 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf10 Mar 2019
Form 2AFile: Form 2.pdf10 Mar 2019
Certificates of CA (Form 3)File: Certificates of CA (Form 3.PDF10 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect.pdf31 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer.pdf31 Dec 2018
Form 2AFile: FORM 2.pdf31 Dec 2018
Certificates of CA (Form 3)File: Certificates of CA.pdf31 Dec 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
S no 12 A wing B wingS no 12 A Grande View 7 AMbegaon bk pune189CompletedDec 2016Jun 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 92 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Grande View7 Capital 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambegaon Budruk13,700+ in Pune

2 kmGrande View7 Capital 1Completed 81Lapsed / revoked 34Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 184 registered projects within 2 km.

Builder: Chirag Developers

Chirag Developers has 8 registrations on MahaRERA, including Grande View 7 Capital and Grande View 7 Phase III Building K. Its filings disclose 8 earlier MahaRERA projects: declares 3 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Grande View7 Capital 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Grande View7 Capital 1 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Grande View7 Capital 1?

The registered promoter entity is Chirag Developers, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Grande View7 Capital 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Grande View7 Capital 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Grande View7 Capital 1?

The professionals named in the filing: Architect: VOUSSOIRS; Engineer: SPECTRUM CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Grande View7 Capital 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Grande View7 Capital 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Grande View7 Capital 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.