ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / GURUPRASAD DIVINE RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

GURUPRASAD DIVINE RESIDENCY

By ROHINTON MEHTA BUILDERS AND DEVELOPERS

RG-MH-23863 · RERA P51900009197 · Last updated on MahaRERA portal: 31 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 72 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
1 of 11Construction stages donefurthest along: Excavation, 85%
36 of 94Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

GURUPRASAD DIVINE RESIDENCY is a Residential / Group Housing project by ROHINTON MEHTA BUILDERS AND DEVELOPERS in Mumbai City, Maharashtra, registered with MahaRERA as P51900009197 on 22 Aug 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 72 months from the original filing. 58 of the 94 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameGURUPRASAD DIVINE RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Pt.C.R.Vyas Marg
    • Chembur
    • Mumbai City
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900009197
  • ReraGenie IDRG-MH-23863

Builder

  • NameROHINTON MEHTA BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnerCuboid Realty Private Limited

Key dates

16 months past promisethis monthRegisteredAug 2017First promiseJun 2019Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Aug 2017
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed104 files

Current status

62%58 of 94 units booked

Figures as on 31 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GURUPRASAD DIVINE RESIDENCYNA1916801494

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 85%.

GURUPRASAD DIVINE RESIDENCY: 59% average across the applicable activities

ActivityProgress
Excavation85%
Basement (if any)70%
Podiums (if any)20%
Plinth70%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 31 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered82

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,732 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI4677.75
Proposed, not sanctioned1,732 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGhatkopar East

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
ROHINTON MEHTA BUILDERS AND DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900001911Jun 2019 → Jun 2020

Reason as filed by the promoterTo, RERA Authority Sub: Application for Project extension Respected Sir / Madam This plot is under lease given by the collector having B-1 Land Tenure and was allotted to three societies viz (i) Chembur Guruprasad Co.Op.Hsg.Soc.Ltd (ii) Himgiri Co.Op.Hsg.Soc Ltd (iii) Mena Society. All the three societies have their clear cut plot demarcated and had their access as per norms then and developed flats which were handed over to the respective clients. Over period of time encroachment started on 7.50 Mtr wide lay-out road which was specifically meant as the exclusive access to Mena society. In spa

EXT51900011099Jun 2019 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of the project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of pandemic of Covid-19. We have consent of75% allottees for purpose of extension of RERA registration period of the said project.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000193134Ms. Komal Puneet DaveRohinton Mehta Builders and Developers10/08/2020
CC12501650Maithili Makarand BhagwatROHINTON MEHTA BUILDERS AND DEVELOPERS21/05/2025
CC12602105Maithili Makarand BhagwatROHINTON MEHTA BUILDERS AND DEVELOPERS10/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Jan 2024

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf31 Mar 2026
Withdrawal Update Form 2File: 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3 - Guruprasad Divine Residency as on Sep 2025.pdf31 Mar 2026
Certificates of CA (Form 3)File: Form 3 - Guruprasad Divine Residency as on June 2024.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Guruprasad Divine Residency as on Sept 2024.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Guruprasad Divine Residency as on Dec 2024.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Guruprasad Divine Residency as on June 2024.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Guruprasad Divine Residency as on Sept 2024.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Guruprasad Divine Residency as on Dec 2024.pdf20 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of CA (Form 3)File: 19 Certificates of CA (Form 3).pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Guruprasad Divine Residency as on March 2024.pdf5 Jun 2024
Declaration about Commencement CertificateFile: Format D (32).pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29(1).pdf30 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Guruprasad Divine Residency Form 5 FY 22-23.pdf30 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Guruprasad Divine Residency as on March 2024 (REVISED).pdf27 Apr 2024
Certificates of CA (Form 3)File: Form 3 - Guruprasad Divine Residency as on March 2024 (REVISED).pdf27 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Guruprasad Divine Residency as on March 2024.pdf24 Apr 2024
Certificates of CA (Form 3)File: Form 3 - Guruprasad Divine Residency as on March 2024.pdf24 Apr 2024
Certificates of CA (Form 3)File: Form 3 of Guruprasad Divine Residency as on 31st December 2023[1].pdf23 Apr 2024
Certificates of CA (Form 3)File: Form 3 of Guruprasad Divine Residency as on 31st December 2023.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate 2019-20.pdf9 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate 2021-22.pdf9 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate 2022-23.pdf9 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - GURUPRASAD DIVINE RESIDENCY.pdf1 Mar 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29_11zon.pdf28 Feb 2024
Certificates of CA (Form 3)File: Final Form 3 of Guruprasad Divine Residency as on 31st December 2023.pdf28 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2407880_OC_signed.pdf19 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Guruprasad Divine Residency as on Dec 2022.pdf18 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Guruprasad Divine Residency as on March 2023.pdf18 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Guruprasad Divine Residency as on June 2023.pdf18 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Guruprasad Divine Residency as on Sept 2023.pdf18 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Guruprasad Divine Residency as on Dec 2023.pdf18 Jan 2024
Certificates of CA (Form 3)File: Form 3 of Guruprasad Divine Residency as on 31st December 2022.pdf18 Jan 2024
Certificates of CA (Form 3)File: Form 3 of Guruprasad Divine Residency as on 31st March 2023.pdf18 Jan 2024
Certificates of CA (Form 3)File: Form 3 of Guruprasad Divine Residency as on 30th June 2023.pdf18 Jan 2024
Certificates of CA (Form 3)File: Form 3 of Guruprasad Divine Residency as on 30th September 2023.pdf18 Jan 2024
Certificates of CA (Form 3)File: Form 3 of Guruprasad Divine Residency as on 31st December 2023.pdf18 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Guruprasad Divine Residency as on Dec 2023.pdf9 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Guruprasad Divine Residency as on March 2023.pdf23 Nov 2023
Certificates of CA (Form 3)File: Form 3- Guruprasad Divine Residency as on March 2023_compressed.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Guruprasad Divine Residency Form 5.pdf26 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Guruprasad Divine Residency Form 5 FY 22-23.pdf26 Sep 2023
Proforma of Agreement for saleFile: NEW RESIDENTIAL AFS as on 14-03-2023.pdf16 Aug 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE- COMMERCIAL as on 28-07-2023.pdf16 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Guruprasad Divine Residency Mar 22 - Form 2.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Guruprasad Divine Residency Jun 22 - Form 2.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Guruprasad Divine Residency Sept 22 - Form 2.pdf2 May 2023
Certificates of CA (Form 3)File: Form 3- Guruprasad Divine Residency as on March 2022.pdf2 May 2023
Certificates of CA (Form 3)File: Form 3- Guruprasad Divine Residency as on June 2022.pdf2 May 2023
Certificates of CA (Form 3)File: Form 3- Guruprasad Divine Residency as on September 2022.pdf2 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Guruprasad Divine Residency Form 5.pdf10 Apr 2023
Details of encumbrancesFile: Encumbrance Letter for Guruprasad Divine Residency.pdf8 Mar 2023
Layout approvalFile: Drawing(76)_compressed-1.pdf10 Jan 2022
Building plan approvalFile: Drawing(76)_compressed-2.pdf10 Jan 2022
Building plan approvalFile: Drawing(76)_compressed-3.pdf10 Jan 2022
Building plan approvalFile: Drawing(76)_compressed-4.pdf10 Jan 2022
Copy of Layout Approval (in case of layout)File: Drawing(76)_compressed-1.pdf10 Jan 2022
Building Plan Approval (IOD)File: Drawing(76)_compressed-2.pdf10 Jan 2022
Building Plan Approval (IOD)File: Drawing(76)_compressed-3.pdf10 Jan 2022
Building Plan Approval (IOD)File: Drawing(76)_compressed-4.pdf10 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: 1217709804NoteSheet_15_signed.pdf10 Jan 2022
Declaration about Commencement CertificateFile: Format D - revised_compressed.pdf10 Jan 2022
Proforma of Allotment letterFile: Draft of Agreement.pdf30 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - Guruprasad Divine Residency.pdf15 Dec 2021
CERSAI detailsFile: Guruprasad Divine Residency.pdf15 Dec 2021
Building plan approvalFile: iod plan - rohiton builders-2.pdf9 Dec 2021
Building plan approvalFile: iod plan - rohiton builders-3.pdf9 Dec 2021
Building plan approvalFile: iod plan - rohiton builders-4_11zon.pdf9 Dec 2021
Building plan approvalFile: iod plan - rohiton builders-5_11zon.pdf9 Dec 2021
Building Plan Approval (IOD)File: iod plan - rohiton builders-2.pdf9 Dec 2021
Building Plan Approval (IOD)File: iod plan - rohiton builders-3.pdf9 Dec 2021
Building Plan Approval (IOD)File: iod plan - rohiton builders-4_11zon.pdf9 Dec 2021
Building Plan Approval (IOD)File: iod plan - rohiton builders-5_11zon.pdf9 Dec 2021
Declaration about Commencement CertificateFile: Format D.pdf3 Dec 2021
Disclosure of sold/ booked inventoryFile: GURUPRASAD CHSL SOLD UNSOLD INVENTORY RERA .pdf3 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Guruprasad Divine Residency March 2018.pdf26 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Guruprasad Divine Residency March 2019.pdf26 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Guruprasad Divine Residency March 2020.pdf26 Oct 2021

How this compares with Mumbai City

62%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 72 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GURUPRASAD DIVINE RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur780+ in Mumbai City

2 kmGURUPRASAD DIVINE RESIDECompleted 92Lapsed / revoked 47Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 231 registered projects within 2 km.

Builder: ROHINTON MEHTA BUILDERS AND DEVELOPERS

ROHINTON MEHTA BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including GURUPRASAD DIVINE RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that GURUPRASAD DIVINE RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GURUPRASAD DIVINE RESIDENCY is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GURUPRASAD DIVINE RESIDENCY?

The registered promoter entity is ROHINTON MEHTA BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GURUPRASAD DIVINE RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GURUPRASAD DIVINE RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GURUPRASAD DIVINE RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GURUPRASAD DIVINE RESIDENCY?

The professionals named in the filing: Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GURUPRASAD DIVINE RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GURUPRASAD DIVINE RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GURUPRASAD DIVINE RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.