Home / Browse projects / Nagpur, Maharashtra / RAGHAV HEALTH STAR
RAGHAV HEALTH STAR
RG-MH-70937 · RERA P50500051632 · Last updated on MahaRERA portal: 29 May 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAGHAV HEALTH STAR is a Commercial project by CONCRETE DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500051632 on 27 Jun 2023. The registration is recorded completed; possession was promised by 31 May 2026. 15 of the 24 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameRAGHAV HEALTH STAR
- TypeCommercial
- Location
- CENTRAL BAZAR ROAD
- RAMDASPETH
- Nagpur (Urban)
- Nagpur
- 440010
- Pincode440010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500051632
- ReraGenie IDRG-MH-70937
Builder
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Jun 2023
- Promised completion31 May 2026
- Revised completionNone
- Buildings1 building record
- Documents filed82 files
Current status
Figures as on 29 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RAGHAV HEALTH STAR | NA | 13 | 11 | 0 | 24 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.
RAGHAV HEALTH STAR: 54% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed66
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHRI. SAMEER D. MEGHE AND SMT. VRINDA S. MEGHE | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RAGHAV HEALTH STAR | NA | Rs 21.00 cr | Rs 15.04 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRIYANKA MEGHE |
| Architect | MEENAKSHI NAGPURE |
| Engineer | MILIND AWASARMOL |
| Engineer | MEENAKSHI NAGPURE |
| Engineer | Shahbaz Shaikh |
| Chartered Accountant | RAM BONDE |
| Chartered Accountant | RATAN CHANDAK & CO LLP |
| Partner | Role in project |
|---|---|
| CONCRETE DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 29 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 29 May 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 29 May 2026 |
| Occupational CertificateFile: OC.pdf | 29 May 2026 |
| Form 1File: Architects Certificate Dec 25.pdf | 21 Jan 2026 |
| Form 2File: Engineer Certificate Dec 25.pdf | 21 Jan 2026 |
| Form 3File: CA Certificate Dec 25.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold and booked inventory dec 25.pdf | 21 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25 Raghav Healthstar.pdf | 15 Nov 2025 |
| Form 1File: Form 1.pdf | 20 Oct 2025 |
| Form 2File: Form 2.pdf | 20 Oct 2025 |
| Form 3File: Form 3.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf | 20 Oct 2025 |
| Form 2A (FY 2024-2025)File: Raghav Health star -Form 2A.pdf | 30 Sep 2025 |
| Form 1File: Architect Certificate.pdf | 20 Jul 2025 |
| Form 2File: Engineer Certificate.pdf | 20 Jul 2025 |
| Form 3File: CA certificate.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Book Inventory.pdf | 20 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 26 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD bookd.pdf | 14 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: raghav.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: raghav health star.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold booked.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A RAGHAV.pdf | 7 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Raghav Health Star From 5.pdf | 4 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RAGHAV HEALTH STAR -JUNE.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: sold booked.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Raghav SEP.pdf | 22 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate raghav sep.pdf | 21 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Raghav jun.pdf | 21 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Raghav sep.pdf | 21 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Raghav sep.pdf | 21 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR_CERTIFICATE RAGHAV HEALTH STAR JUNE_2023.pdf | 9 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CARTIFICATE RAGHAV HEALTH_JUN 23.pdf | 9 Nov 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER - FINAL.pdf | 15 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: DECLARATION ON ALLOTMENT LETTER - FINAL.pdf | 15 Jun 2023 |
| Layout approvalFile: layout plan_compressed.pdf | 7 Jun 2023 |
| Building plan approvalFile: SANCTION BUILDING PLAN_Page_1.pdf | 7 Jun 2023 |
| Building plan approvalFile: SANCTION BUILDING PLAN_Page_2.pdf | 7 Jun 2023 |
| Building plan approvalFile: SANCTION BUILDING PLAN_Page_3.pdf | 7 Jun 2023 |
| Building plan approvalFile: SANCTION BUILDING PLAN_Page_4.pdf | 7 Jun 2023 |
| Building plan approvalFile: SANCTION BUILDING PLAN_Page_5.pdf | 7 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: layout plan_compressed.pdf | 7 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTION BUILDING PLAN_Page_1.pdf | 7 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTION BUILDING PLAN_Page_2.pdf | 7 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTION BUILDING PLAN_Page_3.pdf | 7 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTION BUILDING PLAN_Page_4.pdf | 7 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTION BUILDING PLAN_Page_5.pdf | 7 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NEW FORM 3.pdf | 7 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: DECLARATION - LEGAL TITLE REPORT.pdf | 12 May 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE.pdf | 12 May 2023 |
| Details of encumbrances concerned to LegalFile: DECLARATION - LEGAL TITLE REPORT.pdf | 12 May 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE.pdf | 12 May 2023 |
| Declaration about Commencement CertificateFile: DECLARATION COMMENCEMENT CERTIFIATE.pdf | 12 May 2023 |
| Declaration in FORM BFile: FORM B - BY DEVELOPERS.pdf | 12 May 2023 |
| CERSAI detailsFile: DECLARATION - CERSAI REPORT.pdf | 12 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE -A - DISCLOUSE OF INTEREST.pdf | 12 May 2023 |
| Proforma of Agreement for saleFile: Agreement to sale - DRAFT.pdf | 12 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK.pdf | 12 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OF AGREEMENT TO SELL.pdf | 12 May 2023 |
| PAN CardFile: CONCRETE DEVELOPERS - PAN CARD.pdf | 11 May 2023 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| DEV DATTA HEIGHTSP50500049650 | DHANTOLI, Nagpur | 46 | Feb 2023 | Certificate Signed | Sep 2026 | Oct 2024 |
| GOVIND ENCLAVEP50500024602 | DABHA, NAGPUR, Nagpur | - | Feb 2020 | Certificate Signed | Dec 2024 | Late, Mar 2025 |
| NARENDRA HEIGHTSP50500015511 | Narendra Nagar, Nagpur | - | Mar 2018 | Certificate Signed | Feb 2022 | Late, Jun 2025 |
| Narayana Heights | Narayana Heights Dhantoli Nagpur | 28 | - | Completed | Jan 2017 | Late, Mar 2017 |
| Vasundhara Enclave | Vasundhara Enclave Plot No 1 Near Narendra Nagar Flyover Narendra Nagar Nagpur | 134 | - | Completed | Feb 2016 | Late, Mar 2016 |
| Hare Krishna Enclave | Hare Krishna Enclave Plot No. 22 Shivaji Nagar Nagpur | 14 | - | Completed | Oct 2015 | Late, Dec 2015 |
| Gauri Heights | Gauri Heights Plot No. 3 & 4 Canal Road Ramdaspeth Nagpur | 22 | - | Completed | May 2015 | Late, Jul 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
Keep RAGHAV HEALTH STAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAMDASPETH2,800+ in Nagpur
Filed coordinates, straight-line distance. 170 registered projects within 2 km.
AADHAR NAGRI - II
S R INFRA
Metrocity-3
Metrocity Projects
KUKREJA WEST19
TAGSURE HOSPITALITY LLP
IMPERIAL GARDEN
Gaurav Agrawal
SHREERAM SKYLINE
CONCRETE DEVELOPERS
THE RHYTHM
RADHESANDESH REALTORS LLP
See every Nagpur project, with the district possession charts
Builder: CONCRETE DEVELOPERS
CONCRETE DEVELOPERS has 5 registrations on MahaRERA, including NARENDRA HEIGHTS and GOVIND ENCLAVE. Its filings disclose 8 earlier MahaRERA projects: declares 2 of 8 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if RAGHAV HEALTH STAR is delayed beyond 31 May 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAGHAV HEALTH STAR?
The registered promoter entity is CONCRETE DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAAFC6294L1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAGHAV HEALTH STAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAGHAV HEALTH STAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAGHAV HEALTH STAR?
The professionals named in the filing: Architect: PRIYANKA MEGHE; Architect: MEENAKSHI NAGPURE; Engineer: MILIND AWASARMOL; Engineer: MEENAKSHI NAGPURE; Engineer: Shahbaz Shaikh; Chartered Accountant: RAM BONDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAGHAV HEALTH STAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback