Home / Browse projects / Pune, Maharashtra / Grande View 7 Phase V Building J

Completed No litigation declared Residential / Group Housing project

Grande View 7 Phase V Building J

By Chirag Developers

RG-MH-96476 · RERA P52100019342 · Last updated on MahaRERA portal: 3 May 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
1Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Grande View 7 Phase V Building J is a Residential / Group Housing project by Chirag Developers in Pune, Maharashtra, registered with MahaRERA as P52100019342 on 23 Jan 2019. The registration is recorded completed; possession was promised by 30 Jun 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGrande View 7 Phase V Building J
  • TypeResidential / Group Housing
  • Location
    • Old katraj by pass highway
    • Ambegaon Budruk
    • AMBEGAON Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • RERA no.P52100019342
  • ReraGenie IDRG-MH-96476

Builder

  • NameChirag Developers
  • Entity typeOthers
  • Named personsSanjay Shradhanand Tyagi, Rajeev Shradhanand Tyagi, Nitin Balraj Tyagi, Vinodkumar Jaichandlal Mittal, Ramesh Parasram Bhatia
  • Other registrations7 more →
  • Completed6 of 8
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredJan 2019PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jan 2019
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building JNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

Building J: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities18

As on 3 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes60%
Street LightingYes80%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes60%
Open ParkingYes30%
Transformer RoomYes100%
Entrance GateYes50%
Club HouseYes100%

Parking filed150

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots150
Closed/Covered126
Open Space24

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,841 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8473.66
Proposed, not sanctioned8,474 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE BENGAURU HIGHWAY WARJE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpectrum Consultants
ArchitectVoussoirs
PartnerRole in project
Chirag Developers-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000310348Vikramsinh Dnyaneshwar PawarChirag Developers09/02/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 May 2023

