Grande View 7 Phase IV Building F&G
RG-MH-98165 · RERA P52100017197 · Last updated on MahaRERA portal: 3 May 2025
Source: official MahaRERA filing
Red flags
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Grande View 7 Phase IV Building F&G is a Residential / Group Housing project by CHIRAG DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100017197 on 23 Jul 2018. The registration is recorded completed; possession was promised by 31 Jan 2022.
At a glance
Project
- NameGrande View 7 Phase IV Building F&G
- TypeResidential / Group Housing
- Location
- Grande View 7 Ambegaon BK
- Ambegaon Bk
- Haveli
- Pune
- 411046
- Pincode411046
- RERA no.P52100017197
- ReraGenie IDRG-MH-98165
Builder
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Jul 2018
- Promised completion31 Jan 2022
- Revised completionNone
- Buildings1 building record
- Documents filed118 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| FG Wing | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
FG Wing: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities19
As on 3 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 15% |
| Water Supply | Yes | 30% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 25% |
| Landscaping & Tree Planting | Yes | 15% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 30% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 30% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 30% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 30% |
| Club House 1 | Yes | 30% |
| Entrance Gate | Yes | 0% |
| swimming pool | No | Not applicable |
| Transformer Room | Yes | 100% |
Parking filed104
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Voussoirs |
| Engineer | Spectrum consultants |
| Partner | Role in project |
|---|---|
| CHIRAG DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe promoter previously undertakes to complete the project before 31.01.2022,but due to pandemic situation,shortage of labours and ,materials,and then after statutory compliance's,we will not be in position to complete before 30.01.2022.so consider new completion date as 31.07.2022
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 Apr 2025
Documents filed118
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration about conveyance deed Bldg FG.pdf | 3 May 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Form 4 Bldg FG.pdf | 21 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bldg FG OC Building Completion.pdf | 21 Apr 2025 |
| Other - TechnicalFile: Form 4 Bldg FG.pdf | 21 Apr 2025 |
| Building plan approvalFile: Sanction plan CC270022 Dt 100123.pdf | 14 Jan 2025 |
| Building Plan Approval (IOD)File: Sanction plan CC270022 Dt 100123.pdf | 14 Jan 2025 |
| Declaration about Commencement CertificateFile: Declearation about commencement certificate c.pdf | 14 Jan 2025 |
| Other - LegalFile: F G BUIDING LEGAL DECLARATION.pdf | 17 Jul 2024 |
| Layout approvalFile: Sanction plan layout CC2700.pdf | 31 May 2023 |
| Copy of the legal title reportFile: Title report in Format A 1 15.pdf | 31 May 2023 |
| Copy of the legal title reportFile: Title report in Format A 16 30.pdf | 31 May 2023 |
| Copy of the legal title reportFile: Title report in Format A 31 45.pdf | 31 May 2023 |
| Copy of the legal title reportFile: Title report in Format A 46 60.pdf | 31 May 2023 |
| Copy of the legal title reportFile: Title report in Format A 61 73.pdf | 31 May 2023 |
| Copy of Layout Approval (in case of layout)File: Sanction plan layout CC2700.pdf | 31 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate CC2700.pdf | 31 May 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Grandeview7_Building FG _ OC _ Building Completion.pdf | 29 Oct 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Grandeview7_Building FG _ OC _ Building Completion.pdf | 29 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_compressed.pdf | 26 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FG-BLDG engg certificate june-22_compressed (1).pdf | 26 Jul 2022 |
| Form 2AFile: FG-BLDG engg certificate june-22_compressed.pdf | 26 Jul 2022 |
| Certificates of CA (Form 3)File: RERA Form 3 Chirag FG Bldg.pdf | 26 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_1_11zon.pdf | 28 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 28 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE.pdf | 28 May 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_Grande View7.pdf | 28 May 2022 |
| Certificates of CA (Form 3)File: CA Certficate.PDF | 28 May 2022 |
| Certificates of CA (Form 3)File: CA Certficate.PDF | 28 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Engineers Certificate.pdf | 28 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE FG BLDG GV7 form-4 dec-21.pdf | 8 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 300921.pdf | 10 Oct 2021 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate 300921.pdf | 10 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 -Phase Iv Building F G FY 20-21.PDF | 1 Oct 2021 |
