NARENDRA HEIGHTS
RG-MH-07997 · RERA P50500015511 · Last updated on MahaRERA portal: 30 Nov 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NARENDRA HEIGHTS is a Residential / Group Housing project by CONCRETE DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500015511 on 7 Mar 2018. The registration is recorded completed; possession was promised by 28 Feb 2022.
At a glance
Project
- NameNARENDRA HEIGHTS
- TypeResidential / Group Housing
- Location
- Narendra Nagar
- Nagpur (Urban)
- Nagpur
- 440015
- Pincode440015
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500015511
- ReraGenie IDRG-MH-07997
Builder
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Mar 2018
- Promised completion28 Feb 2022
- Revised completionNone
- Buildings1 building record
- Documents filed94 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Narendra Heights | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
Narendra Heights: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 75% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 30 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed63
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shri Pravin Bhaskarrao Borkute | Nagpur (M Corp.) | Nagpur |
| Shri Dattatraya Gopalrao Borkute | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajesh Jaiswal |
| Engineer | Arun Uttarwar |
| Partner | Role in project |
|---|---|
| CONCRETE DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Dec 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Feb 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jan 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Nov 2023
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OCCUPANCY CERTIFICATE 1.pdf | 30 Nov 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OCCUPANCY CERTIFICATE 2.pdf | 30 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Narendra height 19-20.pdf | 30 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Narendra height 20-21.pdf | 30 Sep 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: PAN CARD.pdf | 23 Aug 2021 |
| Status of ConveyanceFile: FDODNarendra Heights1.pdf | 23 Aug 2021 |
| Status of ConveyanceFile: FDODNarendra Heights2.pdf | 23 Aug 2021 |
| Status of ConveyanceFile: FDODNarendra Heights3.pdf | 23 Aug 2021 |
| Status of ConveyanceFile: FDODNarendra Heights4.pdf | 23 Aug 2021 |
| Status of ConveyanceFile: FDODNarendra Heights5.pdf | 23 Aug 2021 |
| Status of ConveyanceFile: FDODNarendra Heights6.pdf | 23 Aug 2021 |
| Status of ConveyanceFile: FDODNarendra Heights7.pdf | 23 Aug 2021 |
| Status of ConveyanceFile: FDODNarendra Heights8.pdf | 23 Aug 2021 |
| Status of ConveyanceFile: FDODNarendra Heights9.pdf | 23 Aug 2021 |
| Status of ConveyanceFile: FDODNarendra Heights10.pdf | 23 Aug 2021 |
| Certificates of CA (Form 3)File: FINAL FORM 3 CA CERTIFICATE 10112020.pdf | 15 Aug 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 RERA.pdf | 2 Aug 2021 |
| OtherFile: PART OCCUPANCY CERTIFICATE.pdf | 2 Aug 2021 |
| OtherFile: PART OCCUPANCY CERTIFICATE F.pdf | 2 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 30062018.pdf | 29 Jan 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 30062019.pdf | 29 Jan 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 30092018.pdf | 29 Jan 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 30092019.pdf | 29 Jan 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 31032018.pdf | 29 Jan 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 31032019.pdf | 29 Jan 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 31122018.pdf | 29 Jan 2020 |
| Building plan approvalFile: PLAN - 1.pdf | 9 Jan 2020 |
| Building plan approvalFile: PLAN - 2.pdf | 9 Jan 2020 |
| Building plan approvalFile: PLAN - 3.pdf | 9 Jan 2020 |
| Building plan approvalFile: PLAN - 4.pdf | 9 Jan 2020 |
| Building plan approvalFile: PLAN - 5.pdf | 9 Jan 2020 |
| Building plan approvalFile: PLAN - 6.pdf | 9 Jan 2020 |
| Building plan approvalFile: PLAN - 7.pdf | 9 Jan 2020 |
| Building plan approvalFile: PLAN - 8.pdf | 9 Jan 2020 |
| Building plan approvalFile: PLAN - 9.pdf | 9 Jan 2020 |
| Building plan approvalFile: PLAN - 10.pdf | 9 Jan 2020 |
| Building plan approvalFile: PLAN - 11.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 1.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 2.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 3.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 4.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 5.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 6.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 7.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 8.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 9.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 10.pdf | 9 Jan 2020 |
| Building Plan Approval (IOD)File: PLAN - 11.pdf | 9 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Building permit revised 19092018.pdf | 9 Jan 2020 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 310318.pdf | 9 Jan 2020 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 300618.pdf | 9 Jan 2020 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 300918.pdf | 9 Jan 2020 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 311218.pdf | 9 Jan 2020 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 310319.pdf | 9 Jan 2020 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 300619.pdf | 9 Jan 2020 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 300919.pdf | 9 Jan 2020 |
| Certificates of CA (Form 5)File: CONCRETE_compressed.pdf | 30 Sep 2019 |
| Certificates of CA (Form 5)File: CONCRETE DEVELOPERS.pdf | 29 Sep 2018 |
| Certificates of CA (Form 3)File: FORM_3_-_CA_CERTIFICATE.pdf | 3 Mar 2018 |
| Declaration in FORM BFile: Form - B - Declaration.pdf | 1 Mar 2018 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER - NARENDRA HEIGHTS.pdf | 28 Feb 2018 |
| Proforma of Allotment letterFile: UNDERTAKING.pdf | 28 Feb 2018 |
| Layout approvalFile: Layout Plan.pdf | 21 Feb 2018 |
| Details of encumbrancesFile: Encumberance Certificate.pdf | 21 Feb 2018 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 21 Feb 2018 |
| PAN CardFile: PAN CARD - CONCRETE DEVELOPERS.pdf | 19 Feb 2018 |
| Building plan approvalFile: Sanction Plan No - 1.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 2.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 3.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 4.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 5.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 6.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 7.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 8.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 9.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 10.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 11.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 12.pdf | 23 Dec 2017 |
| Building plan approvalFile: Sanction Plan No - 13.pdf | 23 Dec 2017 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 23 Dec 2017 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| DEV DATTA HEIGHTSP50500049650 | DHANTOLI, Nagpur | 46 | Feb 2023 | Certificate Signed | Sep 2026 | Oct 2024 |
| RAGHAV HEALTH STARP50500051632 | RAMDASPETH, Nagpur | 24 | Jun 2023 | Certificate Signed | May 2026 | Oct 2025 |
| GOVIND ENCLAVEP50500024602 | DABHA, NAGPUR, Nagpur | - | Feb 2020 | Certificate Signed | Dec 2024 | Late, Mar 2025 |
| Narayana Heights | Narayana Heights Dhantoli Nagpur | 28 | - | Completed | Jan 2017 | Late, Mar 2017 |
| Vasundhara Enclave | Vasundhara Enclave Plot No 1 Near Narendra Nagar Flyover Narendra Nagar Nagpur | 134 | - | Completed | Feb 2016 | Late, Mar 2016 |
| Hare Krishna Enclave | Hare Krishna Enclave Plot No. 22 Shivaji Nagar Nagpur | 14 | - | Completed | Oct 2015 | Late, Dec 2015 |
| Gauri Heights | Gauri Heights Plot No. 3 & 4 Canal Road Ramdaspeth Nagpur | 22 | - | Completed | May 2015 | Late, Jul 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 94 filed documents as one ZIP, foldered, with a manifest
Keep NARENDRA HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Narendra Nagar2,800+ in Nagpur
STRAWBERRY FARM
MEGHA AMOL WALKE
OFFICERS ENCLAVE
R SANDESH INFRASTRUCTURES PRIVATE LIMITED
WHITE TIGER AND WILD FLOWER
MILINDKUMAR BHAURAO MESHRAM
PALAZZO ROYAL
INTERCONTINENTAL OASIS INFRA LLP
gokul
surendra mangaldas chadda
Sai Villa 5
Earth Infra Venture
See every Nagpur project, with the district possession charts
Builder: CONCRETE DEVELOPERS
CONCRETE DEVELOPERS has 5 registrations on MahaRERA, including NARENDRA HEIGHTS and GOVIND ENCLAVE. Its filings disclose 8 earlier MahaRERA projects: declares 2 of 8 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if NARENDRA HEIGHTS is delayed beyond 28 Feb 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NARENDRA HEIGHTS?
The registered promoter entity is CONCRETE DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAAFC6294L1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NARENDRA HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NARENDRA HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NARENDRA HEIGHTS?
The professionals named in the filing: Architect: Rajesh Jaiswal; Engineer: Arun Uttarwar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NARENDRA HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.