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration about conveyance deed Bldg J.pdf3 May 2025
Status of ConveyanceFile: Declaration for conveyance J Buildin.pdf21 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Declearation about commencement certificate c.pdf14 Jan 2025
Declaration about Commencement CertificateFile: Declearation about commencement certificate c.pdf14 Jan 2025
Other - LegalFile: J BUIDING LEGAL.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: J BLDG.pdf16 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: J BLDG QUALITY CERTIFICATE.pdf16 Jul 2023
Certificates of CA (Form 3)File: J BLDG CA CERTIFICATE.pdf16 Jul 2023
Building plan approvalFile: Sanction plan layout CC2700.pdf25 May 2023
Copy of the legal title reportFile: Title report in Format A 1 15.pdf25 May 2023
Copy of the legal title reportFile: Title report in Format A 16 30.pdf25 May 2023
Copy of the legal title reportFile: Title report in Format A 31 45.pdf25 May 2023
Copy of the legal title reportFile: Title report in Format A 46 60.pdf25 May 2023
Copy of the legal title reportFile: Title report in Format A 61 73.pdf25 May 2023
Building Plan Approval (IOD)File: Sanction plan layout CC2700.pdf25 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate CC2700.pdf25 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate from PMC.pdf25 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate.pdf25 May 2023
Certificates of CA (Form 3)File: Bldg J Form 3_11zon.pdf29 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg J Form 1.pdf12 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bldg J Form 2.pdf12 Oct 2022
Form 2AFile: Bldg J Form 2A.pdf12 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate.pdf29 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: J-BLDG engg certificate june.pdf29 Jul 2022
Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf29 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect cerfying.pdf26 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf26 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSU.pdf26 May 2022
CERSAI detailsFile: CERSAI_Search_Report_Grande View7.pdf26 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: J- BUILDING SOCIETY FORMATION CERTIFICATE.pdf29 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE J form-4 dec-21.pdf8 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: J- BUILDING SOCIETY FORMATION CERTIFICATE.pdf2 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 300921.pdf10 Oct 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate 300921.pdf10 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 -Phase v Building J- FY 20-21.PDF1 Oct 2021
Declaration about Commencement CertificateFile: Declaration about CC_compressed.pdf29 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: J BLDG SOCIETY FORMATION CERTIFICATE 6 7 AMBEGAON.pdf4 Sep 2021
Form 2AFile: GV7_j_ quality assurance.pdf16 Aug 2021
Certificates of CA (Form 3)File: Form 03 Chirag Dev J Bldg_compressed.pdf16 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE J-compressed.pdf15 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate j-bldg.pdf15 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: J architect certificate.pdf23 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: j building.pdf23 Jun 2021
Form 2AFile: J BLDG - QUALITY CERTI (1).pdf23 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificates of Architect (Form 1).pdf29 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Certificates of Engineer (Form 2).pdf29 Jan 2021
Form 2AFile: Form 2A.pdf29 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: J RERA Form 5 FY 19-20.pdf15 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate.pdf5 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf5 Oct 2020
Form 2AFile: Form 2A.pdf5 Oct 2020
Certificates of CA (Form 3)File: Certificates of CA.PDF5 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf19 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate.pdf19 Mar 2020
Form 2AFile: Form 2A.pdf19 Mar 2020
Certificates of CA (Form 3)File: Certificates of CA (Form 3).PDF19 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate.pdf21 Jan 2020
Form 2AFile: Form 2A.pdf21 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate.pdf20 Jan 2020
Certificates of CA (Form 3)File: Certificates of CA.PDF20 Jan 2020
Form 2AFile: Form 2A.pdf12 Dec 2019
Copy of the legal title reportFile: Copy of the legal title report 1 Part.pdf19 Jan 2019
Copy of the legal title reportFile: Copy of the legal title report 2 Part.pdf19 Jan 2019
Copy of the legal title reportFile: Copy of the legal title report 3 Part.pdf19 Jan 2019
Copy of the legal title reportFile: Copy of the legal title report 4 Part.pdf19 Jan 2019
Declaration in FORM BFile: Declaration in FORM B.pdf19 Jan 2019
Form 2AFile: Copy of the legal title report 1 Part.pdf19 Jan 2019
Building plan approvalFile: Building Plan Approval IOD.pdf10 Jan 2019
Building plan approvalFile: Building Plan Approval IOD.pdf10 Jan 2019
Building plan approvalFile: Building Plan Approval IOD.pdf10 Jan 2019
Building plan approvalFile: Building Plan Approval IOD.pdf10 Jan 2019
Building plan approvalFile: Building Plan Approval IOD.pdf10 Jan 2019
Layout approvalFile: Copy of Layout Approval (in case of layout).pdf10 Jan 2019
PAN CardFile: PAN Card.pdf10 Jan 2019
Details of encumbrancesFile: Details of encumbrances.pdf10 Jan 2019
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval (in case of layout).pdf10 Jan 2019
Building Plan Approval (IOD)File: Building Plan Approval IOD.pdf10 Jan 2019
Building Plan Approval (IOD)File: Building Plan Approval IOD.pdf10 Jan 2019
Building Plan Approval (IOD)File: Building Plan Approval IOD.pdf10 Jan 2019
Building Plan Approval (IOD)File: Building Plan Approval IOD.pdf10 Jan 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
8/12 A B Wings.no 8.12 Grande view 7 Ambegaon Bk pune2CompletedJun 2016Late, Dec 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Grande View 7 Phase V Building J on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambegaon Budruk13,700+ in Pune

Builder: Chirag Developers

Chirag Developers has 8 registrations on MahaRERA, including Grande View 7 Capital and Grande View 7 Phase III Building K. Its filings disclose 8 earlier MahaRERA projects: declares 3 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Grande View 7 Phase V Building J is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Grande View 7 Phase V Building J?

The registered promoter entity is Chirag Developers, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Grande View 7 Phase V Building J?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Grande View 7 Phase V Building J?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Grande View 7 Phase V Building J?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Grande View 7 Phase V Building J?

The professionals named in the filing: Architect: Spectrum Consultants; Architect: Voussoirs. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Grande View 7 Phase V Building J?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Grande View 7 Phase V Building J. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Grande View 7 Phase V Building J to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.