Sai Nagari Phase III

By Saikedareshwar Developers LLP

RG-MH-74570 · RERA P52100052837 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 75.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2029Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 55%
115 of 444Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Sai Nagari Phase III is a Others project by Saikedareshwar Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100052837 on 5 Oct 2023. Possession is promised by 28 May 2029. 329 of the 444 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameSai Nagari Phase III
  • TypeOthers
  • Location
    • nimbalkarwadi
    • Pune
    • Pune (M Corp.)
    • Pune City
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052837
  • ReraGenie IDRG-MH-74570

Builder

  • NameSaikedareshwar Developers LLP
  • Entity typePartnership
  • GSTIN27AEGFS9413P1ZA
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersVishal Suresh Pawar, Vivek Suresh Pawar
  • Other registrations4 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredOct 2023PromisedMay 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion28 May 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed66 files

Current status

74%329 of 444 units booked

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
07 Building GNA16142220222
08 Building HNA16142220222

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 55%.

07 Building G42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
08 Building H42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed556

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots556
Open Space556
BuildingOpen SpaceTotal
07 Building G278278
08 Building H278278

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,350 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 75.00 crore
CERSAI search filedYes
Declared on30 Oct 2025

Approvals and building plan

Sanctioning authorityMHADA Mumbai
Permissible FSI17230.76
Proposed, not sanctioned17,231 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor KPCT Mall B Wing S No 16 Fatima Nagar Pune 411040

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmruta Deshpande
EngineerAkash Pawar
Chartered AccountantPranal p Thakare
Chartered AccountantMayank Kriplani
Chartered AccountantDurgesh v Vyawahare
Chartered AccountantRAKESH M & ASSOCIATES
PartnerRole in project
Saikedareshwar Developers LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 May 2029

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Phase III Q4.pdf24 Apr 2026
Form 2File: Form 2 Phase III Q4.pdf24 Apr 2026
Form 3File: Form 3 Phase III Q4.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Phase III Sold Unsold Inventory.pdf24 Apr 2026
Form 1File: Form 1 Ph III.pdf20 Jan 2026
Form 2File: Form 2 Ph 3.pdf20 Jan 2026
Form 3File: Form III Ph 3.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Ph 3.pdf20 Jan 2026
Form 1File: Form 1 Phase 3.pdf20 Oct 2025
Form 2File: Form 2 Phase 3.pdf20 Oct 2025
Form 3File: Form 3 Phase 3.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unslod Phase 3.pdf20 Oct 2025
Form 1File: P-3 Form 1 30-06-2025.pdf29 Jul 2025
Form 2File: P-3 Form 2 30-06-2025.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: P-3 Flat Sold Unsold 30-06-2025.pdf29 Jul 2025
Form 3File: P-3 Form 3 30-06-2025.pdf29 Jul 2025
Layout approvalFile: Layout 2025.pdf23 May 2025
Building plan approvalFile: G H WING Compressed.pdf23 May 2025
Copy of Layout Approval (in case of layout)File: Layout 2025.pdf23 May 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf23 May 2025
Building Plan Approval / NA Order for plotted developmentFile: G H WING Compressed.pdf23 May 2025
Other - FinanceFile: Declaration Form 5 (1).pdf9 May 2025
Details of encumbrances concerned to FinanceFile: Declaration Of Finance and Legal p-3.pdf24 Feb 2025
Details of encumbrances concerned to LegalFile: Declaration Of Finance and Legal p-3.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: P-III Sold Unsold_11zon.pdf22 Feb 2025
CERSAI detailsFile: Cersai Declaration Phase 3.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Phase 3.pdf11 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Phase 3.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form-5.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA Phase III Sai Nagari.pdf14 May 2024
CERSAI detailsFile: PHASE-III.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA- Phase III.pdf23 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate- Sai Nagari.pdf7 Feb 2024
Disclosure of sold/ booked inventoryFile: Unslod G Bldg.pdf7 Feb 2024
Disclosure of sold/ booked inventoryFile: Unsold H Bldg.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration- III No Withdrawal.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 GH Blg.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase III.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Phase III.pdf6 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Separate Bank Account Phase III.pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of interest in other project.pdf26 Sep 2023
Layout approvalFile: Sai nagari Lay Out All Blgs Sanction-1-14_compressed.pdf6 Sep 2023
Layout approvalFile: Phase III G H Typical Floor Sanction-12-14_compressed.pdf6 Sep 2023
Building plan approvalFile: sai nagari plinth cc.pdf6 Sep 2023
PAN CardFile: PAN CARD SAI KEDARESHWAR.pdf6 Sep 2023
Copy of the legal title reportFile: New Search and Title Report Phase III Compressed.pdf6 Sep 2023
Details of encumbrances concerned to FinanceFile: Encumbrance to Finance and Legal.pdf6 Sep 2023
Details of encumbrances concerned to LegalFile: Encumbrance to Finance and Legal.pdf6 Sep 2023
Copy of Layout Approval (in case of layout)File: Sai nagari Lay Out All Blgs Sanction-1-14_compressed.pdf6 Sep 2023
Copy of Layout Approval (in case of layout)File: Phase III G H Typical Floor Sanction-12-14_compressed.pdf6 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: sai nagari plinth cc.pdf6 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: sai nagari plinth cc.pdf6 Sep 2023
Declaration about Commencement CertificateFile: Declaration of CC.pdf6 Sep 2023
Declaration in FORM BFile: Form B_ Phase III.pdf6 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf6 Sep 2023
CERSAI detailsFile: Self Declaration - CERSAI.pdf6 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Phase III.pdf6 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Vivek_Discloser of interest in Project.pdf6 Sep 2023
Proforma of Allotment letterFile: Allotment Letter Phase -III.pdf6 Sep 2023
Proforma of Agreement for saleFile: Proforma of AGREEMENT for Rera.pdf6 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf6 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation of Allotment letter.pdf6 Sep 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation - Agreement to sale.pdf6 Sep 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Sai Nagari Phase IVP52100078517Katraj, Pune, Pune457Dec 2024OngoingDec 2029Not due yet
Sai Nagari Phase IIP52100052977Gujarnimbalkarwadi, Pune530Oct 2023OngoingMay 2029Not due yet
Sai Nagari Phase IP52100052996Gujarnimbalkarwadi, Pune765Oct 2023OngoingMay 2029Not due yet

How this compares with Pune

74%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Nagari Phase III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmSai Nagari Phase IIICompleted 38Lapsed / revoked 26Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 96 registered projects within 2 km.

Builder: Saikedareshwar Developers LLP

Saikedareshwar Developers LLP has 5 registrations on MahaRERA, including Sai Nagari Phase I and Sai Nagari Phase II. Its filings disclose 6 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sai Nagari Phase III is delayed beyond 28 May 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Nagari Phase III?

The registered promoter entity is Saikedareshwar Developers LLP, a partnership as per the filing. Its GSTIN 27AEGFS9413P1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Nagari Phase III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Nagari Phase III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Nagari Phase III?

The professionals named in the filing: Architect: Amruta Deshpande; Engineer: Akash Pawar; Chartered Accountant: Pranal p Thakare; Chartered Accountant: Mayank Kriplani; Chartered Accountant: Durgesh v Vyawahare; Chartered Accountant: RAKESH M & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Nagari Phase III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Nagari Phase III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Nagari Phase III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.