Completed No litigation declared Residential / Group Housing project

Grande View 7 Phase III Building K

By Chirag Developers

RG-MH-26412 · RERA P52100013947 · Last updated on MahaRERA portal: 3 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

Grande View 7 Phase III Building K is a Residential / Group Housing project by Chirag Developers in Pune, Maharashtra, registered with MahaRERA as P52100013947 on 2 Nov 2017. The registration is recorded completed; possession was promised by 30 Dec 2021.

At a glance

Project

  • NameGrande View 7 Phase III Building K
  • TypeResidential / Group Housing
  • Location
    • Ambegaon bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100013947
  • ReraGenie IDRG-MH-26412

Builder

  • NameChirag Developers
  • Entity typeOthers
  • Named personsSANJAY SHRADHANAND TYAGI, RAJEEV SHRADHANAND TYAGI, NITIN BALRAJ TYAGI, VINODKUMAR JAICHANDLAL MITTAL, RAMESH PARASRAM BHATIA
  • Other registrations7 more →
  • Completed6 of 8
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredNov 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Nov 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed113 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING KNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BUILDING K: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 3 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes30%
Transformer RoomYes100%
swimming poolNoNot applicable
Club HouseYes30%
Entrance GateYes30%

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered98
Open Space68

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,950 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7033.92
Proposed, not sanctioned7,181 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARIMAN POINT MUMBAI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVOUSSOIRS
EngineerSPECTRUM CONSULTANTS
PartnerRole in project
Chirag Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Aug 2021

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration about conveyance deed Bldg K.pdf3 May 2025
Declaration about Commencement CertificateFile: DECLARATION on Commencment Certificate from Promoter Format D.pdf21 Apr 2025
Status of ConveyanceFile: declaration for conveyance building K GRAND VIEW 7.pdf21 Jan 2025
Building plan approvalFile: Sanction plan CC270022 Dt 100123.pdf14 Jan 2025
Building Plan Approval (IOD)File: Sanction plan CC270022 Dt 100123.pdf14 Jan 2025
Declaration about Commencement CertificateFile: Declearation about commencement certificate c.pdf14 Jan 2025
OtherFile: K BUIDING LEGAL DECLARATION.pdf19 Jul 2024
Layout approvalFile: Sanction plan layout CC2700.pdf31 May 2023
Copy of the legal title reportFile: Title report in Format A 1 15.pdf31 May 2023
Copy of the legal title reportFile: Title report in Format A 16 30.pdf31 May 2023
Copy of the legal title reportFile: Title report in Format A 31 45.pdf31 May 2023
Copy of the legal title reportFile: Title report in Format A 46 60.pdf31 May 2023
Copy of the legal title reportFile: Title report in Format A 61 73.pdf31 May 2023
Copy of Layout Approval (in case of layout)File: Sanction plan layout CC2700.pdf31 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate CC2700.pdf31 May 2023
Status of ConveyanceFile: Declaration for conveyance k Building.pdf27 May 2023
CERSAI detailsFile: CERSAI_Search_Report_Grande View7.pdf26 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 -Phase Iii Building K- FY 20-21.PDF1 Oct 2021
Declaration about Commencement CertificateFile: Declaration about CC_compressed.pdf29 Sep 2021
OtherFile: OC k wing.pdf4 Sep 2021
OtherFile: Form 4 k wing.pdf4 Sep 2021
Form 2AFile: K FORM 2A.pdf16 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: K FORM 2A FY 20-21.pdf16 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: K BUILDING RERA CERTIFICATE.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate k-bldg.pdf12 Aug 2021
Form 2AFile: K QA (FORM 2A).pdf12 Aug 2021
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 RERA CERTIFICATE FOR K BUILDING.pdf12 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Grandeview7 SNo 6 Building K Completion Certificate from PMC.pdf11 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: K architect certificate.pdf22 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: K building.pdf22 Jun 2021
Form 2AFile: K BLDG - QUALITY CERTI (1) (1).pdf22 Jun 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERTIFICATE K.pdf29 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf27 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf27 Jan 2021
Form 2AFile: Form 2A.pdf27 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: K Form 5 FY 19-20-1.pdf15 Jan 2021
Certificates of CA (Form 3)File: K Bldg July 20 PDF.pdf3 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect_.pdf21 Sep 2020
Form 2AFile: Form 2A.pdf21 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf16 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf16 Mar 2020
Form 2AFile: Form 2A.pdf16 Mar 2020
Certificates of CA (Form 5)File: Certificates of CA (Form 5).PDF16 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf21 Jan 2020
Form 2AFile: Form 2A.pdf21 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect.pdf20 Jan 2020
Certificates of CA (Form 3)File: Certificates of CA.PDF20 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect_K_30 Sept 2019.pdf30 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Architect.pdf28 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer.pdf28 Nov 2019
Form 2AFile: Form 2A.pdf28 Nov 2019
Certificates of CA (Form 3)File: Certificates of CA.PDF28 Nov 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Formation of Legal Entity.pdf6 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2)(Mandatory for only ongoing project)-compressed.pdf30 Sep 2019
Certificates of CA (Form 3)File: Certificates of CA (Form 3).PDF30 Sep 2019
Certificates of CA (Form 5)File: Certificates of CA (Form 5).pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf25 Jul 2019
Form 2AFile: Form 2A.pdf25 Jul 2019
Certificates of CA (Form 3)File: Certificates of CA (Form 3).PDF25 Jul 2019
Form 2AFile: Form 2A.pdf12 Jun 2019
PAN CardFile: Copy of the legal title report 1 Part.pdf6 Mar 2019
Copy of the legal title reportFile: Copy of the legal title report 1 Part.pdf6 Mar 2019
Copy of the legal title reportFile: Copy of the legal title report 2 Part.pdf6 Mar 2019
Copy of the legal title reportFile: Copy of the legal title report 3 Part.pdf6 Mar 2019
Copy of the legal title reportFile: Copy of the legal title report 4 Part.pdf6 Mar 2019
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf6 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf5 Mar 2019
Form 2AFile: Form 2A.pdf5 Mar 2019
Declaration in FORM BFile: Declaration in FORM B.pdf19 Feb 2019
Building plan approvalFile: 22-ilovepdf-compressed.pdf7 Feb 2019
Building plan approvalFile: 23-ilovepdf-compressed.pdf7 Feb 2019
Building plan approvalFile: 24-ilovepdf-compressed.pdf7 Feb 2019
Building plan approvalFile: 25-ilovepdf-compressed.pdf7 Feb 2019
Building plan approvalFile: 27-ilovepdf-compressed.pdf7 Feb 2019
Building plan approvalFile: 28-ilovepdf-compressed.pdf7 Feb 2019
Building plan approvalFile: 29-ilovepdf-compressed.pdf7 Feb 2019
Building Plan Approval (IOD)File: 22-ilovepdf-compressed.pdf7 Feb 2019
Building Plan Approval (IOD)File: 23-ilovepdf-compressed.pdf7 Feb 2019
Building Plan Approval (IOD)File: 24-ilovepdf-compressed.pdf7 Feb 2019
Building Plan Approval (IOD)File: 25-ilovepdf-compressed.pdf7 Feb 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
S NO 8 12 A WING B WINGS.NO 8.12 Grande View7 Ambegaon BK pune189CompletedJun 2016Late, Nov 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Grande View 7 Phase III Building K on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBEGAON bk13,700+ in Pune

2 kmGrande View 7 Phase III Completed 81Lapsed / revoked 36Other 71Dot size: filed unitsN

Filed coordinates, straight-line distance. 188 registered projects within 2 km.

Builder: Chirag Developers

Chirag Developers has 8 registrations on MahaRERA, including Grande View 7 Capital and Grande View 7 Phase III Building K. Its filings disclose 8 earlier MahaRERA projects: declares 3 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Grande View 7 Phase III Building K is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Grande View 7 Phase III Building K?

The registered promoter entity is Chirag Developers, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Grande View 7 Phase III Building K?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Grande View 7 Phase III Building K?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Grande View 7 Phase III Building K?

The professionals named in the filing: Architect: VOUSSOIRS; Engineer: SPECTRUM CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Grande View 7 Phase III Building K?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Grande View 7 Phase III Building K. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Grande View 7 Phase III Building K to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.