| Declaration about Commencement CertificateFile: Declaration about CC_compressed.pdf | 23 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Sold or unsold inventory_compressed.pdf | 23 Aug 2021 |
| Form 2AFile: GV7_fg_ quality assurance.pdf | 20 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA FG 2021.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE FG-compressed.pdf | 15 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate fg-bldg.pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: Chirag developers SNO 6 fAND G.PDF | 15 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect cerificate FG.pdf | 23 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FG building.pdf | 23 Jun 2021 |
| Form 2AFile: FG BLDG - QUALITY CERTI1 (1).pdf | 23 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf | 28 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf | 28 Jan 2021 |
| Form 2AFile: Form 2A.pdf | 28 Jan 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FG Form 5 FY 19-20-2.pdf | 15 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer.pdf | 3 Oct 2020 |
| Certificates of CA (Form 3)File: Certificates of CA.pdf | 3 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect_.pdf | 15 Sep 2020 |
| Form 2AFile: Form 2A.pdf | 15 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf | 17 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf | 17 Mar 2020 |
| Form 2AFile: Form 2A.pdf | 17 Mar 2020 |
| Certificates of CA (Form 3)File: Certificates of CA (Form 3).PDF | 17 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf | 21 Jan 2020 |
| Form 2AFile: Form 2A.pdf | 21 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect.pdf | 20 Jan 2020 |
| Certificates of CA (Form 3)File: Certificates of CA (Form 3).PDF | 20 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate_FG_30 Sept 2019.pdf | 30 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_FG_30 Sept 2019.pdf | 30 Nov 2019 |
| Form 2AFile: QUALITY CERTIFICATE F G.pdf | 30 Nov 2019 |
| Certificates of CA (Form 3)File: CA Certificate FG_30 Sept 2019.PDF | 30 Nov 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Formation of Legal Entity.pdf | 6 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 4).pdf | 30 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect.pdf | 30 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 30 Sep 2019 |
| Certificates of CA (Form 3)File: Certificates of CA.PDF | 30 Sep 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: Annual Audit Report of Statutory CA (Form 5).pdf | 30 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect.pdf | 18 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2)(Mandatory for only ongoing project)-compressed.pdf | 18 Jul 2019 |
| Form 2AFile: Form 2A.pdf | 18 Jul 2019 |
| Certificates of CA (Form 3)File: Certificates of CA (Form 3).PDF | 18 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect.pdf | 30 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer.pdf | 30 May 2019 |
| Form 2AFile: FORM 2A.pdf | 30 May 2019 |
| Certificates of CA (Form 3)File: Certificates of CA.PDF | 30 May 2019 |
| Copy of the legal title reportFile: Copy of the legal title report 1 Part.pdf | 6 Mar 2019 |
| Copy of the legal title reportFile: Copy of the legal title report 2 Part.pdf | 6 Mar 2019 |
| Copy of the legal title reportFile: Copy of the legal title report 3 Part.pdf | 6 Mar 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| 8/12 A B WING | S.no 8.12 Grande view7 Ambegaon Bk pune | 189 | Completed | Jun 2016 | Late, Nov 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations, which the RERA portal never shows together
- All 118 filed documents as one ZIP, foldered, with a manifest
Keep Grande View 7 Phase IV Building F&G on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ambegaon Bk13,700+ in Pune
Sai Nagari Phase I
Saikedareshwar Developers LLP
SAI NAGARI Phase V
Saikedareshwar Developers LLP
Sai Nagari Phase II
Saikedareshwar Developers LLP
Sai Nagari Phase IV
Saikedareshwar Developers LLP
Sai Nagari Phase III
Saikedareshwar Developers LLP
Bella Casa - Phase 1
Kakkad Infra LLP
Builder: CHIRAG DEVELOPERS
Chirag Developers has 8 registrations on MahaRERA, including Grande View 7 Capital and Grande View 7 Phase III Building K. Its filings disclose 8 earlier MahaRERA projects: declares 3 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Grande View 7 Phase IV Building F&G is delayed beyond 31 Jan 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Grande View 7 Phase IV Building F&G?
The registered promoter entity is CHIRAG DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Grande View 7 Phase IV Building F&G?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Grande View 7 Phase IV Building F&G?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Grande View 7 Phase IV Building F&G?
The professionals named in the filing: Architect: Voussoirs; Engineer: Spectrum consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Grande View 7 Phase IV Building F&G?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback