Home / Browse projects / Nagpur, Maharashtra / GOVIND ENCLAVE

Completed No litigation declared Residential / Group Housing project

GOVIND ENCLAVE

By CONCRETE DEVELOPERS

RG-MH-47539 · RERA P50500024602 · Last updated on MahaRERA portal: 20 Apr 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 98%
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

GOVIND ENCLAVE is a Residential / Group Housing project by CONCRETE DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500024602 on 24 Feb 2020. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameGOVIND ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • KH 171-5-2
    • CTS NO 130 SHEET NO 78
    • COPORATION HOUSE NO 1154 - A
    • MOUZA DABHA
    • DABHA
    • NAGPUR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440023
  • Pincode440023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500024602
  • ReraGenie IDRG-MH-47539

Builder

  • NameCONCRETE DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAAFC6294L1Z3
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerSANJAY NAGORAO PAIDLEWAR
  • Other registrations4 more →
  • Completed3 of 5
  • Past their filed date1
  • Declared earlier projects8 →

Key dates

this monthRegisteredFeb 2020PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Feb 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOVIND ENCLAVENA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

GOVIND ENCLAVE: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 20 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes85%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%

Parking filed406

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots406
Closed/Covered261
Open Space145

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,925 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6772.35
Proposed, not sanctioned6,422 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAMDASPETH, NAGPUR

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH JAISWAL
ArchitectSANKALP CREATIONS
EngineerSUNIL RATHI
EngineerMEENAKSHI NAGPURE
Chartered AccountantRAM BONDE
PartnerRole in project
CONCRETE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Apr 2024

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD BOOKED.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf20 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC.pdf20 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OC.pdf20 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: sold booked.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERT GOVIND - MARCH -2023.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERT GOVIND - JUNE -2023.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERT GOVIND - SEPT -2023.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 1 Govind Booked sold 31-03-2020.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 2 Govind Booked sold 30-06-2020.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 3 Govind Booked sold 30-09-2020.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 4 Govind Booked sold 31-03-2021.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 5 Govind Booked sold 30-06-2021.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 6 Govind Booked sold 30-09-2021.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 7 Govind Booked sold 31-12-2021.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 8 Govind Booked sold 31-03-2022.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 9 Govind Booked sold 30-06-2022.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 10 Govind Booked sold 30-09-2022.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 11 Govind Booked sold 31-12-2022.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 12 Govind Booked sold 31-03-2023.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 13 Govind Booked sold 30-06-2023.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: 14 Govind Booked sold 30-09-2023.pdf29 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A GOVIND ENCLAVE mar 23.pdf24 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 GOVIND ENCLAVE mar.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate govind mar.pdf21 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Govind jun.pdf21 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate govind sep.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Govind sep.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERT SHREE LAXMI NAGAR MARCH_2023.pdf9 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERT SHREE LAXMI NAGAR_JUNE_2023.pdf9 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERT SHREE LAXMI NAGAR_SEP_2023.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CARTIFICATE GOVIND ENCLAVE MAR 23.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CARTIFICATE GOVIND ENCLAVE_JUN23.pdf9 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GOVIND ENCLVE_FROM 5.pdf9 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 31-3-20 0320-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 30-6-20 0620-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 30-9-20 0920-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 31-12-20 1220-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 31-3-21 0321-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 30-6-21 0621-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 30-9-21 0921-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 31-12-21 1221-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 31-3-22 0322-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 30-6-22 0622-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 30-9-22 0922-2.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 31-12-22 1222-2.pdf11 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 0320-2A.pdf11 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 0321-2A.pdf11 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 0322-2A.pdf11 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 GOVIND ENCLAVE DEC 2022.pdf1 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GOVIND ENCLAVE DECEMBER 2022.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Concrete Developers FORM 5 21-22.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CONCRETE_JUNE_2022.pdf13 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CONCRETE_SEP_2022.pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CONCRETE_JUNE_2022_compressed.pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CONCRETE_SEP_2022_compressed.pdf13 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Certifate Of Percentage of Completion of Work ( Form1).pdf16 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect Certificate Of Percentage of Completion of Work (Form 1)_1_11zon.pdf16 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect Certificarte OF Percentage of Completion of Work (Form 1)_1_11zon.pdf16 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate of project cost and fund withdrawl (form3).pdf16 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate of Project and Fund Withdrawal (Form 3).pdf16 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Certificate Of Project and Fund Withdrawal ( Form3).pdf16 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Govind enclave 19-20.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Govind enclave 20-21.pdf30 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31032021.pdf15 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE JUNE 21.pdf15 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31122020.pdf9 Aug 2021
Proforma of Allotment letterFile: Agreement to sale.pdf21 Feb 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf21 Feb 2020
Declaration in FORM BFile: FORM B DECLARATION.pdf6 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REDUCED CA CERTIFICATE.pdf6 Feb 2020
Layout approvalFile: layout plan.pdf4 Feb 2020
Building plan approvalFile: PLAN NO1.pdf4 Feb 2020

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise5 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
DEV DATTA HEIGHTSP50500049650DHANTOLI, Nagpur46Feb 2023Certificate SignedSep 2026Oct 2024
RAGHAV HEALTH STARP50500051632RAMDASPETH, Nagpur24Jun 2023Certificate SignedMay 2026Oct 2025
NARENDRA HEIGHTSP50500015511Narendra Nagar, Nagpur-Mar 2018Certificate SignedFeb 2022Late, Jun 2025
Narayana HeightsNarayana Heights Dhantoli Nagpur28-CompletedJan 2017Late, Mar 2017
Vasundhara EnclaveVasundhara Enclave Plot No 1 Near Narendra Nagar Flyover Narendra Nagar Nagpur134-CompletedFeb 2016Late, Mar 2016
Hare Krishna EnclaveHare Krishna Enclave Plot No. 22 Shivaji Nagar Nagpur14-CompletedOct 2015Late, Dec 2015
Gauri HeightsGauri Heights Plot No. 3 & 4 Canal Road Ramdaspeth Nagpur22-CompletedMay 2015Late, Jul 2015

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOVIND ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DABHA, NAGPUR2,800+ in Nagpur

2 kmGOVIND ENCLAVECompleted 20Lapsed / revoked 13Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: CONCRETE DEVELOPERS

CONCRETE DEVELOPERS has 5 registrations on MahaRERA, including NARENDRA HEIGHTS and GOVIND ENCLAVE. Its filings disclose 8 earlier MahaRERA projects: declares 2 of 8 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if GOVIND ENCLAVE is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOVIND ENCLAVE?

The registered promoter entity is CONCRETE DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAAFC6294L1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOVIND ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOVIND ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOVIND ENCLAVE?

The professionals named in the filing: Architect: RAJESH JAISWAL; Architect: SANKALP CREATIONS; Engineer: SUNIL RATHI; Engineer: MEENAKSHI NAGPURE; Chartered Accountant: RAM BONDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOVIND ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOVIND ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOVIND ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.